Text
CATEGORY
2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:960
ACIL:STN-50-528
STN-50-529
STN-50-530
AUTH.NAME
GWYNNtT.P.
RECIP.NAME
STEWARTPW.L.
DOCKET
05000528
05000529
05000530
6260041
DOC.DATE: 96/06/21
NOTARIZED: NO
Palo Verde Nuclear Station, Unit 1, Arizona Publi
Palo Verde Nuclear Station, Unit 2, Arizona Publi
Palo Verde Nuclear Station, Unit 3, Arizona Publi
AUTHOR AFFILIATION
Region
4 (Post
820201)
RECIPIENT AFFILIATION
Arizona Public Service
Co. (formerly Arizona Nuclear
Power
SUBJECT:
Forwards insp repts 50-528/96-08,50-529/96-08
& 50-530/96-08
on 960513-17
DISTRIBUTION CODE:
IEOID
COPIES RECEIVED:LTR g ENCL
I
SIZE: 5
i[5
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:STANDARDIZED PLANT
Standardized
plant.
Standardized
plant.
RECIPIENT
ID CODE/NAME
PD4-2
CLIFFORDEJ ~
I'NTERNAL: ACRS
ILE CENT
HFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
COPIES
LTTR ENCL
1
1
1
1
2
2
1
1
1
1
1
1
1
l.
1
1
1
'
RECIPIENT
ID CODE/NAME
CLIFFORDPJ
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS2
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
E
05000528
05000529
6
05000530
0
D
EXTERNAL: LITCO BRYCE,J
H
NRC
1
1
1
1
NOAC
1
1
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US
TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK,
TO ELIMINATE YOUR NAME FROM
DISTRIBUTION LISTS
FOR
DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 8064
June
21
~
1996
Arizona Public Service
Company
ATTN:
William L. Stewart
Executive Vice President.
Nuclear
P.O.
Box 53999
Phoenix,
85072-3999
SUBJECT:
NRC INSPECTION REPORT 50-528/96-08;
50-529/96-08;
50-530/96-08
This refers to the inspection
conducted
by Mr. A. B. Earnest of this office on
May 13-17,
1996. at the Palo Verde Nuclear Generating Station.
Units 1, 2.
and 3.
The purpose of the inspection
was to determine whether activities
authorized
by the license were conducted safely and in accordance
with NRC
requirements.
At the conclusion of the inspection,
the findings were
discussed
with you and those
members of'our staff identified in the enclosed
report.
The physical security program areas
examined during the inspection are
identified in the report.
Within these
areas,
the inspection consisted of
selective examinations of procedures
and representative
records,
interviews
with personnel,
and observation of activities in progress.
Based
on the results of this inspection,
the
NRC has determined that
a
violation of NRC requi rements
occurred.
The violation is cited in the
enclosed
Notice of Violation (Notice) and the circumstances
surrounding the
violation are described
in detail in the subject inspection report.
Your
staff has expressed
the opinion that this violation meets the criteria to not
be cited.
However,
because it involved three
examples of repeated
problems in
complying with access
authorization requirements,
a citation has
been
determined to be appropriate.
You are required to respond to this letter
and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should document the specific actions taken
and any additional
actions you plan to prevent recurrence.
After reviewing your response to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine whether further enforcement action is
necessary
to ensure
compliance with regulatory requirements.
The responses
directed
by this letter and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork
Reduction Act of 1980 'ub.
L. No. 96.511.
960626004i
96062i
ADQCK 05000528
8
II
II
Arizona Public Service
Company
-2-
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Dockets:
50-528
50-529
50-530
Licenses:
NPF-74
Enclosures:'.
2.
NRC Inspection Report
50-528/96-08:
50-529/96-08;
50-530/96-08 w/attachment
cc w/enclosures:
Arizona Corporation
Commission
ATTN:
Mr. Steve
Olea
1200
W. Washington Street
Phoenix,
85007
Southern California Edison
Company
ATTN:
T.
