ML17300B258

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/96-08,50-529/96-08 & 50-530/96-08 on 960513-17 & Notice of Violation
ML17300B258
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 06/21/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Stewart W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17300B259 List:
References
NUDOCS 9606260041
Download: ML17300B258 (11)


See also: IR 05000528/1996008

Text

CATEGORY

2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:960

ACIL:STN-50-528

STN-50-529

STN-50-530

AUTH.NAME

GWYNNtT.P.

RECIP.NAME

STEWARTPW.L.

DOCKET

05000528

05000529

05000530

6260041

DOC.DATE: 96/06/21

NOTARIZED: NO

Palo Verde Nuclear Station, Unit 1, Arizona Publi

Palo Verde Nuclear Station, Unit 2, Arizona Publi

Palo Verde Nuclear Station, Unit 3, Arizona Publi

AUTHOR AFFILIATION

Region

4 (Post

820201)

RECIPIENT AFFILIATION

Arizona Public Service

Co. (formerly Arizona Nuclear

Power

SUBJECT:

Forwards insp repts 50-528/96-08,50-529/96-08

& 50-530/96-08

on 960513-17

& notice of violation.

DISTRIBUTION CODE:

IEOID

COPIES RECEIVED:LTR g ENCL

I

SIZE: 5

i[5

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:STANDARDIZED PLANT

Standardized

plant.

Standardized

plant.

RECIPIENT

ID CODE/NAME

PD4-2

PD

CLIFFORDEJ ~

I'NTERNAL: ACRS

ILE CENT

HFB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

COPIES

LTTR ENCL

1

1

1

1

2

2

1

1

1

1

1

1

1

l.

1

1

1

'

RECIPIENT

ID CODE/NAME

CLIFFORDPJ

AEOD/SPD/RAB

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

E

05000528

05000529

6

05000530

0

D

EXTERNAL: LITCO BRYCE,J

H

NRC

PDR

1

1

1

1

NOAC

1

1

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US

TO REDUCE WASTE!

CONTACT THE DOCUMENT CONTROL DESK,

ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM

DISTRIBUTION LISTS

FOR

DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011 8064

June

21

~

1996

Arizona Public Service

Company

ATTN:

William L. Stewart

Executive Vice President.

Nuclear

P.O.

Box 53999

Phoenix,

Arizona

85072-3999

SUBJECT:

NRC INSPECTION REPORT 50-528/96-08;

50-529/96-08;

50-530/96-08

AND NOTICE OF VIOLATION

This refers to the inspection

conducted

by Mr. A. B. Earnest of this office on

May 13-17,

1996. at the Palo Verde Nuclear Generating Station.

Units 1, 2.

and 3.

The purpose of the inspection

was to determine whether activities

authorized

by the license were conducted safely and in accordance

with NRC

requirements.

At the conclusion of the inspection,

the findings were

discussed

with you and those

members of'our staff identified in the enclosed

report.

The physical security program areas

examined during the inspection are

identified in the report.

Within these

areas,

the inspection consisted of

selective examinations of procedures

and representative

records,

interviews

with personnel,

and observation of activities in progress.

Based

on the results of this inspection,

the

NRC has determined that

a

violation of NRC requi rements

occurred.

The violation is cited in the

enclosed

Notice of Violation (Notice) and the circumstances

surrounding the

violation are described

in detail in the subject inspection report.

Your

staff has expressed

the opinion that this violation meets the criteria to not

be cited.

However,

because it involved three

examples of repeated

problems in

complying with access

authorization requirements,

a citation has

been

determined to be appropriate.

You are required to respond to this letter

and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should document the specific actions taken

and any additional

actions you plan to prevent recurrence.

After reviewing your response to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine whether further enforcement action is

necessary

to ensure

compliance with regulatory requirements.

The responses

directed

by this letter and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980 'ub.

L. No. 96.511.

960626004i

96062i

PDR

ADQCK 05000528

8

PDR

II

II

Arizona Public Service

Company

-2-

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Dockets:

50-528

50-529

50-530

Licenses:

NPF-41

'NPF-51

NPF-74

Enclosures:'.

Notice of Violation

2.

