ML17299B188
| ML17299B188 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/16/1986 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17299B189 | List: |
| References | |
| ANPP-36154-EEVB, NUDOCS 8604180177 | |
| Download: ML17299B188 (4) | |
Text
REGULA Y INFORMATION DISTR IBUTI '-
SYSTEN (R IDB)
ACCESSION NBR:"8604180177 DOC. DATE: 86/04/16 NOTARIZED:
NO DOCKET FACIL:BTN-50-52'P Palo Verde Nuclear Station>
Unit 2> Arizona Publi 05000529 AUTH. NANE AUTHOR AFFILIATION VAN BRUNT> E. E.
Arizona Nuclear Power ProJect (formerly Arizona Public Berv RECIP. NANE RECIPIENT AFFILIATION NNIQHTON> Q. H.
PlJR Prospect Directorate 7
SUBJECT:
Forwards Rev 2 to rept re single pipe support failure in Unit 1 containment. Eccentric loading of support is significant Factor. Three supports requiring design Nods identified. Necessary I'1ods will be completed before N 2.
DISTRIBUTION CODE:
A001D COPIES RECEIVED: LTR ENCL Sl ZE:
TITLE:
OR Submittal:
Qeneral Distribution NOTES: Btandardi zed plant.
05000529 RECIPIENT ID CODE/NANE PNR-8 ADTB PNR-8 PEICSB PMR-8 PD7 PD 01 PblR-8 PEICSB COPIES LTTR ENCL 1
0 2
2 5
5 1
1 RECIPIENT ID CODE/NAI'tE PNR-8 EB PNR-8 FOB LICITRA>E PWR-8 RSB COP lEB LTTR ENCL 1
1 1
1 INTERNAL: ACRS ELD/HDS3 NRR/GRAB RQN5 EXTERNAL: 24X LPDR NSIC 09 03 05 6
6 0
1 0
1 1
1 1
1 1
1 ADN/LFNB NR
/TBCB EQ 04 EQR(Q BRUSQUE> S NRC PDR 02, 1
0 1
1 1
TOT'AL NUBBER OF COPIES REQUIRED:
LTTR 30
- ENCL, 26
P'I N
a'
Arizona Nuclear Povver Project P.O. BOX 52034
~
PHOENIX, ARIZONA85072-2034 e
April 16, 1986 ANPP-36154-EEVB/RAB/98.05 Director of Nuclear Reactor Regulation Attention:
Mr. George W. Knighton, Project Director PWR Project Directorate 5/7 Division of Pressurized Water Reactor Licensing B U. S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Palo Verde Nuclear Generating Station Unit 2 Docket No.
STN 50-529 (License NPF-46)
Revision to Report on Pipe Support Failure File:
86-073-419 P.3.04.1
Reference:
Letter ANPP-36021 EEVB/RAB/98.05 dated April 9, 1986
Dear Sir:
The referenced letter transmitted our report (Rev.
1) concerning the single pipe support failure in the Unit 1 containment.
We have continued to evaluate this incident, and we have determined that eccentric loading of the support was also a significant factor in the cause of the failure.
The updated report (Rev.
- 2) is attached 'to this letter.
Evaluation of eccentric loading resulted in the identification of three supports requiring design modifications.
Necessary modifications will be completed prior to entering MODE 2.
Very truly yours, E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/RAB/dim Attachment cc.
E. A. Licitra R. P.
Zimmerman A. C. Gehr J. B. Martin (all w/a) 8604180177 860416 PDR ADOCK,05000529.
N W
D ff W
'I