ML17299A880
| ML17299A880 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 12/05/1985 |
| From: | ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-34172-EEVB, NUDOCS 8512170069 | |
| Download: ML17299A880 (4) | |
Text
REGULA RY INFORMATION DIBTRIBUTIO SYSTEM (RIDS) gt ACCESSION NBR: 85121700b9 DOC. DATE: 85/12/05 NOTARIZED:
NO DOClKT 0 FACIL:STN-50-528 Palo Verde Nuclear Stations Unit 1 i Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station.
Unit 2. Arizona Publi
.05000529 BTN-50-530 Palo Verde Nuclear Stations Unit 3. Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION Arizona Nuclear Power ProJect (formerly Arizona Public Serv RECIP. NAME RECIPIENT AFFILIATION MARTIN>J. B.
Region Si OFfice of Director
SUBJECT:
Corrected ltr Fortoardings revs to Emergency Plan Implementing Procedures 03-Obi 38 5 5b. Ltr date corrected from 85112b.
DIBTRlBUTION CODE:. A045D COPIES RECEIVED: LTR ENCL SIZE:
TITLE:
OR Submittal Emergency Prep Correspondence NOTES: Btandardi zed plant, OL: 12/31/84 Standardi zed plant.
Standardized plant.
05000528 05000529 05000530 RECIPIENT ID CODE/NAME PWR-B PD7 PD LEYTE M 01 INTERNAL: IE/DEPER/EPB Ob NRR/DBRO DIR RQN5 COPIES LTTR ENCL 2
1 1
RECIPIENT ID CODE/NA'ME P4IR-B PD7 LA LICITR*iE 01 E /IRB 12 RE FI ES 04 COPIEB LTTR ENCL EXTERNAL: 24X NRC PDR 02 LPDR NBIC TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL
4 i+It i "hC
~ 4,
~ Ih npn p
4 PV
- p. EI P h '
l
~
j 6hh 4
II" f>>'l l pnh l
. ~
P'.a 6""."
"'Ifp' 'A If ',ll'l i
~ an lip V
n'I q r-.
.t'l~", 4"
'f6.u>>I h If n,l 4
4'5 ft "ni,l i" II p'l 4
h fn," -"l 4
4 p.,l Ngp
,l hPll i i j p gl"'ll,,4 V
i
~ ll Jl4
."ph*p ff
(
j'"'.4 n
."" P>>"
" 'p n, I.p p'h p
hf
<}
h'> ',Phillip pg y
'," p pl,,
q ',
>>."ph-nh,, p",'
) pv),
f)nh'g lvpptt 4
t,h p
~"">'Ill~33-IR
'lliii;n'T'p'Al g4 "h <<hfv>>, 'ih
$ '~ h If
'I 4
fl I I )'I h h
>," Ph l pl j ihn' IV PPP I
h I
4
~ 4 li
'f
~ h i ~
P P.
If ii p
'f q ljl V
"n'll
'V(h A
Mr. John B. Martin, Region Office of Inspection and E
U.S. Nuclear Regulatory Commission Region V
1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 Arizona Nuclear Power Project P.o. BOX 52M4
~
PHOENlX, ARlZONA85072-2034 November 26, 1985 ANPP 34172 EEVB/GEC CORRECTED-DATE-December-5 1985>
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3
Docket Nos.
STN 50-528 (License No.
NPF 41)/529/530 Emergency Plan Implementing Procedure Update File: 85-056-026'5-002-493
Dear Mr. Hartin:
Arizona Public Service
- Company, as Project Manager and Operating Agent for Verde Nuclear Generating Station Units 1, 2,
and 3, is submitting herewith, suant to 10 CFR 50, Appendix E, updated information in the form of Copy No.
of implementing procedures for the Emergency
'Plan.
The revisions made to existing procedures affect Emergency Plan Implementing Procedures (EPIP's) 04, 05, 06, 38, and 56, as well as the Index.
Palo pur-8-8 the 03, In accordance with Generic Letter 81-27, certain EPIP's have been marked to indi-cate information considered privacy or proprietary (including
- names, home telephone
- numbers, and internal and external telephone numbers that must remain available during an emergency).
The specific information considered privacy or proprietary has been set off by brackets in the following EPIP's and respective pages:
EPIP No.
~Pa e No.
03 7, 10, ll, lla, lib, 12,
- 12a, 25 04 9, ll, 13,
- 13a, 13b, 14,
- 14a, 29, 33, 36 05 9,
10, ll, 12,
- 12a, 12b, 13,
- 13a, 29, 33, 37 8512170069 851205 PDR ADOCt4; 050005@8 I
F PDR jgnV~
l>>". >>>>W4A>>Vie'>>aa>>aa vA>> ~Q, e>> 4gfa(4p>>4'a
h
~l I.
l