ML17300B063
| ML17300B063 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/04/1987 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 058-02315-EEVB, 58-2315-EEVB, NUDOCS 8710190277 | |
| Download: ML17300B063 (2) | |
Text
REGULAT-..Y INFORM*TION DISTR IBUTIO YSTEM (RIDS>
ACCESSION NBR: 87iOi90277 DOC. DATE: 87/10/04 NOTARIZED:
NO DOCKET ¹ FACIL:STN-50-530 Palo Verde Nuclear Stationi Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR *FFILI*TION VAN BRUNTI E. E.
Arizona Nuclear Poujer ProJect (formerly *rizona Public Serv RECIP. NAME RECIPIENT AFFILIATION MARTINIJ.'.
Region 5I Office of Director
SUBJECT:
Certifies that operability of al'1 required sos-for initial entry into Mode 3 has been demonstrated bg successfully meeting acceptance criteria in unit Tech Specs.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED: LTR i
ENCL Q SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response C
NOTES: Stand ar d i z ed p lan t.
05000530 RECIPIENT ID CODE/NAME PD5 PD DAVISI M INTERNAL:
ACRS DEDRO NRR/DOEA DIR NRR/DREP/RPB NRR/PMAS/ ILRB OGC/HDSi RES DEPY GI EXTERNAL:
LPDR.
NSIC COPIES LTTR ENCL 2fl 2
ii RECIPIENT ID CODE/NAME LIC ITRAI'E AEOD NRR MQRISSEAUI D NRR/DREP/EPB NRR/DR IS DIR OE LIEBERMANIJ FIL RGN NRC PDR COPIES LTTR ENCL NOTES:
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 25 ENCL
Arizona Rluclear Power Project:
NRC P,'O. BOX 52034
~
PHOENIX, ABI2ONA85072-2034 KGlOH, /
U 3l
@~i>OCT-b P 2:'i9 0158-02315-EEVB/ JMA October 4, 1987 Mr. 'John B. Martin Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission, Region V
1450 Maria Lane - Suite 210 Walnut Creek, California 94596
Dear Mr. Martin:
Subject:
Certification of the Operability of All Required Systems for Initial Entry Into Mode 3 Palo Verde Unit'. 3 aS CA i~io z
cn Ref..:
PVNGS Unit 3 Operating License - NPI.'-65 File:
87-056-026 As required by Item l.b of Attachment 1 to'he Palo Verde Nuclear Generating.
Unit 3
Operating L:Lcense, NPF-65, I
am hereby certi.fying that Item l.a of Attachment 1
to the LicEnse has been completed for'he initial entry into Mode 3.
The operability of all systems required fbr the Iini'tial entry into Mode 3
has been demonstrated by succes. fully meeting the.
acceptance critei.ia in the PVNGS Technical Specifications.
~This hah been accompli. shed
~be
~
the completion of the applicable surveillance tests or by preoperatiohal~
~esting which yerifies meet'izIIg the requirements of the Technica'1
.Specifications which were performed
.within the required surveillance interval or by operability as demonstrated for Modes 4,5 and 6.
Very truly your's, EELY~~R~~')g E.
E,.
Van Brunt, Jr.
Executive Vice President Project Director EEVB/JMA/bsc cc:
Gaston Fiorelli Art Gehr 8710290277 871<(+%~.30 PDR ADDCN 0 Pr))R
.P