ML17300B060
| ML17300B060 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/31/1987 |
| From: | Haynes J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 161-00469-JGH-J, 161-469-JGH-J, NUDOCS 8709150385 | |
| Download: ML17300B060 (2) | |
Text
REGULAT INFORMATION D ISTR IBUTIO YSTEM (R IDS )
ACCESSION NBR: 8709i50385 DOC. DATE: 87/08/3i NOTARIZED:
NO DOCKET 0 FACIL:STN-50-529 Palo Verde Nuclear Stations Unit 2> Arizona Pub li 05000529 AUTH. NAME 'UTHOR AFFILIATION HAYNESi J. G.
Arizona Nuclear Power Prospect (formerly Arizona Public Serv REC IP. NAME RECIPIENT AFFILIATION MARTINIJ. B.
Region 5i Office of Director
SUBJECT:
Advises that util has opted to utilize Tech Spec Surveillance Requirement
- 4. 7. 9. e Sample Plan 2 for functional testing of snubbers during Feb i988 refueling outage.
DISTRIBUTION CDDE:
ZECZD CDPZES RECEIVED: LTR ENCL 0 SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: Standardized plant.
05000529 REC IP IENT ID CODE/NAME PD5 PD DAVISI M COPIES LTTR ENCL RECIPIENT ID CODE/NAME LICITRAiE COPIES LTTR ENCL INTERNAL: ACRS DEDRO NRR/DOEA DIR NRR/DREP/RPB NRR/PMAS/ILRB OQC/HDSi RES DEPY GI 2ii 2
ii AEOD NRR MQRISSEAUi D NRR/DREP/EPB NRR/DRIS DIR OE LIEBERMANiJ Oi i
i ii i
EXTERNAL:
LPDR
. NSIC NOTES:
NRC PDR TOTAL NUMBER OF CQP IES REQUIRED:
LTTR 25 ENCL
RECElYEO HRC nor.
Arizona Nuclear Power Project P.O.BOX52034
~
PHOENIX.ARIZONA85072-gg Sip -3 A Rugust 31, 1987 161-00469-JGH/JRP Mr. John B. Martin, Regional Administrator Office of Inspection and Enforcement U.S Nuclear Regulatory Commission Region V
1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 0
Dear Mr.. Martin:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No.
STN 50-529 (License NPF-51)
Functional Testing of Snubbers File:
87-F.-005-419.05;.
87-056-026 PVNGS Unit 2
has opted'o utilize sample plan, 2, of. Technical Specification Surveillance Requirement 4.7.9.e for functional testing of snubbers during the Unit 2 Refueling Outage scheduled to begin mid February, 1988.
This notification is being made pursuant to Technical Specification 4.7.9, which requires that the NRC Regional Administrator b'e notified in writing of the sample-plan'elected prior to the test period.
The test period is currently scheduled to begin the end of February, 1988.
Should you have any questions, please call.
Very truly yours, J.
G.
Ha es Vice President Nuclear Production JGH/JRP/mes cc:
0.. M. De Michele E. E. Van Brunt, Jr.
G.
W. Knighton E. A. Licitra R. P.
Zimmerman oW~
87o+
OCH 0 pDR 0085 87 0052~
@DR AD P