ML17300A687
| ML17300A687 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/11/1987 |
| From: | Haynes J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| 161-00062-JGH-J, 161-62-JGH-J, NUDOCS 8703170105 | |
| Download: ML17300A687 (6) | |
Text
REQULATOR NFORNATION DISTRIBUTION TEN (RIDS>
ACCESSION NBR: 8703170105 DOC. DATE: 87/03/11 NOTARXZED:
NO DOCKET 0 F*CIL:STN-50-530 Palo Uerde Nuclear Station~
Unit 3i Arizona Publi 05000530 AUTH. NANE AUTHOR AFF/LIATION HAYNESiJ. Q.
Arizona Nuclear Power Prospect (formerly Arizona Public Serv RECIP. NAME RECIPIENT AFFILIATION KNIQHTON> Q. W.
PWR Prospect Directorate 7
SUBJECT:
Informs that only radiation monitoring equipment required bg Tech Specs will be tested prior to fuel load. due to unavailability of parts. List of affected monitors encl.
DISTRIBUTION CODE:
BOOID COPIEB RECEIVED: LTR g ENCL Q SIZE:
TXTLE: Licensing Submittal:
PSAR/FSAR Amdts 5 Related Correspondence NOTES: Standardi zed p lant. N. Davi si NRR: 1Cg.
05000530 REC IP IENT ID CODE/NAME PWR-B EB PWR-B FOB PWR-B PD7 PD PWR-B PEICBB
=
INTERNAL: ACRS 41 IE FILE XE/DGAUT/GAB 21 NRR PWR-B ADTS N
NTB EC'IL 01 EXTERNAL: BNL(AMDTB ONLY)
LPDR 03 NBIC 05 NOTES:
COP IEB LTTR ENCL 1
1 1
1 1
1 1
1 6
6 1
1 1
1 0
1 1
1 1
1 1
1 1
1 1
1 REC IP IENT ID CODE/NAME PWR-B PEICSB PWR-B PD7 LA LICITRAiE 04 PWR-B RBB ADM/LFNB IE/DEPER/EPB 3~
NRR BWR ADTS NRR ROE'. L OQC/HDS1 RN/DDANI/NIH DMG/DSS (AMDTB)
NRC PDR 02 PNL QRUEL> R COPIES LTTR ENCL 2
2 1
1 2
2 1
1 0
1 0
1 0
1 0
1 1
1 1
1 1
TOTAL NUMBER OF COPXEB REQUIRED:
LTTR 34 ENCL 29
)d g v fA )inqivpa piwc~o'Pinon rivi.t<<; 6 ~ r cf
)'>o l)"ioI L9ul e8 taxvq bc~ >o '
2 <<0+ <<:<<".<<iP<<b Zt38~ 4 6
'5<<.
'Ri dl."0 iQ<]
.3ZXB
.J')!<'3
- "iTJ.G3'>l3"'"Rl P.."-..SI'1Q ')LQC'<<<<:HUG+
".*X)V <<'<<<<:
> l "X(l Vi=~&nogaaz-a".-) ba."Sl aR
~~~ ai br<<.-'; 8;"~-: "--A<<~'<<S<<if ti equi.'r<<'~'~
aO
~. I, 3 <<1'i
'3l IC>>
J,~~l3 BYTE i
f%
J
Arizona Nuclear Power Project P.O. BOX 52034
~
PHOENIX, ARIZONA85072-2034 March ll, 1987 161-00062-JGH/JKR Director of Nuclear Reactor Regulation Attention:
Mr. George W. Kni'ghton, Project Director PWR Project Directorate
/l7 Division of'ressurized Water Reactor Licensing B
U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket No.
STN 50-530 Radiation Monitoring System (RMS)
File:
87-D-056-026
Reference:
Letter dated January 21,
- 1987, to G.
W. Knighton, NRC, from J.
G.
- Haynes, ANPP; (ANPP-39767-JGH/JKR/98/05)
Subject:
Radiation Monitoring System (RMS).
Dear Mr. Knighton:
The ANPP project goal for the Unit 3 Radiation Monitoring System (RMS) has been to complete all Phase I preoperational testing prior to fuel load.
We are working to an augmented schedule and had been progressing firmly towards that goal.
- However, we have experienced major problems due to the availability of parts.
As a result of these
- problems, we are forced to adjust our goal.
Our schedule now entails the completed testing of only those radiation monitoring equipment required by the Technical Specifications prior to fuel load.
The attachment to this letter lists those monitors that will not be tested prior to fuel load.
These monitors will be tested prior to initial criticality.
This change does not present a safety
- concern, and therefore no compensatory measures are required.
Those monitors not required by Technical Specifications and not listed in the in the attachment have been satisfactorily tested.
If you have any further questions, please contact Mr. W. F. Quinn of my staff.
Very truly yours, JGH/CW/dgd J.
G. Haynes, Vice President Nuclear Production Department cc:
0.
M. De Michele E. A. Licitra A. C. Gehr r
8703170105',87031 1
PDR ADOCX 0S000S30 A,
PDR E. E. Van Brunt, Jr.
R. P.
Zimmerman
i+i
~0 0
.10
ATTACHMENT Monitor Number
'Descri tion RU-2 RU-7 RU-9 RU-10 RU-14 RU-15 RU-27,28 RU-150 RU-204 RU-265 Essential Cooling Water Monitor Auxiliary Steam Condensate Monitor Auxiliary Building Lower Level Vent Monitor
'Auxiliary Building Upper Level Vent Monitor Radwaste Building Vent Exhaust Monitor Waste Gas Vent Exhaust Monitor Waste Solidification Area Monitors Primary Coolant Monitor Process Radiation Monitor Gas,"Stripper Monitor
li i5