ML17300A705

From kanterella
Jump to navigation Jump to search
Forwards Comments on Facility Draft License,Per NRC 870306 Request.Suggested Changes to Section 2 Include Deletion of Paragraph C.(5) Since Inservice Insp Program Submitted W/
ML17300A705
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/19/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
161-00087-JGH-P, 161-87-JGH-P, NUDOCS 8703250334
Download: ML17300A705 (6)


Text

I REGULATOR>

FORNATION DISTRIBUTION S EN (R IDS) 4' ACCESSION NBR'703250334 DOC. DATE: 87/03/19 NOTARIZED:

NO DOCKET 0 FACIL:STN-50-530 Palo Verde Nuclear Station>

Unit 3. Arizona Pub li 05000530 AUTH. NANE AUTHOR AFFILIATION HAYNES> J. Q.

Arizona Nuclear Power ProJect (formerly Arizona Public Serv RECIP. NANE RECIPIENT AFFILIATION Document Control Branch (Document'ontrol Desk)

SUBJECT:

Forwards comments on facility draft license per NRC 870306 request.

No changes suggested for Section

1. Suggested changes for Section 2 includei deleting paragraph C. 5'ntire lg because util already submitted inservice insp program.

DISTRIBUTION CODE:

BOOID COPIES RFCEIVED: LTR t

ENCL g SIZE:

TITLE: Licensing Submittal:

PSAR/FSAR Amdts Cc Related Correspondence NOTES: Standardized plant. N. Davis'RR: 1Cg.

05000530 REC IP IENT ID CODE/NANE PWR-B EB PWR-B FOB PWR-B PD7 PD PWR-B PEICSB INTERNAL ACRS IE FILE IE/DGAVT/GAB NRR PWR-B ADTS NRR/DHEXI TB ILE 01 EXTERNAL: BNL(ANDTS ONLY)

LPDR NSIC NOTES COPIES LTTR ENCL 1

1 1

1 1

1 6

1 1

1 1

0 1

1 1

1 1

1 1

1 1

1 RECIP IENT ID CODE/MANE PWR-B PEICSB PWR-B PD7 LA LICITRA>E PWR-B RSB ADM/LFNB IE/DEPER/EPB NRR BWR ADTS NRR ROE> M. L OQC/HDS1 RN/DDANI/NIB D~IB/DSS (AMDTS)

NRC PDR PNL QRUELe R COP IES LTTR ENCL 2

2 1

2 2

1 1

0 0

1 1

0 1

0 1

1 1

1 1

TOTAL NUNBER OF COPIES REQUIRED:

LTTR 34 ENCL 29

~

b I

l(l h w

'f"',

'I i,w h'1

~

S 1

II VVV

) vg k

I

'l

. <<<<i'h~bw v

.kw v

v I

I b

w V

k w

l g

~

k w g ~ "

Iv '.'v

<<k ) [0>>: J l v' vt ~ v Vh w

W'VV h

((vtl(1 w

(

1 hw I k

II II (g

(

V1 k

V/

4((v b.

ll Vf tv)e'/<<

2fwk,"

v.v, 1I t 'v

0) (V vt<<

V ~

VVV h P.

I

( V t'v'

Arizona Nuclear Power Project P.O. BOX 52034

~

PHOENIX, ARIZONA55072-2034 March 19, 1987 161-00087-JGH/PGN U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D. C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket No.

STN 50-530

Response

to Draft License (PVNGS Unit 3)

File:

87-D-056-026

Reference:

Letter from G.

W. Knighton (NRC) to E.

E.

Van Brunt, Jr.

(ANPP) dated March 6,

1987.

Subject:

Palo Verde Nuclear Generating Station, Unit 3 Draft License.

Dear Sir:

The referenced letter provided a copy of the PVNGS Unit 3 draft license and requested ANPP to review and provide any comments in writing.

Attached are ANPP's comments on the Unit 3 draft license.

Please contact Mr. William Quinn of my staff, if you have any questions.

Very truly yours, J.

G. Haynes Vice President Nuclear Production JGH/PGN/dim Attachment cc:

0.

M. De Michele E. E. Van Brunt, Jr.

A. C. Gehr G.

W. Knighton R. P.

Zimmerman J.

B. Martin (all w/a) 8703250334 870319 PDR ADOCK 05000530,)

PDR

0 k'

'4

ATTACHMENT SUGGESTED CHANGES TO THE DRAFT UNIT 3 OPERATING LICENSE Section 1.

No changes suggested.

Section 2.

Suggested changes are listed below:

1)

Paragraph C.(l)

Attachment 1 not submitted for review.

2)

Paragraph C.(1)

Delete the sentence "In addition operation above Mode 5

shall not proceed until successful testing and operability of Emergency Diesel Generators in accordance with 10CFR 50, Appendix A,

General Design Criterion 17, is achieved".

This is redundant with Paragraph D.(2).

3)

Paragraph C.(4) 4)

Change the second line of the paragraph to read "of the FSARs (Palo Verde and CESSAR) as modified b

ANPP letter 40056 dated Februar 9,

1987, made in accordance with".

(Underscoring indicates change).

Paragraph C.(5)

'elete the entire paragraph.

This License Condition is not required because ANPP has already submitted the Inservice Inspection Program by ANPP letter 161-00058, dated March 11, 1987.

5)

Paragraph D.(1)

Change the third line of the paragraph to read "exemption is authorized by law and will not present an undue risk".

(Underscoring indicates change).

6)

Paragraph D.(2)

Change the third line of the paragraph to read "fuel load and operation up to Mode 5 with the Unit 3

B Emergency".

(Underscoring indicates change).

7)

Paragraph F.

Change the fourth line of the paragraph to read "as approved in the SER through Supplement ll, subject to the following".

(Underscoring indicates change).

~l.

4 ~

t 4

I ~