ML17299B314
| ML17299B314 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/12/1986 |
| From: | Licitra E Office of Nuclear Reactor Regulation |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8606230172 | |
| Download: ML17299B314 (8) | |
Text
s -'l gpss ~KOy~
~
(4 4
~o iu O
0
+a*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 MAY yappy
~.
Docket No.:
50-528 YiENORANDUM FOR:
George W. Knighton, Director PWR Project Directorate No.
7 Division of PWR Licensing-8 FROM:
SUBJECT:
E. A. Licitra, Project Manager PWR Project Directorate No.
7 Division of PWR Licensing-B FORTHCOMING MEETING WI ARIZ P BLIC SERVICE COMPANY ON PALO VERDE RELOAD ANAL IS DATE 8 TIIIE:
LOCATION:
PURPOSE:
PARTICIPANTS:
Wednesday, June 4, 986 9:00 am Room P-110 Phil lips Building
- Bethesda, Naryland To discuss scope f alo erde Unit 1 analysis for Cycle 2 reload (see encl ed a
nda).
NRC C. Thomas, N.
- uben,
. Marsh, L. Kopp, E. A. Licitra APS R. Bernie
. Hiller, J.
Hopkins CE J.
Church, et al.
Enclosure:
As stated cc:
See next page E. A. Licitra, Project Manager PWR Project Directorate No.
7 Division of PWR Licensing-B 8606230272 8605i2 I
PDR ADOCK 05000528 P
]>
1
Mr. E.
E.
Van Brunt, Jr.
Arizona Nuclear Power Project Palo Verde CC:
Arthur C. Gehr, Esq.
Snell
& Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R.
- Kocher, Esq. Assistant Council James A. Boeletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Mr. Mark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Kenneth Berlin, Esq.
Winston
& Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Hs.
Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Ms. Jill Morrison 522 E. Colgate Tempi, Arizona 85238 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Suite 1310
- Bethesda, Maryland 20814 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Mr. Ron Rayner P. 0.
Box 1509
- Goodyear, AZ 85338 Hr. Roy Zimmerman U.S. Nuclear Regulatory Commission P. 0.
Box 239 Arlington, Arizona 85322 Ms. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Regional Administrator, Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596
e
ENCLOSURE Meetin A enda on PVNGS Unit I C cle 2 New Methodolo 1.
Introduction of Personnel 2.
Overview of PVNGS Unit I Cycle 2 Plans 3.
Special Features of PVNGS Unit I Cycle 2 Rel.oad CPC Improvement Program Including Reload Data Block Extended Statistical Combination of Uncertainties (SCU}
Westinghouse Fuel Assembly Demonstration Program 4.
Schedule/Scope for Submittals to NRC Extended SCU Methodology Technical Specification Changes Reload Analysis Report 5.
questions/Comments 6.
Feedback from the NRC 7.
Adjournment
t/
k
O.
May 12, 1986 MEETING NOTICE DISTRIBUTION Docket No.(s):
50-528 NRC PDR Local PDR PBD-7 Reading G. Holahan R.
Wessman N. Virgilio H. Denton B. Grimes J. Partlow Receptionist ACRS (10)
OPA H. Schaaf J.
Lee Project Manager E. A. Licitra NRC Partici ants C. 'thomas N. lwuben T. Marsh L. Kopp E. A. Licitra DESIGHJLTED ORIGINAL'ertified By
f 1
~
ll S
~I