Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML17305B0681990-09-17017 September 1990 Forwards Response to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. Exam Dates,Anticipated Number of Candidates & Requalification Exam Schedules for FY91-FY94 Also Encl ML17305B0491990-09-12012 September 1990 Forwards Palo Verde Nuclear Generating Station Unit 2 Steam Generator Eddy Current Exam,Second Refueling Outage Apr 1990. ML17305B0281990-08-27027 August 1990 Forwards fitness-for-duty Semiannual Performance Rept for Period of Jan-June 1990,per 10CFR26.71(d) ML17305B0111990-08-15015 August 1990 Responds to Request for Addl Info Re Emergency Lighting,Per Insp Repts 50-528/90-25,50-529/90-25 & 50-530/90-25. Availability Info Provided in Ref 2,most Appropriate Analysis of Lighting Sys Availability ML17305B0021990-08-0909 August 1990 Provides Update on Status of Record 546 post-restart Item, Per 900412 Ltr.Record Will Revise Procedures for Analyzing & Disseminating Incident Investigation,Operations & Maint Experience to Appropriate Dept ML17305A9871990-08-0303 August 1990 Forwards Rev 1 to Abb Impell Rept 01-1658-1815, Emergency Lighting Independent Review, Per Insp Repts 50-528/90-25, 50-529/90-25 & 50-530/90-25 ML17305A9791990-07-31031 July 1990 Forwards, Conceptual Design for Palo Verde Nuclear Generating Station for Diverse Auxiliary Feedwater Actuation Sys (Dafas) for Review.Schedule of Implementation as Indicated ML20056A4161990-07-31031 July 1990 Forwards Revised Security Plan Implementing Procedures.Encl Withheld (Ref 10CFR2.790) ML17305A9831990-07-27027 July 1990 Requests Temporary Waiver of Compliance from Limiting Condition for Operation 3.6.3 to Allow Corrective Maint to Be Performed on Main Feedwater Isolation Valves by Extending Allowed Outage Time to 12 H Instead of 4 H ML20055J2671990-07-25025 July 1990 Forwards Info Constituting Decommissioning Financial Assurance Certification Rept,Per 10CFR50.33(k)(2) & 50.75(b) ML17305A9771990-07-25025 July 1990 Forwards Status of Corrective Actions to Min Multiple Control Element Assembly Drop Events at Plant.Insp of Insulation Coils & Replacement of Defective Coils for Units 1 & 2 Completed ML20055J1031990-07-25025 July 1990 Forwards Certification of Decommissioning Financial Assurances ML20055J1711990-07-25025 July 1990 Forwards Certification of Decommissioning Financial Assurances for Plant,Per 10CFR50.75(b) & 50.33(k)(2) ML17305A9411990-07-20020 July 1990 Forwards Response to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. ML17305A9431990-07-17017 July 1990 Forwards Rev 1 to Palo Verde Nuclear Generating Station Annual Radiological Environ Operating Rept for 1987. Rev Results from Internal Review Bu Nuclear Safety Group & Audit Performed by Radiation Protection Stds ML17305A9601990-07-13013 July 1990 Forwards Preliminary Response Re Justification for Continued Operation of Fire Protection Sys Equipment,Per Insp Repts 50-528/90-25,50-529/90-25 & 50-530/90-25 ML17305A9331990-07-12012 July 1990 Discusses Util Compliance w/fitness-for-duty Program Implementation.Lab Specialists,Inc Audited & Monitored W/ Satisfactory Results.Ltr of Agreement Has Been in Place Since 900202 ML17305A9391990-07-0909 July 1990 Forwards Endorsement 44 to Maelu Policy MF-116 & Endorsement 62 to Nelia Policy NF-266 ML17305A9341990-07-0909 July 1990 Submits Results of 900514-18 NUREG-1220 Audit,Per NRC 900608 Request,Per Insp of Plant.Remaining Licensed Operators Found to Be in Conformance W/Medical Exam Requirements of 10CFR50.55 ML17305A9151990-06-29029 June 1990 Forwards Emergency Lighting Failure Data Update,Per 900621 Request ML17305A9061990-06-26026 June 1990 Suppls 891114 Response to Violations Noted in Insp Rept 50-528/89-16.Application for Amend to License NPF-41 Will Be Submitted in Oct 1990 to Permit Lower Flow Rate for RCS & Shutdown Cooling Sys ML17305A9111990-06-25025 June 1990 Responds to Generic Ltr 90-04, Status of Implementation of Generic Safety Issues. ML17305A9081990-06-25025 June 1990 Forwards Schedule