ML17300B279

From kanterella
Jump to navigation Jump to search
Discusses Arrangements Made for Administration of Licensing Exams at Plant During Wk of 961118,per 960619 Telcon. Proposed Exam Outlines Should Be Furnished by 960918,in Order to Meet Schedule
ML17300B279
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/27/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 9607030164
Download: ML17300B279 (13)


Text

CATEGORY 2 REGULATORY INFORMATION DISTRIBUTION SYSTEM (R DS)

ACCESSION'BR:9607030164 DOC.DATE: 96/06/27 NOTARIZED:

NO DOCKET "ACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION GWYNN,T.P.

Region 4 (Post 820201) q(-ld RECIP.NAME RECIPIENT AFFILIATION STEWART,W.L.

Arizona Public Service Co.

(formerly Arizona Nuclear Power C

SUBJECT:

Discusses arrangements made for administration of licensing exams at plant during wk of 961118,per 960619 telcon.

A Proposed exam outlines should be furnished by 960918,in order to meet schedule.

T DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Znsp Rept/Notice of Violation Response NOTES:STANDARDIZED PLANT Standardized plant.

Standardized plant.

7 E

G 05000528 050005290 05000530 R

RECIPIENT ID CODE/NAME PD4-2 PD CLZFFORD,J.

RNAL: ACRS AEOD/KTC

/+FILE CENTERS NRR/DRCH/HHFB NRR/DRPM/PERB OE DIR RGN4 FILE 01 COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME CLIFFORD,J AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRPM/PECB NUDOCS-ABSTRACT OGC/HDS2 COPIES LTTR ENCL 1

1 1

1 1

1 1

~ 1 1

1 1

1 1

1 D

EXTERNAL: LITCO BRYCE,J H

NRC PDR 1

1 1-1 NOAC 1

1 E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-S(EXT.'15-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

~>f; ~EGA Cg

'I i

s~(

C

/p UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 JUN 27 l996 William L. Stewart, Executive Vice President.

Nuclear Arizona Public Service Company P.O.

Box 53999 Phoenix.

Arizona 85072-3999

SUBJECT:

PILOT INITIAL EXAMINATION (50-528/96-14; 50-529/96-14; 50-530/96-14)

In a telephone conversation on June 19.

1996, between Messrs.

Bob Nunez.

Operations Training Department Leader of your staff, and Stephen L. McCrory of my staff, arrangements were made for the administration of licensing examinations at Palo Verde Nuclear Generating Station during the week of November 18, 1996.

Based on this telephone conversation.

we understand that your staff has agreed to participate in a voluntary pilot examination

program, in which your staff will prepare the written examinations and operating tests and submit them to this office for evaluation and approval.

Your staff will prepare the proposed examinations in accordance with the guidelines in Revision 7, Supplement

1. of NUREG-1021, "Operator Licensing Examiner Standards."

Revision 5, of NUREG/BR-0122, "Examiners'andbook for Developing Operator Licensing Written Examinations."

and the attachment to this letter.

We wi 11 discuss with your staff any examination changes that might be necessary prior to their administration.

To meet the above schedule. it will be necessary for your staff to furnish the proposed examination outlines by September 18, 1996. the finalized written and operating examinations by October 18, 1996.

The NRC wi 11 review the completed and validated examinations at your.taci lity the week of November 4, 1996.

Any delay in receiving approved test outlines or the submittal of inadequate or incomplete test materials, may result in the examinations being rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with Examiner Standard-402 and to make the simulation facility available for the weeks noted above.

Examiner Standards-402s, Attachment 1.

and -302. Attachment

1. contain a

number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

In accordance with Examiner Standard-302 'our staff should retain the original simulator performance data (e.g..

system pressures, temperatures, and levels) generated during the dynamic operating tests unti l the examination results are final.

9607030l64 96062T PDR ADQCK 05000528 P

PDR

Arizona Public Service Company Your staff should submit the preliminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers.

If the applications are not received at least 30 days before the examination date, a

postponement may'e necessary.

Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30, 1997.

The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing.

and mailing the required material.

Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden. to the Information and Records Management

Branch, Mail Stop T-6 F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commissions Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101).

Office of Information and Regulatory Affairs'EOB-10202, Office of Management and Budget, Washington, D.C. 20503.

Thank you for your cooperation in this matter.

Mr. Nunez has been advised of the policies and guidelines referenced in this letter.

If you have any questions regarding this inspection, please contact Stephen McCrory, at (817)860-8265 or John Pellet, Chief, Operations Branch at (817)860-8159.

Sincer Dockets:

50-528 50-529 50-530 Licenses:

NPF-41 NPF-51 NPF-74

Enclosure:

Pilot Examination Guidelines cc w/enclosure:

Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix.

Arizona 85007 homas P.

Gwynn, ire or Division of React a

lI 0

Arizona Public Service Company Douglas K. Porter, Senior Counsel Southern Cali fornia Edison Company Law Department, Generation Resources P.O.

Box 800 Rosemead.

California 91770 Aubrey V. Godwin

~ Director Arizona Radiation Regulatory Agency 4814 South 40 Street

Phoenix, Arizona 85040 Chairman Maricopa County Board of Supervisors ill South Third Avenue Phoenix.