NRC Inspection Report

50-528/96-08:

50-529/96-08;

50-530/96-08 w/attachment

cc w/enclosures:

Arizona Corporation

Commission

ATTN:

Mr. Steve

Olea

1200

W. Washington Street

Phoenix,

Arizona

85007

Southern California Edison

Company

ATTN:

T.

E. Oubre.

Esq.

P.O.

Box 800

Rosemead.

California

91770

Arizona Radiation Regulatory Agency

ATTN:

Aubrey V. Godwin. Director

4814 South 40 Street

Phoenix.

Arizona

85040

Cr'tw + y

Tlj mas

P.

Gvf nn,

irector

givision of R 'ctor Safety

Maricopa County Board of Supervisors

ATTN:

Chairman

111 South Third Avenue

Phoenix,

Arizona

85003

Arizona Public Service

Company

Palo Verde Services

ATTN:

Curtis Hoskins,

Executive

Vice President

and

Chief Operating Officer

2025

N. 3rd Streets

Suite

220

Phoenix.

Arizona

85004

Akin, Gump, Strauss.

Hauer

and Feld

El Paso Electric Company

ATTN:

Roy P.

Lessey, Jr.,

Esq.

1333

New Hampshire

Avenue. Suite 400

Washington,

D.C.

20036

Arizona Public Service

Company

ATTN:

Angela

K. Krainik. Manager

Nuclear Licensing

P.O.

Box 52034

Phoenix,

Arizona

85072-2034

Palo, Verde Services

ATTN:

John

C.

Horn

~ Vice President

~

~

~

Power Supply

2025

N. Third Street.

Suite 220

Phoenix,

AZ

85004

N

Arizona Public Service

Company

E-Mail report to D. Nelson

(DJN)

E-Mail report to

NRR Event Tracking System

(IPAS)

bcc to

DHB (IE01)

bcc disbrib by RIV:

Palo Verde Resident

Inspector

DRSS/RIB Security File

RIV File (Original document except cover letter )

Elaine Koup,

NRR/DOTS/TSGB

(HS 9 D24)

L. J. Callan

RIV File

HIS System

Branch Chief (DRP/F.

WCFO)

Senior Project Inspector

(DRP/F,

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB,

HS:

TWFN 9E10)

B. Henderson

(PAO,

WCFO)

B. Holian,

NRR Project

Manager

(MS 13 E18)

L. Tran,

NRR Project

Manager

(HS 13 E16)

DRS AI 96-G-0079

DOCUMENT NAME:

R:N PVKPV608RP.ABE

To receive copy of document, indicate in box: "C" = Copy wit out enctosures

"E" = Copy pith enctosures "N"= No copy

C:PSB

E

PSS:PSB

E

ABEarnest:cg*

BHurr ay*

06/

/96

06/

/96

rev)ous y

oncurre

DD:DR

TPGw nn

06/

/9

D:DRP

E

DKirsch

06/

/96

D:DRS

N

TPGwynn I

06/'t,

96'

Arizona Public Service

Company

-4-

E-Hail report to D. Nelson

(DON)

E-Hail report to

NRR Event Tracking System

( IPAS)

Pcc;to

DMB (IE01)

bcc disbrib by RIV:

Palo Verde Resident

Inspector

DRSS/RIB Security File

RIV File (Original document except cover letter)

Elaine Koup.

NRR/DOTS/TSGB

(HS 9 D24)

L. J. Callan

RIV File

HIS System

Branch Chief (DRP/F,

WCFO)

Senior Project Inspector

(DRP/F,

WCFO)

Branch Chief (DRP/TSS)

Leah Tremper

(OC/LFDCB.

HS:

TWFN 9E10)

B. Henderson

(PAO,

WCFO)

B. Holian.

NRR Project

Manager

(HS 13 E18)

L. Tran,

NRR Project

Manager

(MS 13 E16)

DRS AI 96-G-0079

DOCUMENT NAME:

R:X PVXPV608RP.ABE

To receive copy of document, indicate in box: "C" = Copy wit out enctosures

"E" = Copy pith enciosures "N" = No copy

PSS:PSB

E

ABEarnest:cg*

BMurray*

TPGw nn

C:PSB

E

DD:DR

D:DRP

E

DKirsch

D:DRS

N

TPGwynn

'6/

/96

  • revious y.

oncurre

06/

/96

06/

/9

06/

/96

06/",i/96