Reiterating Util Plans for Implementation of USIs A-9 & A-44 & Provides Current Forecast Refuel Dates ML17305A9051990-06-25025 June 1990 Forwards Endorsement 45 to Maelu Policy MF-116 & Endorsement 63 to Nelia Policy NF-266 ML17305A9121990-06-24024 June 1990 Forwards Discharge Test Voltage Curve,Per 900623 Request for Completion of Emergency Lighting Exide Power Supply Prior to Entry Into Mode 2 ML17305A9171990-06-24024 June 1990 Confirms Compliance W/Agreed Upon Course of Action for Restart of Facility as Outlined in 891224 Ltr & Completion of Items Contained in Restart List Provided as Attachment to 900111 Ltr ML17305A8961990-06-20020 June 1990 Responds to NRC 900521 Ltr Re Violations Noted in Insp Repts 50-528/90-12,50-529/90-12 & 50-530/90-12.Corrective Action: Wiring in PPS Cabinets & Cabinet Drawers Reworked in Accordance W/Approved Work Authorization Documents IR 05000528/19900021990-06-19019 June 1990 Describes Current Status & Provides Description of Actions Taken to Ensure Continued High Reliability of Emergency Lighting Sys,Per Insp Repts 50-528/90-02,50-529/90-02 & 50-530/90-02.Emergency Lights Mfg by Emergi-Lite ML17305A9041990-06-19019 June 1990 Describes Current Status & Provides Description of Actions Taken to Ensure Continued High Reliability of Emergency Lighting Sys,Per Insp Repts 50-528/90-02,50-529/90-02 & 50-530/90-02.Emergency Lights Mfg by Emergi-Lite ML17305A8891990-06-15015 June 1990 Informs NRC That post-restart Items Due Prior to Scheduled Restart Have Been Completed on Schedule W/Listed Exceptions ML17305A8871990-06-14014 June 1990 Advises That Fuel Pool Cooling & Cleanup Procedures Being Restructured,Per Response to Violations in Insp Repts 50-528/89-36 & 50-530/89-36 ML17305A8731990-06-0808 June 1990 Responds to Bulletin 88-005 Re Product Forms Other than Fittings & Flanges for Plant.Significant Number of Lugs Delivered to Plant.Util Should Be Notified,If NRC Previous Review of Records Has Identified Other Product Forms ML17305A9421990-06-0101 June 1990 Forwards Pinnacle West Response to State of Az Corp Commission Complaint Filed W/Us Securities & Exchange Commission on 900521,to Revoke Exemption from Public Utils Holding Co Act ML17305A8391990-05-31031 May 1990 Forwards 1990 Reactor Containment Bldg Integrated Leak Rate Test,Final Rept. ML17305A8571990-05-31031 May 1990 Forwards Amended Pages of Feb,Mar & Apr 1990 Monthly Operating Repts for Palo Verde Nuclear Generating Station Unit 2 ML17305A8661990-05-31031 May 1990 Forwards Projected 1990 Cash Flow Statements ML17305A8201990-05-23023 May 1990 Provides Status of Improvements to Eliminate Possibility of Multiple Control Element Assembly Drop Events.Licensee Developed Mod to Ground Fault Detection Sys to Assure Continuous Monitoring & Annunciation of Any Future Faults ML20043B6421990-05-19019 May 1990 Forwards Amend 26 to Security Plan.Amend Withheld (Ref 10CFR2.790(d) & 10CFR73.21) ML17305A7841990-05-15015 May 1990 Forwards Special Rept 2-SR-90-002 Re Steam Generator Tube Plugging Due to Inservice Insp Activities.Twenty Tubes Plugged in Steam Generator 1 & ninety-one Tubes Plugged in Steam Generator 2 ML17305A8721990-05-14014 May 1990 Forwards Arizona Corp Commission Complaint Filed W/Us Securities & Exchange Commission Seeking Revocation or Mod of Exemption of Pinnacle West Capital Corp.Complaint Wholly W/O Merit ML17305A7621990-05-11011 May 1990 Responds to NRC 900413 Ltr Re Violations Noted in Insp Repts 50-528/90-03,50-529/90-03 & 50-530/90-03.Corrective Actions: Night Order Written for Guidance on Use of Instrumentation W/Maint Tag Present ML17305A7921990-05-0808 May 1990 Forwards Public Version of Rev 2 to EPIP-14, Dose Assessment. W/900523 Release Memo ML20043A0511990-05-0303 May 1990 Forwards Public Version of Revised Epips,Including Procedure Change Notice 11 to Rev 12 to EPIP-04 & Procedure Change Notice 1 to Rev 6 to EPIP-15 ML17305A7421990-05-0303 May 1990 Responds to 900330 Enforcement Conference Re Violations Noted in Insp Repts 50-528/90-04,50-529/90-13 & 