REQULATORY INFORMATION DISTRIBUTION SYSTEN (RIDS)
ACCESSION NBR: 8512090073 DOC. DATE: 85/12/05 NOTARIZED:
NO DOCKET 0 FACIL:STN-50-529 Palo Verde Nuclear StationI Unit 2i Arizona Pub 1 i 05000529'UTH.
NANE AUTHOR AFFILIATION VAN BRUNT.E.E.
Arizona Nuclear Power Prospect (formerly Arizona Public Serv RECIP. NAKE RECIPIENT AFFILIATION KNIQHTONiQ. M.
PMR Prospect Directorate 7
SUBJECT:
Informs that two plant vent monitors do not meet commitment re gustification for interim operation of radiation monitors required bg Tech Specsi NUREQ-0737'tem II. F. 1
-Zc Rev 2 to Reg Guide
- 1. 97. Extension requested.
DISTRIBUTION CODE:
BOOID COPIES RECEIVED: LTR J ENCL Jg SI2E:
TITLE: Licensing Submittal:
PSAR/FSAR Amdts Cc Related Correspondence NOTES: Standardi zed plant.
65000529
~
RECIPIENT ID CODE/NANE PMR-B ADTS PMR-B PD7 LA INTERNAL: ACRS 41 ELD/HDS3 IE/DEPER/EPB 36 NRR BMR ADTS NRR PMR-B ADTS NRR/DHFT/HFIB S
DIR EQ 04 RN/DDANI/MIB COPIES LTTR ENCL RECIPIENT ID CODE/NAME PMR-B PD7 PD LICITRAiE 01 ADN/LFNB IE FILE IE/DGAVT/GAB21 NRR PMR-A ADTS NRR ROE> N. L NRR/DHFT/NTB NRR/DSRO/RRAB RQN5 COP IES LTTR ENCL EXTERNAL: 24X DNB/DSS (ANDTS)
NRC PDR 02 PNL QRUELi R 1
1 1
1 1
BNL(ANDTS ONLY) 1 LPDR 03 1
NSIC 05; 1
TOTAL NU<BER OF COPIES REQUIRED:
LTTR 35 ENCL
4
'l
(
24, b>>, (f,
'I 4, b,'>>
rxi ~
b Qr rr) r,r'"
g "4-
'blb2
.4 b>>b c! r <2
-I( -I
~ l 44 }H II 4
, 4 4
, ~
2 4/2 H
",s'(4 II I, "l.)~
~
,Xb 'f b,Jri vr J
H br rrrl,* frffif 2$
bb)'~
b[,b 2(
b
~ '"
Hxxl r
X Ã C I,?f
~ I
~ 4".v I'
th f llx."J b ~. ~erg("f "} " br'Hb b Hb}Ill r "HV If >>>>'J If bb il I }( I I 4 '4< 'a <W* ~ Hb l br }>>bbb 2 b," a k l'4"r I, bi(r 1 'bfrb (Y,'J '"'-., b 'bl}(bil (K>> b'!4. }' I,H l',g '} ~(1) I I I Xx I ', 'I I HI $'>>',fjl.,l If 'll/ il 2 "4 rb' 'b* P (2 H '4 g ~ 4 ~ 4 4 4 4 (2,'XX 22) V 4 b x>> >> l< 4 >(III~x' 'I lr 4 I g ~ Ir I) H ~ I' Ji 'I ( ~, >>III 4 H ~ b ref X Irrf' IX I'I 42 l Q ~ br ~', 4 bH tl ~ ~
Arizona Nuclear Power Project P.o, BOX 52034 ~ PHOENIX, ARIZONA85072-2034 December 5, 1985 ANPP 34177 EEVB/JKO Director of Nuclear Reactor Regulation Attention: Mr. George W. Knighton, Project Director PWR Project Directorate 87 Division of Pressurized Water Reactor Licensing B U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS) Unit 2 Docket No. STN 50-529 Justification for Interim Operation related to the Radiation Monitors required by Technical Specifications File: 85-056-026 G.1.01.10
Reference:
Letter to G. W. Knighton, NRC, from E. E. Van Brunt, Jr.,
- ANPP, dated November 29, 1985 (ANPP-34129);
Subject:
Justification for Interim Operation related to the Radiation Monitors
Dear Mr. Knighton:
In the referenced
- letter, we committed to have all radiation monitors which are subject to Technical Specification requirements operable prior to the mode for which they are required and without entering an action statement.
At this time, we may not be able to meet this commitment in regards to two plant vent monitors (RU-143 and RU-144). These monitors are also those required by NUREG 0737 II.F.1 and Regulatory Guide 1.97 Rev. 2. We also need extension on these related commitments. The two plant vent monitors are required at all times by the Technical Specifi-
- cation, however, they may not be operable prior to issuance of an operating license.:
At the time of issuance of an operating license, we would be required to enter the action statement of Technical Specification 3.3.3.9 which is allowed by the Technical Specification. Due to the work remaining, which involves some modifications, the monitors may not be declared operable until December 9, 1985. This request is justified since it is not possible to vent any radioactive release since there is no radioactivity until after initial criticality. Therefore, this extension would pose no safety problem. Other than this exception, our commitment stands as stated in the referenced letter. 05PPP>~+, 851205 @DR gDOCK 0 @DR
<<~
Mr. George, M. Knighton, Project Director Justification for Interim Operation related to the Radiation Monitors required by Technical Specifications ANPP 34177 Page 2 If you have any further questions, please contact Mr. W. F. Quinn of my staff. Very truly you s, $ 5 ca~~ E. E. Van Brunt, Jr. Executive Vice President Project Director EEVB/JKO/rw cc: E. A. Licitra M. C. Ley R. P. Zimmerman A. C. Gehr G. P. Yuhas
~ IV l}}