ML17300B064
| ML17300B064 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/01/1987 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 058-02313-EEVB, 58-2313-EEVB, NUDOCS 8710190322 | |
| Download: ML17300B064 (2) | |
Text
I REGULATE INFORMATION DISTRIBUTIO STEM (RIDS)
ACCESSION NBR: 8710190322 DOC. DATE: S7/10/01 NOTARIZED:
NO DOCKET FAG IL:STN-50-530 Palo Verde Nuc lear Stati onI Unit 31 Arizona Pub li 050'00530 AUTH. NAME AUTHOR AFFILIATION VAN BRUNTI E. E.
Arizona Nuclear Power ProJect (formerly Arizona Public Serv RECIP. NAME RECIPIENT AFFILIATION MARTINIJ. 'B.
.Region 51 Office of Director
SUBJECT:
Certifies that all sys required for initial entry into Mode 4 demonstrated by successfully meeting -.accep'tance criteria in Tech Specsi per Item
- 1. b of'ttachment 1 to License NPF-65.
DISTRIBUTION CODE:
IEOI'D COPIES RECEIVED: LTR f'NCL Q SIZE:
TITLE: General (50 Dkt)-Insp Rept/Noticef Violation Response NOTES: Standardized plant.
,'5000530 RECIPIENT ID CODE/NAME PD5 PD DAVISI M COP IES LTTR ENCL REC IP IENT ID CODE/NAME LICITRA>E
.COPIES LTTR ENCL INTERNAL: ACRS DEDRO NRR/DOEA DIR NRR/DREP /RP 8 NRR/PMAS/ ILRB OGC/HDSi RES DEP Y G I EXTERNAL:
LPDR NSIC 2
1
.1 2
1 1'
AEOD NRR MORISSEAUI D NRR/DREP/EPB NRR/DRIS DIR
~~ EBERM*N1.J REG FIL GN5 t=I 01 NRC,PDR
.NOTES:
6 TOTAL NUMBER'F COPIES REQUIRED:
L'TTR 25 ENCL
Arizona Nuclear Power Project P.O. BOX 52(I34
~
RHOBNIXARIZONA85~072-2034 REcElvED NRC' WWP ll981 OCT -S A l0: 28 058-02313-EEVB/JRB October 1,
1987 Mr. John. B. Martin Office of Inspecti.on and Enforcement U.
S. Nuclear Regulatory CommicIsion, Region V
1450 Maria Lane - Su,ite 210 Walnut Creek, Cali.fornia 94596
Dear Mr. Martin:
Ref:
PVNGS Unit 3 Operating License - NPP-65 File:
87-O56-026
Subject:
Certification of the Operability of All
. Required Systems for Initi'.al Entry Into Mode. 4 Palo Verde Unit 3 ri
~l CD I
CD As required by Item
- 1. b of Attachment 1
to the Palo Verde Nucle,ar Generating Unit 3
Operating
- License, NPF-65; I
am hereby certifying that Item l.a of Attachment 1
to the License:
has been completed forl the initial entry into Mode.4.
The operability of all systems required for',the initial entry into Mode 4
has been demonstrated by successfully
.meeting the acceptance
- criteria, in the PVNGS -Technical. Specifications.
This-has been 'accomplished by the.completion of the applicable surveillance:
tests or by preoperational'esting which verifies meeting the requirements of the Techniaal Specifications which were performed within tihei required surveillance interval or by operability as demonstrated fort Modes 5 and 6.
Very truly yours, EZ //~~ FJORD
~9 /
(
E. E. Van Brunt, Jr.
Executive Vice Pr'esident Project Director EEVB/JRB/bsc cc'.
Gaston Fiorelli Art Gehr
~~~ 871C pcQp IPi 87<<~~@oem o~p >i