ML17299A779

From kanterella
Jump to navigation Jump to search
Forwards Comments on Draft License.Comments Make License Consistent W/Unit 1 License,Per
ML17299A779
Person / Time
Site: Palo Verde 
Issue date: 11/27/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-34125-EEVB, NUDOCS 8512020486
Download: ML17299A779 (8)


Text

ACCESSION NBR: 8512020rI86 DOC, DATE: 85/11/27 NOTARIZED:

NO DOCKET FACIL:STN-50 529 Palo Verde Nuclear Stationr Unit 2i Arizona Publi 05000529; AUT'H,NAME:

AUTHOR AFF>>IL3, ATION

'AN BRUNTiE.E.'rizona>> Nuclear Power Project (former,ly Arizona. Public-Ser v'ECIP

~ NAME RECIPIE>>>>ITr AFFIL>>IATIQN KNIGHTON<G,W~

PWR Project Directorate 7

SUBJECT:

Forwards cor>>>>ments on>> draft 1 i cense

~ Comments make 1 icensei consi stent-w/Uni t>>

1 l i censer per. 851127 1 tr,,

DISTRIBUTION CODE:

8001D COPIES RECEIVED:LiTR>> Kl4CL>>

SIZE:

TITLE: Licensing Submi tta'1,:

PSAR/FSAR Amdts. 8 Re>>i ated Cor respondence.

NOTES:Standardized pla'nt>

050005?9 REC IP IKNT.

ID CDDK/NAMEI PWR~B ADTS PWR B

PD7 L'A INTERNALle ACRS rI1 ELD/HDS3 IE/DEPER/KPB 36 NRR BrIR ADTS NRR PAIR B

ADTS NR R /DHF;T/HF'I 8 NRR/DHFT/TSCB NRR/DSRO/RRAB RGN5>>

EXTERNAL'o 2rIX DMB/DSS (AMDTS)

NRC POR.

02.

PNL GRUELrR COPIES I.ITTR ENCL"

'1 0

1 0

6 6

1.

0 1

1 1

1 1

1, 1

1 1

3 3

1 1

1 1

1 1

RECIPIENT ID CODE/NAME.

PWR B

PD7 PD LICITRAgK'1<<

ADM/LFMB IE FILE" IE/DQAVT/QAB21 NRR PIER"A ADTS NRR ROE'>>>>I ~ LI.

NRR/DHFT/MTB:

DIR

'REG.

OrI RM/DDAMI/MI8 BNLt(AMDTS>> ONI.>>Y)

LPDR 03

NSIC, 05=

COP'I ES LTTR ENCL>>

1-

1 1

0 1,

1 1i 1

ii i

1 1

0 1

1 1

1 i

TOTAL NUMBER OF>> COPIES REQUIRED:

LTTR 36 ENCL.

30

g4

,1 II'

'h IJ 1f I1

Arizona Nuclear Power Project P.o. BOX 52034

~

PHOENIX, ARIZONA85072-2034 November 27, 1985 ANPP 34125 EEVB/WFQ/PGN Director of Nuclear Reactor Regulation Attention:

Mr. George W. Knighton, Project Director PWR Project Directorate ¹7 Division of Pressurized Water Reactor Licensing B U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN-50-529

Response

to Draft License (PVNGS Unit 2)

File: 85-056-026

Reference:

Letter from G.

W. Knighton (NRC) to E. E.

Van Brunt, Jr.,

(APS) dated November -26,'985.

Subject:

Palo Verde Nuclear Generating Station Unit 2 Draft License

Dear Mr. Knighton:

The referenced letter 'rovided a

copy of the PVNGS Unit 2 draft license and requested us to review it and provide any comments in writing by November 27, 1985.

Attached is a copy of our comments on the Unit 2 draft license.

These com-ments are provided to make the Unit 2 license consistent with the Unit 1 license.

Please contact Mr. William Quinn of my staff, if you have any questions.

Very truly

yours, E. E.

Van Brunt, Jr.

Executive Vice President Project Director EEVB/WFQ/PGN/rw Attachment cc:

E. A. Licitra M. C. Ley R. P.

Zimmerman A. C. Gehr 85f20204gg 8gg127 PDR ADOCN 05000529

~ A PDR

ATTACHMENT Suggested Changes in Draft Unit 2 Operating License Section 1.

No changes suggested Section 2.

Suggested changes are listed below:

Paragraph A.

Change the phrase "and is described in the licensees'inal Safety Analysis Report, as supplemented and amended,"

to read "and is described in the licensees'inal Safety Analysis Report, as supplemented and amended throu h Amendment No.

14 and as further amended as described in a letter b

APS ANPP-33996 dated November 14 1985 ". (Underscoring indicates change) 2)

3)

Paragraph C.(1)

Attachment 1 not submitted for review Paragraph C.(4)

Change the first sentence to read "One week rior to initial shift who has".

(Underscoring indicates change)

Change phrase "power levels greater then 20X" to read "power levels greater than 20X". (Underscoring indicates change)

Paragraph C.(5)

Change the second line of the paragraph to read "of the FSAR (Palo Verde and CESSAR),

as modified b

letter Au ust 30 1985 change) 5)

Paragraph C.(8)

Change paragraph to read:

"APS shall submit the inservice inspection program for Unit 2 for NRC review and approval four months rior to the first refuelin outa e". (Underscoring indicates change) 6)

Paragraph C.(10)

Change the body of Attachment 2 to read:

APS shall complete the following requirements of NUREG-0737 Supplement No.

1 on the schedule noted below, as rovided b

letter dated November ll 1985 ANPP-33965

(Underscoring indicates change)

(a)

HED corrections b

R.G. 1.97 instrumentation 4

Remainder of Attachment 2 not submitted for review

I

ATTACHMENT (continued)

Suggested Changes in Draft Unit 2 Operating License Paragraph C.(11)

Not submitted for review Paragraph C.(12)

Change the phrase "which meets the provisions of NUREG-0737 (II.B.3)"

to read "which meets the provisions of NUREG-0737 (II.B.3) and R.G. 1.97 Rev. 2". (Underscoring indicates change)

I" Paragraph D.(2)

Change the third line of the paragraph to read "which require protec-change)

Complete blanks Paragraph H.

Complete blanks

~

~

. ~

~

~

~

~