Informs That Mods to Chemical & Vol Control Sys Completed, Per 851015,22,1104 & 0918 Commitments.Nde of Charging Pumps Performed,Per 851205 Commitment.No through-wall Cracks in Charging Pumps Identified
ML17299B156
Person / Time
Site: Palo Verde 
Issue date: 04/07/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-35963-EEVB, NUDOCS 8604110143
Download: ML17299B156 (10)


Text

REGULATE'NFORNATION DISTRIBUTI0

~YSTEl'1 (R IDS)

ACCESSION NBR: 8604110143 DOC. DATE: 86/04/07 NOTARIZED:

NO DOCKET 0 FACIL:STN-50-529 Palo Verde Nuclear Stations Unit 2i Av izona Publi 05000529 AUTH. NAl'tE AUTHOR AFFILIATION VAN BRUNT>E. E.

Arizona Nucleav'ower Pv object (fovmev lg Arizona Public Sev v REC IP. NANE RECIPIENT AFFILIATION KNIQHTON~ Q. W.

PWR Pv object Div ectov ate 7

SUBJECT:

Infovms that mods to chemical 5 vol contv ol sos completedi p ev'51015'2>

1 104 8t 0918 c ommi tments. NDE of chav gi ng pump s pev formed'er 851205 commitment. No through-wall cracks in charging pumps identified.

DISTR IBUTION CODE:

A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE:

OR Submittal:

Qenev al Di stv ibution NOTES: Standardized plant.

05000529 RECIPIENT ID CODE/NAl'1E PWR-B ADTS PWR-B PEICSB PWR-B PD7 PD 01 PWR-B PEICSB COPIES LTTR ENCL 1

0 2

2 5

5 1

RECIPIENT ID CODE/NANE PWR-B EB PWR-B FOB LICITRA>E PWR-B RSB COPIES LTTR ENCL ii 1

1 INTERNAL: ACRS ELD/HDS3 NRR/ORAS RQN5 09 6

6 1

0 1

0 1

1 ADN/LFMB SCB 04 1

0 1

1 EXTERNAL: 24X LPDR NSIC 03 05 1

1 1

EQi~~Q BRUSKEi S NRC PDR 02, 1

1 1

1, TOTAL NUNBER OF COPIES REQUIRED:

LTTR 30 ENCL 26

~<

~

~

s

~

1 P 'f V

II

~

r t

t 4

'r

Arizona Nuclear Power Project P.o. BOX 52034

~

PHOENIX. ARIZONA85072-2034 Apri1 7, 1986 ANPP-35963-EEVB/BJA/98.05 Director of Nuclear Reactor Regulation Attention:

Mr. George W. Knighton, Project Director PWR Project Directorate No.

7 Division of Pressurized Water Reactor Licensing B

U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No.

STN 50-529 (License No. NPF-46)

Confirmation of Completion of Modifications to the Chemical and Volume Control System File: 86-056-026

References:

(1)

(2)

Letter from E.

E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated October 15,
1985, (ANPP-33713).

Subject:

Auxiliary Pressurizer Spray Design.

Letter from E.

E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated October 22,
1985, (ANPP-33771).

Subject:

Additional Information Concerning the September 12;

1985, Event at Palo Verde Unit 1.

(3)

Letter from E.

E.

Van Brunt, Jr.,

ANPP, to G.

W.

Knighton, NRC, dated November 4,
1985, (ANPP-33905).

Subject:

Information Concerning the PVNGS Auxiliary Pressurizer Spray System.

(4)

(5)

Letter from E.

E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated September 18,
1985, (ANPP-33407).

Subject:

Auxiliary Pressurizer Spray.

Letter from E.

E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton, NRC, dated December 5, 1985, (ANPP-34174).

Subject:

Charging Pump Operability.

Dear Mr. Knighton:

The referenced letters committed to providing power to valves CH-501 and 536 from a 1E Motor Control Center that does not get shed from the bus on a Safety Injection Actuation Signal.

This commitment also required the modification to be completed prior to exceeding 5X power on PVNGS Unit 2.

ab04110MS ab0407 PDR ADOCK 05000M9

P PDR

/$0 l I[

g

r (l

Mr. G.

W. Knighton Confirmation of Completion of Modifications to the Chemical and Volume Control System ANPP-35963 Page 2

This modification to the PVNGS Unit 2

Chemical and Volume Control System (CVCS) has been completed in accordance with the commitments made in the referenced letters.

