Forwards Justification for Interim Operation Until Containment Water Level Instrumentation Surveillance Tested. Surveillance Test Will Not Be Performed Prior to Fuel Load Due to Design Change
ML17299A777
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/27/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
TASK-2.F.1, TASK-TM ANPP-34123-EEVB, NUDOCS 8512020462
Download: ML17299A777 (6)


Text

II RKGUL'ATORY NFORMATION DISTRIBUTION" SY TEM (RIDS)

ACCESSION NBR:8512020062 DOC ~ DATE: 85/11/27 NOTARIZED:

NO DOCKE'T FACILsSTN 50-529. Palo~ Verde Nuclear Stat) one Unit 2~

Ar ) iona>> Publ i 05000529 AUTHNAME.

AUTHOR AFF'II..IATION VAN BRUNTPE ~ E ~'r ) zona Nucil ear Power Project (formerl y Ar i zona Publ,ic Serv, RECIP'AME RECIPIE4T AFFIL'IATION KNIGHTONE G ~ H ~P'AIR Project Directorate 7

SUBJECT:

For wards just i f f cation for

) nter

) m opera contalinment water., level. instrumentation" Surve'illahce test>> will not be performed due to.. design change.,

DISTRISUTION CDDE:

SDOID COPIES RECEIVED:l.tTR TITLE: Licens i'ng Submittal.:

PSAR/FSAR 'Amdt s 8

Rail NOTES:Standard)zed plant ~

tion unt)1 surve)llance tested,,

pf )or to'uell lo.ad ERCC L SIZE:

ated Correspondence 05000529 RECIPI EN T>>

ID CODE/NAMEI PI'JR~8 AOTS PAR-8 PD7 I.'A INTERNALla ACRS

'll ELD/HDS3-IK/DEPER/EPB-36 NRR 8'6R ADTS NRR O'AR"8 ADTS NR R/D HFIT/HFlI8

'RR/OHFT/TSCB NRR/DSRO/RRAB RGN5 COPIES LITTR ENCL 1

0 1

0 6

6 1.

0 1

1 1,.

1 1

1 1

1 1

1 1

3" 3~

RECIPIENT'D CODE'/NAME(

PAIR 8

PD7 PD, L'ICITRAgKl.

01 ADM/LFMB IEi FILET IE/DQAVT/QA821 NRR PAR"A ADTS NRR. ROE'E ivl", LI NRR/DHFT'/MTB" NRR DIR 04 RM/0 DAMI /MI8 COPIES LTTR ENCL 0

1 1

1 0

1 1i 1I i

i i>>

1 1

1 1

0

'XTERNAL: 29X 1

1 DMB/DSS (AMOTS) 1 NRC'OR 02 1

1 PNL. GRUKLgR 1

1 BNLt(AMDTS ONLY)

LPOR 03 NSIC 05i 1

1 1-1 1.

TOTAL NUMBER OF COPIES REQUIRED: I LTTR 36 ENCI.

30

7 4I Ssi," "Itf d

r tt~", lyr4 S

I f t )

I SI>>

il f II f>>t

~II 4

g>>it>>

gr, 4

~

\\

t>>

t>>

c Arizona Nuclear Power Project P.o. BOX 52034

~

PHOENIX. ARIZONA85072-2034 November 27, 1985 ANPP 34123 EEVB/JKO Director of Nuclear Reactor Regulation Attention:

Mr. George W. Knighton, Project, Director PWR Project Directorate

II7, Division of Pressurized Mater Reactor Licensing B UPS. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN-50-529 Justification for Interim Operation for Containment Water Level Instrumentation'ile:

85-056-026

Dear Mr. Knighton:

The attachment provides a justification for interim operation for PVNGS Unit 2 until the containment water level instrumentation can be surveillance tested.

A surveillance test will be used instead of a preoperational test to demonstrate the operability.

In the PVNGS TMI Lessons Learned Implementation Report (LLIR), item II.F.1.5, ANPP committed to have the instrumentation for containment water level pre-opera-tionally tested prior to fuel load.

Due to a

design change that affects the surveillance

test, the test will not be performed prior to fuel load.

We would like to request an exception to the previous commitment until Mode 3.

Mode 3

is when the instrumentation is required per the Technical Specifications.

Attach-ed is a justification for interim operation.

If you have any further questions, please contact Mr. W. F. Quinn of my staff.

Very truly yours, csu-'.'xecutive Vice President Project Director EEVB/JKO/rw Attachment cc: E.

M.

R.

R.

A.

J.

A. Licitra Ley P.

Zimmerman C. Sorenson C. Gehr B. Martin 85i2020462 85ii27

'DR ADOCK 05000529t A

PDR yon/

t

Attachment 1

JUSTIFICATION FOR INTERIM OPERATION

TAG NUMBERS SI-706 ARB SI-707 ARB DESCRIPTION INSTRUMENTATION INDICATING THE CONTAINMENT WATER LEVEL PROJECTED COMPLETION PRIOR TO INITIALMODE 3 ENTRY HISTORY:

A design change affecting the surveillance test for the containment water level instrumentation is not complete and will not be completed prior to fuel load.

A surveillance test will be done instead of a preoper-ational test to demonstrate the operability of the instruments.

Surveillance requirements of the Technical Specification adequately determines operability.

A functional test of the instrumentation has been completed.

This instrumentation was committed to in the PVNGS LLIR II.F.1.5 and is also a Regulatory Guide 1.97 Revision 2 instrument.

JUSTIFICATION FOR INTERIM OPERATION:

These instruments are wide-range instruments used for monitoring the containment water level.

They are required by the Technical Specification by Mode 3. There are narrow-range containment water level instruments that have been pre-operationally tested and can provide indication of rising water level inside containment.

With a new core there is no decay heat prior to initial'ode 3 entry, therefore, this issue has no safety significance.

Other instruments are available to further investigate any accident-type situation that may occur.

( ~