50-530/90-13.Corrective Action:Special Locking Mechanisms Installed on Currently Posted Radiation Area Doors & Gates ML17305A8861990-04-30030 April 1990 Forwards EPIP Update,Including Rev 7 to EPIP 02,Rev 12 to EPIP 03 & Rev 9 to EPIP 20.W/o Encl ML17305A7381990-04-30030 April 1990 Forwards Annual Environ Operating Rept for 1989 & Annual Rept for Salt Deposition Monitoring Program 1989. ML17305A7131990-04-20020 April 1990 Responds to NRC 900321 Ltr Re Violations Noted in Insp Rept 50-530/90-08.Corrective Action:Plant Guideline Providing Addl Guidance Re Prioritization of Work Promulgated ML17305A6891990-04-16016 April 1990 Forwards Rev to Cycle 3 Reload Analysis Rept,Submitted 891024.Rev Reflects Early end-of-cycle Unit Shutdown & Replacement of Eight New Fuel Assemblies ML17305A7011990-04-12012 April 1990 Forwards Rev 3 to Palo Verde Nuclear Generating Station Post-Restart Actions, Per JB Martin 891224 Ltr ML17305A7081990-04-0909 April 1990 Forwards post-exam Security Agreements for Dk Hendrick, D Ensign,M Alavi & Author.Agreement Certifies That Signatories Will Not Divulge Info Re 900320 Exams 1990-09-17
[Table view] |
Text
REGULA Y INFORMATION DISTRIBUTIO YSTEM (RIDS)
ACCESSION NBR: 8710230318 DOC. DATE: 87/10/15 NOTARIZED: NO DOCKET 0 FACIL: STN-50-528 Palo Verde Nuclear Stationi Unit ii Arizona Pub STN-50-529 Palo Verde Nuclear Stations Unit 2i Arizona Publi li 05000528 05000529 STN-50-530 Palo Verde Nuc lear Stat ioni Unit 3i Ari zona Pub AUTHOR AFFILIATION li 05000530 AUTH. NAME VAN HRUNTi E. E. Arizona Nuclear Power ProJect (formerly Arizona Public Serv RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Foreards info on util radiation protection organizations per Reg Guide 8. 8> for NRC approval. Reg guide has no regulation requiring specific responsibilities of radiation protection manageri per NRC concern.
DISTRIBUTION CODE: A001D COPIEB RECEIVED: LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution NOTES: Standardized plant. 05000528 Standard i z ed p lant. 0500052m Standardized plant. 05000530 RECIPIENT COPIES REC IP IENT COP I EB ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 0 PD5 PD 5 5 LICITR*iE 1 DAVIS> M 1 INTERNAL: ACRS 6 6 ARM/DAF/LFMH 0 NRR/DEBT/ADB 1 1 NRR/DEBT/CEB 1 NRR/DEBT/MTB 1 1 NRR/DEBT/RBH 1 1 NRR/DOEA/TSH 1 AS/ILRB 1 OGC/HDSi 1 0 01 1 1 REB/DE/EIB. 1 EXTERNAL: EQ8cG HRUBKEs B 1 1 LPDR NRC PDR 1 NSIC NOTES:
TOTAL NUMBER OF COP IEB REQUIRED: LTTR 29 ENCL 26
,t Arizona Nuclear Power Project P.o. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 October 15, 1987 161-00585-EEVB/WFQ a
C' Docket Nos. 50>>528, 50-529, 50-530 n1 U. S. Nuclear Regulatory Commission C3 Washington D.C. 20555 Attn: Document Control Desk
References:
(1) E. E. Van Brunt, Jr., letter (161-00524) to DCD (NRC), 9/22/87 (2) E. E. Van Brunt, Jr., letter (161-00432) to DCD (NRC),- 8/10/87
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Response to NRC Regarding Palo Verde Organization Change Pile: 87-005.419.05; 87-056-026 A meeting between NRC and ANPP representatives was held on September 9, 1987, to discuss aspects of the proposed PVNGS organization change. A copy of the information presented and additional information to complete NRC's review was provided by letter on September 22, 1987 (Reference 1). At the conclusion of that meeting, ANPP representatives were informed that one aspect, the Radiation Protection organization, was acceptable as is. However, on October 8, 1987, almost one month later, ANPP was informed that the Radiation Protection organization was now not acceptable. Our understanding of the NRC concern is that NRC requires the Radiation Protection Manager (RPM per Regulatory Guide 8.8) to have authority over the Radiation Protection (RP) personnel in the Units and to supervise their daily activities. After reviewing the requirements again, we have concluded that there is no regulation requiring that the RPM shall have specific responsibilities. The Regulatory Guide 8.8 provides guidance and suggests responsibilities the RPM should have.
