ML17299A767
| ML17299A767 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/22/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| ANPP-34083-EEVB, NUDOCS 8511260430 | |
| Download: ML17299A767 (13) | |
Text
REGULATOf+INFORMATION DISTRIBUTION LITEM (RIBS)
ACCESSION'BR'5 1 1260430 DOC ~ DATE e 85/1 j, /22 NOTARIZED 'ES, DOCKET"-'
FACIL'~STN<<50 529 Palo Vei de Nuclear Stationg Unit 2i Arizona Publi'5000529 AUTH~NAME'UTHOR AFFILIATION VAN BRUNTiE' E',
Arizona Nuclear Power Project (formerly Ar izona PUblic Ser v RECIP ~ NAMEI RECIPIENT AFFILIATION DENTONtH ~ Rs Office of Nuclear Reactor Regulationg Director-(pre'51125)
SUBJECT:
Advises. thati designiconst 8 preoper ational,testing, essentially complete,,w/noted exceptions. Facility expected to.be'perationally ready to-commence process leading. to-fuel loading, on 851202',List of schedular exemptions encl+'ISTRIBUTION CODE~
BoolD COPIES RECEIVED:LTR ENCL SIZE:.'ITLEi Licensing Submittals PSAR/FSAR Amdts 8 Related Correspondence'OTES:Standardized plant>
05000529 RECIPIENT ID CODE/NAMEI PWR B
ADTS PWR~B. PD7, LA INTERNALe ACRS 41~
ELD/HDS3.
IE/DEPER/EPB 36 NRR BWR~ ADTS NRR-PWR B, ADTS NRR/DHFT/HFIB NRR/DHFT/TSCB NRR/DSRO/RRAB RGN5 EXTERNALS 20X DMB/DSS (AMDTS)
NRC" PDR'2'NL<
GRUEL'iR iCOPIES LTTR ENCL<
1 0
1.
0 e
1 0
1 1
1 1
1 1
1 1
1 1
1 3>>
3.
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME PWR B. PD7 PD LICITRA g E 01 ADM/LFMO IE FILE, IE/DQAVT/QAB21 NRR PWR~A ADTS NRR ROE'i' NRR/DHFT/MTB 0 DIR R
G F IL I
MIB 0Q BNL-(AMDTS ONLY)
LPDR 03 NSICT 05 COPIES LTTR ENCL~
1 0,
1 1
1 0
1 1
1 1
1 ~
1 li 1
1A 1
1 1
1 0
1 1
1 1 ~
1I 1
TOTAL NUMBER'- OF COPIES'EQUIRED:
LTTR 36 ENCL 30
'I En 1
Il )fi
~
tT I(
I
>>;I g>>
Arizona Nuclear Power Project P.O. BOX 52034
~
PHOENIX. ARIZONA85072-2034 November 22, 1985 ANPP-34083-EEVB/WFQ Dr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Certification Regarding the Design, Construction and Pre-Operational Testing of Palo Verde Nuclear Generating Station Unit 2 Docket No.
STN 50-529 File:
85-056-026'.l.01.10
Reference:
(1)
Letter from D.
G.
- Eisenhut, NRC, to E.
E.
Van Brunt, Jr.,
- APS, dated February 24, 1983;
Subject:
Certification Regarding the Design and Construction of the Palo Verde Nuclear Generating Stations, Units 1, 2 and 3
(2)
Letter from E.
E.
Van Brunt, Jr.,
- APS, to G.
W.
- Knighton, NRC, dated November 14, 1984;
Subject:
FSAR Update
Dear Dr. Denton:
Arizona Public Service Company (APS),
the applicant for an operating license for Palo Verde Nuclear Generating Station (PVNGS) Unit 2, wishes to advise you that
- design, construction, and pre-operational testing are essentially complete except as noted herein and that we expect Unit 2 and the operating organization to be operationally ready on December 2,
- 1985, to commence the process leading to the fuel loading of the unit in accordance with the Technical Specifications for Unit 2:
A.
FSAR and Licensin Commitments Status 10 CFR Part 50.71(e) recognizes that the FSAR is a living document subject to periodic updating to conform the plant description set forth therein to its actual state at any point in time.