Arizona 85003 Angela K. Krainik, Manager Nuclear Licensing Arizona Public Service Company P.O.

Box 52034

Phoenix, Arizona 85072-2034 John C. Horne.

Vice President Power Supply Palo Verde Services 2025 N. Third Streets Suite 220

Phoenix, Arizona 85004

e Arizona Public Service Company E-Mail report to D. Nelson (DJN)

E-Hail report to NRR Event Tracking System (IPAS)

E-Hail report to Michael Davis (HJD1) bcc to DMB (IE01) (IE42) bcc distrib.

by RIV:

L. J. Callan DRP Director Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, HS:

TWFN 9E10)

Richards (NRR/HOLB, OWFN 10D22)

L. Hurley Resident Inspector DRS-PSB HIS System RIV File H.

Hammond (PAO, WCFO)

DOCUMENT NAME:

R:KPV614LT.slm To receive copy of document, Indicate ln box: "C" = Copy without enctosures "E" -" Cop enct sures "N"= No copy RIV:RE:OB SMcCrory 06/go/96 C:OB JPellet 06

/96 D:DRS TP nn 0 /

/96 C:PBF DKirsch 06/

96 D:DR TPGwynn 06P

/96

ENCLOSURE PILOT EXAMINATIONGUIDELINES Facility licensees will prepare the written examinations and operating tests (dynamic simulator and walkthrough) in accordance with the instructions in Revision 7, Supplement 1.

of'NUREG-1021 ("Operator Licensing Examiner Standards" ) and Revision 5 of NUREG/BR-0122 ("Examiners'andbook for Developing Operator Licensing Written Examinations" ), subject to the following additional criteria:

(I)

The facility licensee will prepare an integrated examination outline (written and operating test) and submit it to the NRC regional office for review,

comment, and approval at least 60 days before the scheduled examination date.

The NRC chief examiner wi 11 work with the facility licensee to resolve any problems and to avoid unnecessary revision of the final examination products.

(2)

Facility employees who are involved with developing the examinations and tests will sign a standard security agreement (Form ES-201-2) before they gain specific knowledge of the examinations and tests.

Facility employees who played a substantial role in training the license applicants will generally not be involved in developing the license examinations or tests.

If the facility licensee considers such employees necessary for developing the examinations or tests, it will define the measures it will take to ensure that the integrity of the examinations is not compromised and submit them to the NRC regional office for approval.

(3)

The written examinations and operating tests will satisfy the following specific criteria:

A maximum of 50'ercent of the written examination questions may be taken directly from the facility question bank; up to an additional 40 percent of the questions may be taken from the facility bank but must be significantly modified; and a minimum of 10 percent of the questions will be newly developed.

As discussed in NUREG/BR-0122.

new questions should emphasize the applicants'nderstanding at the comprehension or application levels of knowledge because they have the greatest operational and discriminatory validity.

No more than 25 percent of the questions on the examination may be repeated from previous examinations.

quizzes, or tests administered to the license applicants'r from the past two NRC license examinations at the facility.

No question's may be drawn directly from the applicants'udit examination or similar testing vehicle given at the end of the training class.

Each walkthrough test will include at least two job performance measures (JPMs) that are either new or significantly altered, and each simulator scenario set will include at least one new or significantly altered scenario.

Other scenarios used may be drawn

,i

7 directly from the facility scenario bank;

however, they will be altered to the degree needed to prevent the applicants from immediately recognizing the scenarios based on initial conditions or other cues.

A significant modifications for purposes of the written questions, means a change to the conditions in the stem and at least one distractor significantly changed.

Similarly. JPMs and simulator scenarios will have at least one substantive event or condition change that alters the course of action in the JPM or scenario.

(4)

The facility licensee wi 11 submit the final written examinations and operating tests to the NRC regional office at least 30 days before the scheduled examination date.

In its submittal, the facility licensee will include a history (e.g.,

bank, revised,
new, and date last used) of each test item used on the written and operating tests.

(5)

The NRC regional office will assign a chief examiner to coordinate the review, revision (as determined necessary by the NRC),

and validation of the written examinations and operating tests with the facility licensee.

Additional NRC staff examiners will be assigned as necessary (typically one or two, depending on the number of applicants) to assist the chief examiner with administering and grading the operating tests in accordance with existing procedures.

The facility l.icensee will'dminister and grade the written examinations; NRC examiners wi 11 review and approve the licensee's grading.

Arizona Public Service Company E-Mail report to D. Nelson (DJN)

E-Hail report to NRR Event Tracking System

( IPAS)

E-Hail report to Michael Davis (MJD1)

~o-DMB-.;(-11013=-( IE42)=-.

~

bcc distrib. by RIV:

L. J. Callan DRP Director Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS:

TWFN 9E10)

Richards (NRR/HOLB, OWFN 10D22)

L. Hurley Resident Inspector DRS-PSB MIS System RIV File M.

Hammond (PAO.

WCFO)

DOCUMENT NAME:

R:KPV614LT.slm To receive copy of document, Indicate In box: "C" = Copy without enclosures "E" = Cop encl sures "N" = No copy SHcCrory 06/g~'/96 JPellet 06

/96 RIV:RE:OB y

C:OB D: DRS TPG nn 0 /

/96 C: PBF gE DKirsch 06/

96 D:DR TPGwynn 06P

/96

0'