ML17300B129
| ML17300B129 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/26/1987 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 200-00517-EEVB, 200-517-EEVB, NUDOCS 8712140278 | |
| Download: ML17300B129 (4) | |
Text
REGULA Y INFORMATION DISTRIBUTI SYSTEM '(RIDS')
ACCESSION NBR: 8712140278 DQC. DATE: 87/ii/2b NOTARIZED:
NO DOCKET FACIL: STH-50-530 Palo Verde Nuclear Station, Unit 3 Arizona Pub li 05000530 AUTH. NAME AUTHOR AFFILIATION VAN BRUNT'. E.
Arizona Nuclear Poeer Prospect (formerly Arizona Public Serv REC IP. NAME REC IP IENT AFFILIATION MARTINiJ. B.
Region Si Ofc of the Director.
SUBJECT:
Certifies that Item
- 1. a of Attachment 1 re operablitg of al l r equired sos for initial entry into Mode 1 completed.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: Standardized plant.
05000530 RECIPIENT ID CODE/NAME PD5 PD DAVIS'i COPIES LTTR ENCL RECIPIENT ID CODE/NAME LICITRAiE COPIES LTTR ENCL INTERNAL:
ACRS DEDRO NRR/DLPQ/PEB NRR/DREP/EPB NRR/DRIS DIR RMANiJ RGN5 F ILE 01 EXTERNAL:
LPDR NSIC AEOD NRR MORISSEAUi D NRR/DOEA DIR NRR/DREP/RPB NRR/PMAS/ILRB OGC/HDSi RES DEPY GI NRC PDR 1
1 1
1 NOTES:
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 26 ENCL
IP 4!
Arizona Nuclear Power. Project P.O. BOX 52034
~
PHOENIX. ARIZONA 85072-2034'00-00517-EEVB/OJZ November 26, 1987 Hr. John B. Hartin Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission, Region V
1450 Maria Lane " Suite 210 Walnut Creek, California 94596 CD 4d CD Ref.:
PVNGS Unit 3 Operating License - NPF-65
Dear Hr. Hartin:
Subject:
Certification of the Operability of All Required Systems for Initial Entry Into Mode 1 - Palo Verde Unit 3 File:
87-056-026 As required by Item l.b of Attachment 1
to, the Palo Verde Nuclear Generating Unit 3
Operating
- License, NPF-65, I am hereby certifying that Item l.a of Attachment 1 to the license has been completed for the initial entry into Hode l.
The operability of all systems required for the initial entry into Mode 1
has been demonstrated by successfully meeting the acceptance criteria in the PVNGS Technical Specifications.
This has been accomplished by the completion of the applicable surveillance tests or by preoperational testing which verifies meeting the requirements of the Technical Specifications which were performed within the required surveillance interval or by operability as demonstrated for Modes 2, 3, 4, 5, and 6.
Very truly y urs C P a~
n~~
E. E.
Van Brunt, Jr.