ML17300A971
| ML17300A971 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/06/1987 |
| From: | Rossi C Office of Nuclear Reactor Regulation |
| To: | WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| Shared Package | |
| ML17300A973 | List: |
| References | |
| NUDOCS 8708120036 | |
| Download: ML17300A971 (2) | |
Text
I sS,
~ P Nt' 587 Westinghouse 4454 Genesee Street
- Buffalo, NY 14255
Dear Sirs:
SUBJECT:
LETDOWN HEAT EXCHANGER NOZZLE CRACK AT PALO VERDE 3 The Nuclear Regulatory Commission (NRC) received the two reports attached to this letter in February and June of 1987.
They describe a through-wall crack in the letdown heat exchanger nozzle at Palo Verde 3 incurred in hot functional testing.
The builder of the heat exchangers, RECO Industries, Inc.,
who is now out of the business, informs us in the June report that your plant received one of their. heat exchanger products.
Me believe the Palo Verde 3
event is site-specific but because the event does have potential safety signif-
- icance, we are forwarding these reports to you.for your information.
Sincerely, Charles E. Rossi, Director Division of Operational Events Assessment Office of Nuclear Reactor Regulation
Enclosures:
1.
Report from RECO'ndustries 6/16/87 2.
Report from Arizona Nuclear Power Project 2/27/87 CONTACT:
C. Vernon Hodge, NRR 492-8196 DISTRIBUTION
~i. II R
- CERossi, NRR.
CHBerlinger,.
- CVHodge, NRR
. EJButcher, NRR WDLanning, NRR NKing-Wertman (87-55)
MKing '(87-47)
~DCS DOEA R/F OGCB R/F VHodge R/F z ~<e~
OGCB:DOEA:NRR C/OBCB:DOEA':NRR 8)3/~+
D/DOEA:NRR CVHodge CHBerlinger CERossi 07/f/87 07/)3 /87 VP 7 /87 Woe>ZO0SS a>Oa06 PDR ADOCK 05000530 8
PDR j
c ta
~
I h
HV 'tvv. H>
~ IV*
I 5 H.
H I Hht. t 1
- l ~ 3 <Hh.
"v.
tv I
II H I vv 4
a
~ vc>
l". b
~ ~
ff.
PI Il H
k,'
$ q.'>>
gc'
)h V
V i>
~II v I i I ('H
,vg>I.. I, g
I (>>,
V
~H v>I> f, <g, (p
it,.
~
Vl
', f HHH f
> I,,
HVy If f
~
>'tf
>1'>
1vt
> I
-'I I
c P
I
>,I I
Xv
- ca'.
t,,> 7 tv( ~
~ It H li F
Il V
v 'I HA 1.4,h htt I
~" c.
1
'>V. h
,'C l>fH H
i ~