ML17299A613
| ML17299A613 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde, 07002984 |
| Issue date: | 09/18/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8509230376 | |
| Download: ML17299A613 (6) | |
Text
DOCKET 05000529 05000530 07002984
SUBJECT:
Requests that NRC include storage of Unit 3 neutr on star tup sources in Unit 2 fuel. bldg under Unit 2 OL until Unit 3 fuel bldg functional for storage."
DISTRIBUTION CODEi 0001D-COPIES RECEIVED:LTR ENCL SIZE ~
TITLE!
I'3 censing Submittal:
PSAR/FSAR Amdts>> 8 Related Cor respondence REGULATORINFORMATION DISTRIBUTION LITEM (RIDE)
ACCESSION NBR:850923037b DOC CHOATE! 85/09/18 NOTARIZED!
NO FACILjSTN 50,529 Palo Verde Nuclear Stations Un)t 2i Arizona Publi STN"50 530 Palo Verde~ Nuclear Stations Unit 3i Arizona Pub'li 70 2984 ArizonaI Public Service Co,E Phoenix'Zi AUTH BYNAME AUTHOR AFFILIATION VAN BRUNT'" E ~
Ar izona Nuclear Power Pr oject (formerly Arizona Public Serv RECIP ~ NAME RECIPIENT AFFILIATION KNIGHTONg G ~ H ~
Licensing Branch 3
NOTESiStandardized plant>
Standardized plant'G 05000529 05000530 RECIPIENT IO CODE/NAME<
NRR/DLIAOL NRR LB3. LA INTERNAL'; ACRS 41 ELD/HOS3 IE/DEPER/EPB 3b'RR ROEgM ~ L NRR/DE/CEB 11>
NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/OHFS/PSRB NRR/DS I/AEB 2b NRR/DSI/CPB.
10.
NRR/OSl/ICSB 16*
NRR/DSI/PSB
., 19 NRR/DS I /RSB 23>>
RGN5 EXTERNAL'N 24X OMB/DSS (AMDTS)
NRC PDR 02" PNL>> GRUEL,'rR COPIES LTTR ENCL>>
1 1
~
6 1
1 1
1 1
1 1
1 1
1>>
1 1
1 1
RECIPIENT ID CODE/NAMEi NRR>> LB3 BC LICITRAg E 01 AOM/LFMB IE FILE.
IE/DQAVT/QAB21 NRR/DE/AEA9 NRR/DE/EHEB NRR'/OEIGB 28 NRR/DE/MTE8 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32'RR/DL/SSP8 NRR/DS I/ASB NRR/OSI/CSB 09 NRR/DSI/METB 12 N
B 22 EG. FIL 04 R
&I/MI8 BNL(AMDTS ONLY)
LPDR 03 NSIC 05 COPIES LTTR EN L 1
0 1
1 1
1.
1 0,
1 1
2 1
1 1
1 1
1 1
1 V
1 1
TOTAL NUMBER'F COPIES REQUIRED ~
LTTR 52 ENCL-
)
1 Ek W
lt'
~ <<
It l
k 1
r'I k<<'
ll'<<<< fk I
" 1A
~
tk) f 1'>><< ',.
i I
~ I)
M F>>I'k tii
)
I Mt k l
)A r
~
k
~
M tt
)
r'f,r<<J
~
4 ki kf g ktfl) <<0 f
1 ll lf 1
1' kk>>lr 1
1 lk D<<f W
~
itt II<< I(f)
W 34>>
1F 1 fr lw(t F
'F yekf "F
<<Mt 1
F'<<
f <<<<
M<< ~
1kw II
~
<<N pfk )f MWW" tt,, <<Q; I
ft It l<<
W)+f>>f')
IMI fit M
M "I( f(
1 III
~
. tf
> l r,"1
)kk r<<
~ 4 Mkf, f
~ '1ktf>> I D>>
k % F P' I
I. f '(, 'k,,
~
If T k i
~
i I <<rk<<t F fr>>)k f" '-I'f k<<k,1 DYg 1
f f,g.
T.)
I I II k 'M Pi,P Nr, kl 1" kX F
,I I <<kt II 'll i!
-lthl I ti tt xI M MM w Mtt I lk (k D
<<I M
1$
~fr I
<<t<<tt Mff<<tt(fkf I ~ l<<>>'W>>"
k',,MM, W>>VM I>> I % k')kttw I<<
f(
F)1
)
'kA y
<<I(
f, T>>,,
M!I ak I!
~ ft)! t1fx It ti
>>k II 1
k
~,il
$ <<k I
3'I k
0 Iit 'i" 1
1
Arizona Nuclear Power Project P.O, BOX 52034
~
PHOENIX, AAIZONA85072-2034 Director of Nuclear Reactor Regulation Attention:
Mr. George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.
20555 September 18, 1985 ANPP-33516-EEVB/JRP
~p c>>
~)VS'ubject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Operating License Docket No; STN 50-529 File:
85-056-026
Reference:
(A)
Letter from E. E.
Van Brunt, ANPP-31807-WFQ/JRP, dated 1/28/85, to Director of Nuclear Materials Safety and Safeguards (B)
Letter from W. T. Crow.,
NRC, dated 3/19/85, to E. E.
Van Brunt
Dear Mr. Knighton:
As previously discussed with Mr. E. A. Licitra of your staff, ANPP intends to use the PVNGS Unit 2 fuel building as a storage location for Unit 3 neutron startup'ources.
ln Reference (A) we requested an amendment to the Special Nuclear
" Materials License for Unit 2 (SNM-1922) for storage of Unit 3 neutron startup sources.
Reference (B) granted the request for an amendment to store additional sources under the Unit 2 SNM License.
The expiration date of SNM-1922 License for Unit 2 is 12/31/87, or upon conversion of Construction. Permit No. CPPR-142 to an operating license, whichever is earlier.
We hereby request that'he NRC include the storage of Unit 3 neutron startup sources in the Unit 2 fuel building under the operating license for Unit 2 until such time that the Unit 3 fuel building is deemed functional for storage.
The Nuclear Fuel Management Department and the Radiation Protection Department have evaluated several options and determined that the best storage option is to store the Unit 3 neutron startup sources at Unit 2 in a shielded storage cask.
The shielded storage cask will be employed to store up to a maximum of four neutron startup sources, each source having 20 curies of activity and containing 1.15gm PuBe.
After a review of "the alternatives available, a shielded storage cask stored in the Unit 2 fuel building is the most feasible option based on security, radiation protection, material accountability and inventory.
.8509230376 8509i8
'PDR 'DOCK 0500052 PDR pdIII I 0
/
M. Knighton, Chief
'nit 2 Operating License~
ANPP-335l6 Page 2
If you have any questions, please call.
Very truly yours, z=~v~8~
AJ E. E.
Van Brunt, Jr.
Executive Vice President Project Director EEVB/JRP/slh cc:
Director, Region V USNRC NRC Project Manager E. A. Licitra NRC Resident Inspector R. P.
Zimmerman
I