Submits Results of three-phase Evaluation Program Conducted to Identify Any Differences Between Unit 1 & 2 Control Rooms Which Would Result in Human Engineering Discrepancies (Hed). No New Heds Identified
ML17299B153
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/08/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737 ANPP-35986-EEVB, TAC-60480, NUDOCS 8604100241
Download: ML17299B153 (6)


Text

REGULA Y INFORMATION DISTR IBUTIOMSYSTEN (R IDS)

SUBJECT:

Submits results of three-phase evaluation program conducted to identify any differences between Unit 1

8c 2 control rooms which would result in human engineering discrepanci es (HED).

No new HEDs identified.

SI ZE:

DISTRIBUTION CODE:

A001D COPIES RECEIVED: LTR ENCL TITLE:

OR Submittal:

General Distribution V

ACCESSION NBR: 8604100241 DOC. DATE: 86/04/08 NOTARIZED:

NO DOCKET FAC IL:STN-50-528 Palo Verde Nuclear Station>

Unit 1> Arizona Pub li 05000528 STN-50-529 Palo Verde Nuclear Station>

Unit 2> Arizona Publi 05000529 AUTH. NANE AUTHOR. AFFILIATION VAN BRUNT> E. E.

Arizona Nuclear Power ProJect (Formerly Arizona Public Serv REC IP. NANE REC IP IENT AFFILIATION KNIGHTON> G. W.

PWR Prospect Directorate 7

NOTES: Standar dized plant.

Standard di zed plant.

05000528 05000529 REC IP IENT ID CODE/NAJ"JE PWR-B ADTS PWR-B PEICSB PWR-B PD7 PD 01 PWR-B PEICSB COPIES LTTR ENCL 2

5 1

RECIPIENT ID CODE/NAJ'JE PWR-B EB PWR-B FOB LICITRA>E PWR-B RSB COPIES LTTR ENCL INTERNAL: ACRS ELD/HDS3 NRR/QRAS RGN5 EXTERNAL: 24X LPDR

'SIC 09 03 05 6

1 1

0 1

1 1

1 1

1 ADN/LFNB NRR/DHFT/TSCB 04-EGSG BRUSKE> S NRC PDR 02.

TOTAL NUNBER OF COPIES REQUIRED:

LTTR 30 ENCL

a~

p

  • f; t

t

'l

~, l V'4

, S J

C 4

I 4-~

v Y

F

~glry,,

g 5

zg

~

l, 'q k"

)

~

gg >'I ll I

I

<<<:A f lh N

f

~

e C

j 4

'I P I I

e f,"jg J ~'g <<f J

l N '

4 J

E 1

1

~ (,

ll r

L jtg', p",

'l j';

I

~l

(

'4 8

J

, ',fs ffl

'S

">5, a

Pl l

g I'

Arizona Nuclear Power Project P.O. BOX 52034

~

PHOENIX. ARIZONA85072-2034 April 8, 1986 ANPP-35986-EEVB/LJM/98.05 Director of Nuclear Reactor Regulation Attention:

Mr. George W. Knighton, Project Director PWR Project Directorate 87 Division of Pressurized Water Reactor Licensing B U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station Unit 2 Docket No.

STN 50-529 (License NPF-46)

Differences Between Unit 1 and 2 Control Rooms File:

86-056-026

Reference:

(1)

Letter to E.

E.

Van Brunt, Jr.,

ANPP, from F. J. Miraglia,
NRC, dated December 9,
1985, Palo Verde Nuclear Generating Station, Unit 2 Issuance of Facility Operating License.

(2)

Letter to G.

W. Knighton,

NRC, from E.

E.

Van Brunt, Jr.,

ANPP, dated November 8, 1985.

Palo Verde Nuclear Generating

Station, Units 1 and 2, Schedule of NUREG 0737 Supplement 1,

Items.

Docket Nos.

STN-50-528 (License No. NPF-41)/529.

Dear Mr. Knighton:

The letter in Reference (1) states:

"Prior to exceeding 5X of full power, ANPP shall identify any differences between the Unit 1 and Unit 2 control

rooms, evaluate the differences to identify HEDs, if any, and propose actions and schedules to correct the HEDs."

ANPP conducted a

three phase evaluation program plan to identify any differences between the Unit 1 and Unit 2 control rooms which would result in Human Engineering Discrepancies (HEDs).

The three phases consisted of evaluating pre-planned control room differences between Unit 1 and Unit 2, evaluating temporary differences due to Design Change Packages (DCPs) being implemented at different times between the Units and conducting a walkdown of the Units'ontrol rooms and comparing the findings.

The results of the evaluation identified no new HEDs.

Currently, the total number of HEDs, not completed in Unit 2 remains the same as identified in Reference (2), with the required actions and schedules listed.

By submittal of this information, we have closed out the above stated license condition (Attachment 2, part b).

I I'b0410024i ab0408 PDR ADOCK 05000528 F'no

A

Mr. G.

W. Knighton Differences Between Unit 1 and 2 Control Rooms ANPP-35986 Page 2

If you have any questions, please contact Mr.

W.

F.

Quinn of my staff at extension 4087.

Very truly yours, gl~F tl4 E. E.

Van Brunt, Jr.

Executive Vice President Prospect Director EEVB/LJM/dk cc: