II RKGUL'ATORY NFORMATION DISTRIBUTION" SY TEM (RIDS)
ACCESSION NBR:8512020062 DOC ~ DATE: 85/11/27 NOTARIZED:
NO DOCKE'T FACILsSTN 50-529. Palo~ Verde Nuclear Stat) one Unit 2~
Ar ) iona>> Publ i 05000529 AUTHNAME.
AUTHOR AFF'II..IATION VAN BRUNTPE ~ E ~'r ) zona Nucil ear Power Project (formerl y Ar i zona Publ,ic Serv, RECIP'AME RECIPIE4T AFFIL'IATION KNIGHTONE G ~ H ~P'AIR Project Directorate 7
SUBJECT:
For wards just i f f cation for
) nter
) m opera contalinment water., level. instrumentation" Surve'illahce test>> will not be performed due to.. design change.,
DISTRISUTION CDDE:
SDOID COPIES RECEIVED:l.tTR TITLE: Licens i'ng Submittal.:
PSAR/FSAR 'Amdt s 8
Rail NOTES:Standard)zed plant ~
tion unt)1 surve)llance tested,,
pf )or to'uell lo.ad ERCC L SIZE:
ated Correspondence 05000529 RECIPI EN T>>
ID CODE/NAMEI PI'JR~8 AOTS PAR-8 PD7 I.'A INTERNALla ACRS
'll ELD/HDS3-IK/DEPER/EPB-36 NRR 8'6R ADTS NRR O'AR"8 ADTS NR R/D HFIT/HFlI8
'RR/OHFT/TSCB NRR/DSRO/RRAB RGN5 COPIES LITTR ENCL 1
0 1
0 6
6 1.
0 1
1 1,.
1 1
1 1
1 1
1 1
3" 3~
RECIPIENT'D CODE'/NAME(
PAIR 8
PD7 PD, L'ICITRAgKl.
01 ADM/LFMB IEi FILET IE/DQAVT/QA821 NRR PAR"A ADTS NRR. ROE'E ivl", LI NRR/DHFT'/MTB" NRR DIR 04 RM/0 DAMI /MI8 COPIES LTTR ENCL 0
1 1
1 0
1 1i 1I i
i i>>
1 1
1 1
0
'XTERNAL: 29X 1
1 DMB/DSS (AMOTS) 1 NRC'OR 02 1
1 PNL. GRUKLgR 1
1 BNLt(AMDTS ONLY)
LPOR 03 NSIC 05i 1
1 1-1 1.
TOTAL NUMBER OF COPIES REQUIRED: I LTTR 36 ENCI.
30
7 4I Ssi," "Itf d
r tt~", lyr4 S
I f t )
I SI>>
il f II f>>t
~II 4
g>>it>>
gr, 4
~
\\
t>>
t>>
c Arizona Nuclear Power Project P.o. BOX 52034
~
PHOENIX. ARIZONA85072-2034 November 27, 1985 ANPP 34123 EEVB/JKO Director of Nuclear Reactor Regulation Attention:
Mr. George W. Knighton, Project, Director PWR Project Directorate
- II7, Division of Pressurized Mater Reactor Licensing B UPS. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN-50-529 Justification for Interim Operation for Containment Water Level Instrumentation'ile:
85-056-026
Dear Mr. Knighton:
The attachment provides a justification for interim operation for PVNGS Unit 2 until the containment water level instrumentation can be surveillance tested.
A surveillance test will be used instead of a preoperational test to demonstrate the operability.
In the PVNGS TMI Lessons Learned Implementation Report (LLIR), item II.F.1.5, ANPP committed to have the instrumentation for containment water level pre-opera-tionally tested prior to fuel load.
Due to a
design change that affects the surveillance
- test, the test will not be performed prior to fuel load.
We would like to request an exception to the previous commitment until Mode 3.
Mode 3
is when the instrumentation is required per the Technical Specifications.
Attach-ed is a justification for interim operation.
If you have any further questions, please contact Mr. W. F. Quinn of my staff.
Very truly yours, csu-'.'xecutive Vice President Project Director EEVB/JKO/rw Attachment cc: E.
M.
R.
R.
A.
J.
A. Licitra Ley P.
Zimmerman C. Sorenson C. Gehr B. Martin 85i2020462 85ii27
'DR ADOCK 05000529t A
PDR yon/
t
Attachment 1
JUSTIFICATION FOR INTERIM OPERATION
TAG NUMBERS SI-706 ARB SI-707 ARB DESCRIPTION INSTRUMENTATION INDICATING THE CONTAINMENT WATER LEVEL PROJECTED COMPLETION PRIOR TO INITIALMODE 3 ENTRY HISTORY:
A design change affecting the surveillance test for the containment water level instrumentation is not complete and will not be completed prior to fuel load.
A surveillance test will be done instead of a preoper-ational test to demonstrate the operability of the instruments.
Surveillance requirements of the Technical Specification adequately determines operability.
A functional test of the instrumentation has been completed.
This instrumentation was committed to in the PVNGS LLIR II.F.1.5 and is also a Regulatory Guide 1.97 Revision 2 instrument.
JUSTIFICATION FOR INTERIM OPERATION:
These instruments are wide-range instruments used for monitoring the containment water level.
They are required by the Technical Specification by Mode 3. There are narrow-range containment water level instruments that have been pre-operationally tested and can provide indication of rising water level inside containment.
With a new core there is no decay heat prior to initial'ode 3 entry, therefore, this issue has no safety significance.
Other instruments are available to further investigate any accident-type situation that may occur.
( ~