E. Oubre.
Esq.
P.O.
Box 800
Rosemead.
91770
Arizona Radiation Regulatory Agency
ATTN:
Aubrey V. Godwin. Director
4814 South 40 Street
Phoenix.
85040
Cr'tw + y
Tlj mas
P.
Gvf nn,
irector
givision of R 'ctor Safety
Maricopa County Board of Supervisors
ATTN:
Chairman
111 South Third Avenue
Phoenix,
85003
Arizona Public Service
Company
Palo Verde Services
ATTN:
Curtis Hoskins,
Executive
Vice President
and
Chief Operating Officer
2025
N. 3rd Streets
Suite
220
Phoenix.
85004
Akin, Gump, Strauss.
Hauer
and Feld
El Paso Electric Company
ATTN:
Roy P.
Lessey, Jr.,
Esq.
1333
Avenue. Suite 400
D.C.
20036
Arizona Public Service
Company
ATTN:
Angela
K. Krainik. Manager
Nuclear Licensing
P.O.
Box 52034
Phoenix,
85072-2034
Palo, Verde Services
ATTN:
John
C.
Horn
~ Vice President
~
~
~
Power Supply
2025
N. Third Street.
Suite 220
Phoenix,
AZ
85004
N
Arizona Public Service
Company
E-Mail report to D. Nelson
(DJN)
E-Mail report to
NRR Event Tracking System
(IPAS)
bcc to
DHB (IE01)
bcc disbrib by RIV:
Palo Verde Resident
Inspector
DRSS/RIB Security File
RIV File (Original document except cover letter )
Elaine Koup,
NRR/DOTS/TSGB
(HS 9 D24)
L. J. Callan
RIV File
HIS System
Branch Chief (DRP/F.
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB,
HS:
TWFN 9E10)
B. Henderson
(PAO,
WCFO)
B. Holian,
NRR Project
Manager
(MS 13 E18)
L. Tran,
NRR Project
Manager
(HS 13 E16)
DRS AI 96-G-0079
DOCUMENT NAME:
R:N PVKPV608RP.ABE
To receive copy of document, indicate in box: "C" = Copy wit out enctosures
"E" = Copy pith enctosures "N"= No copy
C:PSB
E
PSS:PSB
E
ABEarnest:cg*
BHurr ay*
06/
/96
06/
/96
rev)ous y
oncurre
DD:DR
TPGw nn
06/
/9
D:DRP
E
DKirsch
06/
/96
D:DRS
N
TPGwynn I
06/'t,
96'
Arizona Public Service
Company
-4-
E-Hail report to D. Nelson
(DON)
E-Hail report to
NRR Event Tracking System
( IPAS)
Pcc;to
DMB (IE01)
bcc disbrib by RIV:
Palo Verde Resident
Inspector
DRSS/RIB Security File
RIV File (Original document except cover letter)
Elaine Koup.
NRR/DOTS/TSGB
(HS 9 D24)
L. J. Callan
RIV File
HIS System
Branch Chief (DRP/F,
WCFO)
Senior Project Inspector
(DRP/F,
WCFO)
Branch Chief (DRP/TSS)
Leah Tremper
(OC/LFDCB.
HS:
TWFN 9E10)
B. Henderson
(PAO,
WCFO)
B. Holian.
NRR Project
Manager
(HS 13 E18)
L. Tran,
NRR Project
Manager
(MS 13 E16)
DRS AI 96-G-0079
DOCUMENT NAME:
R:X PVXPV608RP.ABE
To receive copy of document, indicate in box: "C" = Copy wit out enctosures
"E" = Copy pith enciosures "N" = No copy
PSS:PSB
E
ABEarnest:cg*
BMurray*
TPGw nn
C:PSB
E
DD:DR
D:DRP
E
DKirsch
D:DRS
N
TPGwynn
'6/
/96
- revious y.
oncurre
06/
/96
06/
/9
06/
/96
06/",i/96