'1 0/303 S7go/5 1 S O~OO052S 0
S7 I5IDOCK
>DR PQRL, H
I CZ7 C
y C -~
f f
C g, p h
J v
1, U. S. Nuclear Regulatory Commission October 15, 1987 Page 2 161-00585-EEVB/WFQ ANPP believes the proposed Radiation Protection Organization meets the intent of Regulatory Guide, 8.8 overall and exceeds the intent in several areas. The attached documents how the radiation protection organization is integrated into overall plant operations. We believe that this organization is acceptable and request expeditious NRC approval.
Very truly y s, P P gLV RVA E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/WFQ/jcdf Attachment cc: 0. M. DeMichele J. B. Martin E. A. Licitra J. G. Haynes A. C. Gehr Resident Inspector - J. R. Ball
4
~'
i
Analysis of the Proposed ANPP Organization as Related to Radiological Protection Back round Palo Verde Nuclear Generating Station (PVNGS) is the largest central station in the United States in terms of production of nuclear power generated electricity. Furthermore, the operation of three duplicate generating units combined with the added factors of a desert site location (providing no capability of wastewater discharges offsite) and the use of recycled sewage effluent as a condenser cooling water source combine to increase the site complexity requiring a unique management organizational approach.
Responsibility for operation of PVNGS is assigned to the Vice President Nuclear Production with an organization as depicted in Figure 1.
This organization provides a Unit Radiation Protection Manager reporting to each Unit Plant Manager which is consistent with guidance provided in NUREG 0855.- The, Unit Radiation Protection Managers are responsible for program implementation on a day to day'asis including interaction with other unit
'iscipline's and 'scheduling work activities. Each Plant Manager is responsible for routine power operation of his designated unit and has sufficient staff to support necessary activities. Providing central support functions to each Plant Manager is the Assistant Vice President Nuclear Production Support.
This additional support is provided for both special outage requirements and functions which may be p provided to each unit from a central service organization. A Central Radiation Protection Manager reports to the Assistant Vice President Nuclear Production Support and is responsible for providing outage radiation protection support as well as respiratory protection, dosimetry, survey instrument calibration and maintenance, and bioassay services to each unit.
The Standards and Technical Support Director reporting to the Vice President Nuclear Production provides for independent review and monitoring of methods and program implementation by the Units and the Central Organization to provide for uniformity between unitsp compliance with regulatory guidance and requirements and overall improvements in programs, procedures and performance. The Radiation Protection and Chemistry Manager reporting to the Standards and Technical Support Director is designated as the onsite Radiation Protection Manager (RPM) as defined by Regulatory Guides 1.8 and 8.8.
Discussion In the August 10, 1987 change request to the PVNGS Units 1, 2, & 3 Technical Specifications, exception was taken to Regulatory Guide 8.8 positions C.l.b.3. (g), (h), (i), and (j) for the Radiation Protection and Chemistry Manager (RPM) due to the unique aspects of the organization as described above. It is the purpose of this discussion to describe our approach to comply with the guidance of these positions as well as to elaborate on the proposed ANPP radiation protection organizational interrelationships.