ANPP will provide the NRC Staff with confirmation of completion of the remaining CVCS modifications as they are completed.

Additionally, in Reference (5),

ANPP committed to perform an external surface examination of the PVNGS Unit 2 charging pumps for the purpose of collecting baseline data.

ANPP has completed a non-destructive examination (NDE) of the PVNGS Unit 2

charging pumps in accordance with the referenced commitment.

This NDE consisted of a liquid penetrant examination of the external surfaces of the charging pumps.

This examination did not show any existing thru-wall cracks in the charging pump blocks.

If you have any additional questions on this matter, please contact Mr.

W.

P.

Quinn of my staff.

Very truly yours, E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/BJA/dk cc:

E. A. Licitra R. P.

Zimmerman C. Y. Liang A. C. Gehr

t>

~

APR 'P

'l986 DOCKET NO($ )

50 529 Hr. E.. E. Van Brunt, Jr.

Executive Vice Pxesident Arizona nuclear Pcver Project P. 0. Box 52034 P)meninx, Arizona 85072-2034

SUBJECT:

ARIKKKPDBLIC SEFiHCE QGMPKK PALO VERDE NUCEZAR GENRXQKXGN STATXCN, UNIT 2

>>stribution:

Docket File PDR

&DR PBD7 Reading PRC System JLee (2)

The following documents concerning our review of the subject facility are transmitted for your'information.

O Notice of Receipt of Application, dated O Draft/Final Environmental Statment, dated D Notice of Availabilityof Draft/Final Environmental Statement, dated O Safety Evaluation Report, or Supplement No.

, dated D Notice of Hearing on Application for Construction Permit, dated D Notice of Consideration of Issuance of Facility Operating License, dated Bi-7%mklV gl ggg~ Notice; Applications and Amendments to Operating Licenses Involving no Significant Hazards Considerations, dated S

e 10671)

O Application and Safety Analysi's Report, Volume O Amendment No.

to Application/SAR dated D Construction Permit No. CPPR-D Facility Operating License No.

, Amendment No.

, Amendment No.

dated

, dated D Order Extending Construction Completion Date, dated D Other (Specifyf

Enclosures:

As stated Office of Nuclear Reactor Regulation cc:

See neW page I

OFF1Ce~

SURNAMe&

oive~ 4/

/86 NRC FORM 318 t1/84) NRCM 0240

P

'I

~

~

V

\\

I II A

I' C

  • 1

~ ~

Mr. E. E.

Van Brunt, Jr.

Arizona Nuclear Power Project Palo Verde cc:

Arthur C. Gehr, Esq.

Snell A Wilmer 3100 Valley Center Phoenix, Arizona 85073 Hr. James M. Flenner, Chief Counsel

- Arizona Corooration Coamission 1200 West Washinqton Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.

Southern California Edison Company P. 0. Box 800

Rosemead, Cali fornia 91770 Hr. Hark Ginsberg Energy Director Office of Economic Planninq and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Hr. Roy Zimnerman U.S. Nuclear Regulatory Cotnnission P. 0.

Box 239 Arlinqton, Arizona 85322 Kenneth Berl in, Esq.

Winston 8 Strawn Suite 500 2550 H Street, NW Washington, DC 20037 Hs.

Lynne Bernabei Government Accountability Prospect of the Institute for Policy Studies 1901 gue Street, NW Washinoton, DC 20009 Hs. Jill Hnrrisnn 572 E. Cnlqate Tempi, Arizona 85238 Hr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineerinq, Inc.

7910 Woodmont Avenue Suite 1310

Bethesda, Maryland 20814 Mr. Ron Rayner P. 0.

Box 1509

Goodyear, AZ 85338 Ms. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Regional Administrator, Region V

U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596

Chairman Arizona Corporation Commission P. 0.

Box 6019

Phoenix, Ar izona 85003 Arizona Radiation Regulatory Agency ATTN:

Ms.,Clara Palovic, Librarian 925 South 52nd Street Tempe, Arizona 85238 Hr. Charles Tedford, Director Arizona Radiation Regulatory Agency 924 South 52nd Street, Suite 2

Tempe, Arizona 85281 Chairman Maricopa County Board of Supervisors 111 South Third Avenue Phoenix, Arizona 85003