ML17299B138
| ML17299B138 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/18/1986 |
| From: | Miller L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML17299B133 | List: |
| References | |
| 50-529-86-07, 50-529-86-7, NUDOCS 8604070535 | |
| Download: ML17299B138 (2) | |
Text
APPENDIX A NOTICE OF VIOLATION Arizona Nuclear Power Project P.
O. Box 21666
- Phoenix, Arizona 85036 Docket No. 50-529 License No. NPF-46 As a result of the inspection conducted on February 24 - March 5,
- 1986, and in accordance with NRC Enforcement Policy, 10 CFR 2, Appendix C, the following violation was identified:
10 CFR 50.73 states in part, "The Licensee Event Report shall contain....
Operator actions that affected the course of the event, including operator errors, procedural deficiencies, or both, that contributed to the event.
For each personnel error, the licensee shall discuss....
Whether the error was contrary to an approved procedure, was a direct result of an error in an approved procedure, or was associated with an activity or task that was not covered by an approved procedure....
~ "
Contrary to the above, Arizona Public Service Company submitted by cover letter dated January 17, 1986, Licensee Event Report 85-005-00 to the NRC entitled "Control Room Ventilation Recirculation Discontinued Due to Operator Error".
The report did not discuss whether the error was contrary to an approved procedure, was a direct result of an error in an approved procedure, or was associated with an activity or task that was not covered by an approved procedure.
This is a Severity I,evel V Violation (Supplement I)
Pursuant to the provisions of 10 CFR 2.201, Arizona Public Service Company is hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:
(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
gAR 1.8 3986 L. F. Mi ler, Jr.,
C ief
~
~
~
Reactor Projects Section No.
2 86O40705SS 8603iS PDR ADOCg p500052 6
- PBR,
'I
~
~