~ P
, ~y cg E
1 I
0 0
The major provision presented in Regulatory Guide 8.8 is the independence of the RPM from station divisions such as operations, maintenance, or technical support. The proposed PVNGS organization places responsibility for the radiation protection program content and implementation performance assessment with the Radiation Protection and Chemistry Manager (RPM) who is part of an organization located onsite and is independent of unit operations but responsible to the Vice President Nuclear Production for overall plant standardization, program management, unit information feedback, root cause analysis, and performance auditing and monitoring. Program implementation is assigned to the Unit Radiation Protection Manager reporting to the Unit Plant Manager and on the same reporting level as the other Unit discipline managers including the Unit Work Control Manager. This work control organization ensures that work in the Units is well coordinated with the radiation protection requirements. The Radiation Protection and Chemistry Manager (RPM) continuously monitors the program implemented by the Unit and Central Radiation Protection Managers and the RPM provides direct feedback to correct implementation problems. This organizational relationship has the effect of freeing the Radiation Protection and Chemistry Manager (RPM) from the routine administrative duties of program implementation to greatly enhance and focus his ability to concentrate on program improvements and performance monitoring. This relationship furthermore frees the Unit and Central Radiation Protection Managers to greatly enhance and focus their ability to involve themselves in program implementation and interaction with the other Unit discipline departments and work control. The Unit Radiation Protection Managers have the authority to immediately stop work relating to personnel radiation exposure. This relationship also offers the Unit Radiation Protection Managers the unique ability 'to raise concerns directly to the Plant
'anager,. or if not satisfied ,to raise"'oncer'ns directly to the Radiation
'Protection and Chemistry Manager (RPM). In addition, the RPM can immediately raise concerns to the Unit Managers or the Director of Standards and Technical
, Support... One of the prime philosophies'ehind the reorganization has been to reduce ,the levels of management so problems can be aired quickly. This accomplishment should be taken into account as part of this review.
i Specific provisions presented in 'Regulatory Guide 8.8 for which the RPiil is responsible and how this responsibility is, complied within the proposed ANPP organization are presented as follows:
C.1.b.3. (a) Participating in design reviews for facilities and equipment that can affect potential radiation exposures; Routine design reviews for plant modifications will be performed under the proposed new organization by ALARA engineers reporting to the ALARA Supervisor within the Central Radiation Protection Department. These reviews will be conducted in accordance with programs and procedures developed and maintained by the Radiation Protection and Chemistry Manager (RPM) who will also conduct performance monitoring (audits) of these programs and procedures. The Radiation Protection and Chemistry Manager (RPM) also has a support staff of radiological engineers and health physicists who are qualified to assist the ALARA engineers with design reviews.
A a
N t
C 4 1 8 p
~ e 0
C.l.b.3. (b) Identifying locations, operations, and conditions that have the potential for causing significant exposures to radiation; The Radiation Protection and Chemistry Manager (RPM) receives direct feedback of plant operating conditions and radiation protection program implementation through his performance monitoring program.
He also compiles and trends data from each unit to provide routine operating reports and identify potential problem areas. The ALARA Section under the Central Radiation Protection Manager also conducts ALARA reviews of unit operations and procedures in accordance with the ALARA programs and procedures established and monitored by the Radiation Protection and Chemistry Manager (RPM).
C.l.b.3. (c) Initiating and implementing an exposure control program; The exposure control program is part of the overall radiation protection program and procedures developed and maintained by the Radiation Protection and Chemistry Manager (RPM) and implemented by the Unit and Central Radiation Protection Managers. The Radiation Protection and Chemistry Manager (RPM) monitors implementation in each unit, evaluates and trends results to determine program effectiveness, and revises the program to incorporate improvements.
C.l.b.3. (d) Developing plans, procedures, and methods for keeping radiation exposures of station personnel ALARA; The Radiation Protection and Chemistry Manager (RPM) is directly responsible for developing and maintaining plans, procedures, and methods for keeping radiation exposures of station personnel ALARA. He also conducts routine performance monitoring of the implementation of these plans and procedures in the units to receive direct feedback for improvements. He conducts root cause analysis of any problems in this area and conducts post operation briefings for outages or unusual operations.
