ML17299A783
| ML17299A783 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/29/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| ANPP-34128-EEVB, NUDOCS 8512030364 | |
| Download: ML17299A783 (6) | |
Text
REGUL'ATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)"
ACCESSION NBR:8512030364" DOC ~ DATE'. 85/11/29 NOTARIZED:
NO DOCKET FACfL:STN-50-529 Palo Verde Nuclear Stationi Unit 2g Arizona Publi 05000529 AUTH ~ NAME)
AUTHOR AFF>>ILIATION VAN BRUNTiE;E ~'rizonan
>>Vuc>>lear Power-Project- (for meri y Arizona Publ ic Serv, RECIP ~ NAME, REC'IPIKNT", AFFILIATI'ON KNIGHTON<G,')],
PAR Project Director ate 7
SUBJECT; Submits justification for interim operation of emergency lighting sys until. initial cr,itical,ity,Emergency lighting will not be fully operable prior to, fue~l load due to batteries failing 8' test>
DISTR IBUT'ION CODE 8 0 02Dl COPIES RECEIVED LITR
< ENCL'IZE ~
TITLE: L'icensing Submittal:
F-ire Protection NOTES:Standardized. plant; 05000529 R E CIPiI KNT ID CODE/NAMKl PAR 8
ADTS LAICI TRA g E 01 COPIES LlTTR ENCL>>
1 1
1 RECIPIENT'D CODE'/NAME; PWR. 8-PD7 PD COPIES L'TTR ENCL' 1
INTERNAL': ACRS 10 ELD/HDS3 RGN5 REG FILE<
04 1
0 1
1, EXTERNAL: 24X NRC PDR 02 1
1 1
LPDR NSIC 03~
Q5>>
1*
1 1
1 TOTAL NUMBER OF'OPIKS REQUIRED:
LTTR 17
- ENCL, 15'
N 1
II
~
pr I't V
4I IIp"r 4
II
Arizona Nuclear Povver Project P.O. SOX 52034
~
PHOENIX, ARIZONA85072-2034 November 29, 1985 ANPP 34128 EEVB/WFQ/PGN Director of Nuclear Reactor Regulation Attention:
Mr. George W. Knighton, Project Director PWR Project Directorate 87 Division of Pressurized Water Reactor Licensing B U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station Unit 2 Docket No. STN-50-529 Justification for Interim Operation related to Emergency Lighting.
Pile:
85-056-026
Dear Mr. Knighton:
The attachment to this letter is a justification for interim operation of the emergency lighting system until initial criticality.
Due to the emergency lighting batteries failing the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> test, emergency lighting will not be fully operable prior to fuel load.
New batteries will be procurred, installed and tested prior to initial criticality.
Since emergency lighting required for safe shutdown is part of the fixe protection program as described in FSAR Section 9B, this takes exception to the PVNGS commitment to have the fire protection program in place prior to fuel load.
If you have any question regarding this matter, please contact Mr. W. F. Quinn of my staff.
Very truly yours, E. E.
Van Brunt, Jr.
Executive Vice President Project Director EEVB/WFQ/PGN/dk Attachment'c:
E.A. Licitra M.C. Ley R.P.
Zimmerman A.C. Gehr 8512030364 851129 PDR ADOCN 05000529 F
PDR PII$0
. ~
~ '
a m
h 4
~I
A'ttachment to AfA'P'4128 ATTACHMENT JUSTIFICATION FOR INTERIM OPERATION Descri tion Emergency lighting system batteries.
Pro ected Com letion Prior to initial criticality.
~Hfstor Due to the emergency lighting batteries failing the 8
hour
- test, emergency lighting will not be fully operable prior to fuel load.
New batteries will be procurred, installed, and tested
'prior to initial criticality.
Justification for Interim 0 erati'on The batteries will be tested prior to initial criticality.
Prior to initial criticality, the batteries are not needed for safe shutdown since the reactor is already in a shut down configuration.
As a compensatory
- measure, flashlights are already available in the control room for emergency use.