ML17300A753
| ML17300A753 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/26/1987 |
| From: | Haynes J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 1-SR-87-011, 1-SR-87-11, 192-00167-JGH-T, 192-167-JGH-T, NUDOCS 8704210027 | |
| Download: ML17300A753 (6) | |
Text
REGULATOR
'NFQRMATIOI'J DISTRIBUTION TEM (R IDS)
'CCESSION NDR: 8704210027 DOC. DATE.: 97/03/26 NOTARI ZED:
NO DOCKET 0 FAC IL:BTN-50-528 Palo Verde Nuclear Station>
Unit 1> Arizona Pub Ii 05000528 AUTH. NAME AUTHOR AFFILIATION HAYNES> J. G.
Arizona Nuclear Pouer Prospect
( forms r ly Arizona Public Serv REC IP. NAI'IE RECIPIENT AFF ILIATIO<V MARTIN>J. B.
Region 5>
Office of Director SUI3 JECT:
Spec ia1 Rep t 1-BR-87-011: on 870228> 72 h l imit for
. inoperability oF high range noble gas activity monitor RU-144 +as exceeded.
Caused by removal of RU-144 for testing for associated RU-143 monitor. Iionitor returned to svc.
DISTRIHUTION CODE:
IE01D COPIEB RECEIVED'. LTR + ENCL ~
BI ZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: Standardized plant. M. Davis> NHR: 1Cy.
05000528 RECIPIENT ID CODE/NAI'IE pD5 LA I ICITRA E COPIES LTTR El'lCL 0
1 1
REC IP I ENT ID CODE/NAI'IE PD5 PD DAVIS> M COP IEB LTTR ENCL 1
1 1
INTERNAL: ACRB DEDRO NRR RQE>M. L NRR/DOEA DIR NRR/DREP/RPB I IRR/Pl IAS/ILRl<
RGN5 Fll E 01 EXTERNAL:
LPDR NBIC NOTES:
2 2
1 1
1 1
1 1
2 2
1 1
1 1
1 1
1 1
AEOD El'i<F LIEBERMAN NRR/ADT I'PRR/DREP/EP9 b!RR/DRIS DIR CG /HDS1 RES SPEIS> T NR C PDR 1
1 1
1 i.
1 1
1 1
1 1
1 TOTAL NUMBER OF COPIES REGUIRED; LTTR 25 ENCL 24
I
~ ~
f Arizona Nuclear Power Project~)gf i
I f, f P.o. BOX 52034
~
PHOENIX. ARIZONA85072-2034 192-00167-JGH/TRB/ESP March 26, 1987-.iEG'O"'>~ ~'"""
Mr. John B. Martin, Regional Administrator Office of Inspection and Enforcement U.S.
Nuclear Regulatory Commission Region V
1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368
Subject:
Palo Verde Nuclear Generating Station-Unit 1
Docket No.
STN 50-528 (License NPF-41)
Special Report 1-SR-87-011 File:
87-020-404
Dear Mr. Martin:
Attached please find a Special Report 1-SR-87-011 prepared and submitted pursuant to Technical Specifications 3.3.3.1 and 6.9.2.
This report discusses a radiation monitoring unit inoperable for greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
If you have any questions, please contact Tom Bradish, Compliance Supervisor at (602) 932-5300, Ext. 6936.
Very truly yours, J.
G. Haynes Vice President Nuclear Production JGH/TRB/ESP/cld Attachment cc:
0.
M. DeMichele E. E.
Van Brunt, Jr.
R.
P.
Zimmerman R.
C. Sorenson E.
A. Licitra A. C. Gehr INFO Records Center (all w/a)
S7O~21Oo~
<>OOS2S 870g2b PDP gDQC
~
'DP s
I
PALO VERDE NUCLEAR GENERATING STATION Radiation Monitoring Unit Inoperable for Greater Than 72 Hours License No.
NPF-41 Docket No.
STN 50-528 Special Report No.
1-SR-87-011 This Special Report is being submitted pursuant to Technical Specification (T.S.)
3.3.3.9 ACTION 42b and T.S. 6.9.2 to report an event in which a high range noble gas activity monitor (RU-144) was inoperable for greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit for operability was exceeded at approximately 0837 MST on February 28, 1987.
Pursuant to T.S. 3.3.3.9 ACTION 42a the Preplanned Alternate Sampling Program was initiated to monitor the plant ventilation system.
At approximately 0837 MST on February 25,
- 1987, Palo Verde Unit 1 was in Mode 5 (COLD SHUTDOWN) for a steam generator tube leak outage when RU-144 was taken out of service for testing of the associated Plant Vent Low Range Monitor RU-143.
No physical testing
- was, or required to be performed on RU-144.
During surveillance
- testing, prior to placing the monitor back in service, it was discovered that the check source installed on -one of three Particulate Iodine Samplers detector did not meet the acceptance criteria of the Functional Test.
The check source portion of the functional test being performed was not 'required per T.S. 4.3.3.9 for the Particulate Iodine samplers.
- However, the check source is activated and the before and after levels are compared for proper response of the detector to radioactive material.
This is performed for all monitors.
Troubleshooting conducted under an authorized work document revealed that the check source was not actuating.
As a corrective action, the check source was reworked by realigning the rod to complete a full actuation travel path to meet original requirements.
A root cause of failure request has been initiated and will address the potential of similar cases in other monitors encompassing all three units.
To return RU-144 to service, Quarterly Functional Test (36ST-9SQ04) was successfully performed.
The monitor was declared operable at 0855 on March 6, 1987.
The monitor was unavailable for 9 days and 18 minutes.