C.l.b.3. (e) Reviewing, commenting on, and recommending changes 'in job procedures to maintain exposures ALAM; The Radiation Protection and Chemistry Manager (RPM) serves as a member of the Plant Review Board with responsibilities as defined in Section 1.4.1 of the August 10, 1987 Technical Specification Change Request (pg 1-21). In summary, these responsibilities include reviewing plant Protection Manager also conducts ~
activities and administrative controls as related to nuclear (including radiological) safety. The ALARA Section under the Central Radiation job specific ALARA reviews and evaluations.
reviews of procedures and conducts He is directly responsible for review of Radiation Protection Procedures even as a PRB member.
U L - I D I Cl
't
C.l.b.3. (f) Participating in the development and approval of training programs related to work in radiation areas or involving radioactive materials)
The Radiation Protection and Chemistry Manager (RPM) establishes technical requirements related to work in radiation areas or involving radioactive materials through his staff of health physicists and radiological engineers and through feedback from his performance monitoring programs. The Unit and Central Radiation Protection Managers also provide training recommendations as a result of feedback from their program implementation through specific radiological work job coverage.
The AIBA Supervisor conducts ALARA reviews of train'ing programs and provides feedback from pre and post job ALARA briefings.
C.l.b.3. (g) Supervising the radiation surveillance program to maintain data on exposures of and doses to station personnel, by specific job functions and type of work; Collection of data relating to radiation exposure is performed by each Unit Radiation Protection Manager and the Central Radiation Protection Manager. The data is centrally collected by a computerized radiological records management system. Final data analysis, trending, and report preparation is performed by the Radiation Protection and Chemistry Manager (RPM).
C.l.b.3. (h) Supervising the collection, and evaluation of data and information attained from radiological surveys and monitoring activities:
The position is addressed in the same manner as that, described for position C.l.b.3. (g) above.
C.l.b.3 (i) Supervising, training, and qualifying the radiation protection staff of the station; The Radiation Protection and Chemistry Manager (RPM) prescribes training requirements for the Unit and Central Radiation Protection staffs and monitors training program development and administration by the Training Department., The Unit,and Central Radiation Protection Managers implement the training programs by ensuring, participation by their staffs.
1 C.l.b.3. (3) Ensuring that adequate radiation protection coverage is porovided for station personnel during all working hours.
Although radiation protection coverage is provided by the Unit and Central staffs, the Radiation Protection and Chemistry Manager (RPM) provides an independent review function'of radiation protection resources and utilization on a continuing basis. Needs for additional resource allocation can then be made known to appropriate station management personnel.
4
(,
F i.
J(
1 C
V K L
Conclusion In summary, it is concluded that the proposed organization meets the intent of Regulatory Guides 8.8 guidance in the above paragraphs as required for the operation of the three duplicate PVNGS units combined with the added factors described above. Additionally, the span of control and procedural definition of authority provided in the Station Manual is consistent with the guidance provided in NUREG 0588.
0 ~
j
VICE PRESIDENT NUCLEAR
~ ~
I PRODUCTION ASSISTANT DIAECTOA PLAN I'ANAGER PLANT MANAGER PLANT MANAGER UNIT I UNIT 2 UNIT3 VICE PAESIDENT s TANDAAos a NUCLEAA PAOO. TECI I. SUPPOAT SUPPOAT OPERATIONS WnTEA AEC. PLANT STAN.
OPERATIONS OPERATIONS MANAGER FACILITY OAAOS & CONT.
MANAGER MANAGER MANAGER MANAGEA OUTAGE Et<GINCEAltIG MAINTENANCE MAINTENANCE MAINTENANCE MANAGEMENT F vnLUATIOtIS MANAGER 'ANAGER MANAGER MANAGER I.IAHAGEA WORK WORK WORK CEN'BAAL OPEAATIOtIS CONTROL CONTROL CONTROL MAINTENANCE COt.lPUTEA SYS MANAGER MANAGER MANAGER MANAGER MANAGEA RADIATION RADIATION nnoIATION RADIATION RADWASTE PROTECTION PROTECTION PAO1ECTION &
PROTECTION SUPPORT MANAGER Cl IEMlSTAY MANAGER MANAGER MANAGER MANAGEA CENTRAL CI IEMISTAY Cl IEMISTRY Cl IEMISTAY RADIATION COMPLtANCE MANAGER MANAGER MANAGER PROTECTION MANAGER APS NUCLEAR PRODUCTION Figure l