To the best of our knowledge, Reference 2 identified the known changes necessary to update the FSAR to conform to a current status.
Future discrepancies will be handled in a manner compatible with 10 CFR Part 50.59.
Bgii2604SQ 85OioiRO I,
pDR ADOCK 0 pDR A
~
4 4
4 4
~
4
~
~
Dr. Harold R. Denton Certification Regarding the Design,'Construction and Pre-Operational Testing of Palo Verde Nuclear Generating Station Unit 2 ANPP-34083 Page 2
B.
Remainin Work Items The open item tracking systems in use at Palo Verde identify and track completion of outstanding hardware deficiencies, test deficiencies disclosed during pre-operational
- testing, inspection issues and other items requiring resolution.
Entries are reviewed and classified so as to identify restraints to plant operational modes.
Outstanding items currently on the tracking systems are typical of an operating plant in both number and scope.
Those items classified as restraints to fuel load will be closed out or dispositioned prior to commencement of fuel load.
Similarily, items classified as restraints to any of Operational Modes 5
through 1 will be'losed out or dispositioned before operation in such mode is commenced.
C.
Items Not Com lete for Which Schedular Exem tions Have Been Submitted Items required by the
- FSAR, other licensing commitments or other regulatory requirements which will not be completed by fuel load of Unit 2 are listed in Attachment 1.
Requests for schedular exemption and/or
)ustifications for interim operation respecting such items have been "submitted.
D.
Prep erational Tests Attachment 2 lists those Phase I (preoperational) tests which will be performed after initial fuel load per FSAR 14.2.5.
To the best of my knowledge, the foregoing addresses the remaining activities and items which bear upon your issuance of an operating license authorizing fuel loading and low power operation of Palo Verde Unit 2.
In summary, with the completion of such items as noted, except where schedular exemptions are
II 1,
Dr. Harold R. Denton Certification Regarding the Design, Construction and Pre-Operational Testing of Palo Verde Nuclear Generating Station Unit 2 ANPP-34083 Page 3
appropriate, I presently expect that we will be ready to commence the process leading to the fuel loading of Palo Verde Unit 2
on December 2,
1985.
Accordingly,- we request that a forty year operating license be issued on December 2, 1985.
Very truly yours,
~~
v'.
E.
Van Brunt, Jr.
Executive Vice President Project Director EEVB/WFQ/dim Attachment cc:
Mr. John B. Martin, Administrator U.S. Nuclear Regulatory Commission Region V
1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 R. P.
Zimmerman E. A. Licitra G.
W. Knighton F. Moraglia D. Canady A. C. Gehr J. R.
Bynum
e' V
t f
ll II r
ATTACHMENT 1 Schedular Exemptions SUBJECT Supplement 1 to NUREG-0737 Equipment Qualification Post Accident Sampling System Pressurizer Vent Valve (RC-108)
Auxiliary Spray System Modifications Auxiliary Spray System Modifications ASS ANPP LETTER 8 33965 33605 33573 34078
- 33713, 33771 33905 33712 DATE November 8, 1985 September 30, 1985 September 26, 1985 November 22, 1985 October 15, 22, 1985 November 4, 1985 October 12, 1985
C
)I t
J a
I
't
~
~
ATTACHMENT 2 TESTS TO BE PERFORMED AFTER INITIALFUEL LOAD (To Be Performed Per FSAR 14.2.5 Phase I Tests)
The Following Tests Have Not Been Performed 91PE-2LR02 92PE-2QF06 92PE-2SB20 92PE-2SQ01 92PE-2SQ02 92PE-2SQ03 92PE-2SQ04 91PE-2SS02 93PE-2QD02 Liquid Radwaste Evaporator Test In Plant Communications (Safety Frequency Radio Frequency)
DNBR Calculator to PMS Data Link Radiation Monitoring Preop Post Accident Radiation Monitor Digital Radiation Monitoring System Safety Related Radiation Monitoring Gas Analyzer Test Modular Emergency Lighting Units
STATE OF ARIZONA
)
) sso COUNTY OF MARICOPA)
I, Edwin E.
Van Brunt, Jr.,
represent that I am Mecutive Vice President, Arizona Nuclear Power
- Project, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
Edwin E.
Van Brunt, Jr.