ML17299A458
| ML17299A458 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/19/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| ANPP-33068-EEVB, NUDOCS 8507230165 | |
| Download: ML17299A458 (8) | |
Text
R E G UL AT
~ F 0 R MATI0 N DI S T R IB UTI0 Y
M
( R ID S )
ACCESSION NBR:8507230165 DOC ~ DATEe 85/07/19 NOTARIZED:
YES
'ACIL:STN"50-528 Palo Verde Nuclear Station~
Unit 1~ Arizona Publi STN 50-529 Palo Verde Nuclear Stationi Unit 2i Ar)zona Pub'li STN-50-530 Palo Verde Nuclear Stations Unit 3r Arizona Publi AUTH BYNAME AUTHOR AFFILIATION VAN BRUNTiE,E, Arizona Public Service Co.
REC IP ~ NAME RECIPIENT AFFILIATION KNIGHTONp G ~ li~
Licensing Branch 3
DOCKET 05000528 05000529 05000530
SUBJECT:
Advises of util 850717 voluntary. reduction of linear heat" rate limit to meet acceptance criterion on peak clad temp per 10CFR50
~ 06iin response to 850717 telcon re util 850712 ltd Max temp would be 2i203 F ~
DISTRIBUTION CODE:
A001D COPIES RECEIyED>LTR, 1'NCL. SIZE~
TITLE:
OR Submittal:
General Distribution NOTES:Standardized plant.
OL: 12/31/80 Standardized plant.
Standardized
- plant, 05000528 05000529 Q500053Q RECIPIENT ID CODE/NAME;,
NRA LS3 BC 01 COPIES LTTR ENCL 7
7 RECIPIENT'D CODE/NAME COPIES LTTR ENCL INTERNAL: ACRS 09 ELD/HDS3 NRR/Dl DIR NRR/DL/TSRG NRR/DSI/RAB RGN5 ADM/LFMS NRR/DE/MTEB NRR/DL/ORAB NRR ETB OQ EXTERNAL; 24X I.PDR iV SIC 03 05 EGEG BRUSKEgS NRC PDR 02'OTAL NUMBER OF COPIES REQUIRED:
LTTR 28 ENCL
~
g,<<l r
~
I
'I r
r h
II r Cf>
h lf pl ~ r'> f l,>>
Sr(,
jt I
1 I,r f
~
e I".) '5 l<<
I ~ II I >>
j<<((f h>>,
~
l>>
f ~ (,f lf rfs f
h' N
w
Arizona Nuclear Power Project P.o. BOX 52034
~
PHOENIX. ARIZONA85072-2034 Director of Nuclear Reactor Regulation Attention:
Mr. George W. Knighton, Chief Licensing Branch No.
3 Division of Licensing U.S. Nuclear Regulatory Commissio'n Washington, D.C.
20555 ANPP-33068-EEVB/WFQ/KLM July 19, 1985
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3
Docket Nos.
STN 50-528 (License No. NPF-41)/529/530 Voluntary Reduction of Linear'eat Rate Limit File:
85-056-026 G.1.01.10
Reference:
Letter to G.
W. Knighton, NRC, from E..E.
Van Brunt, Jr.,
ANPP, dated July 12, 1985 (ANPP-33006);
Subject:
Potential LOCA Analysis Non-Conservatism
Dear Mr. Knighton:
Per telephone conversation with Brian Sheron, of your staff, held on July 17, 1985, ANPP was informed that the information contained in the referenced letter presently provided an unacceptable basis for compliance with the acceptance criteria of 10CFR 50.46.
As a result of the discussion on July 17, 1985, ANPP has decided to voluntarily administratively reduce the linear heat rate (LHR) limit to a value which will be sufficient to meet the acceptance criterion on peak clad temperature (PCT) contained in 10CFR 50.46.
The amount of reduction of the LHR limit. is based on the CE preliminary evaluation of the CESSAR worst-case large 'break LOCA analyses, which ANPP currently references.
CE's estimate of the increase in PCT, from their evaluation, resulting from a more adverse axial power distribution and peaking factor is 34'F.
The current maximum PCT presented in CESSAR is 2169'F.
Therefore, the maximum value of PCT for PVNGS Units 1, 2, and 3 would be 2203 F.
CE has informed ANPP that the sensitivity on the LHR limit is 0.1 kw/ft to 25'F PCT.
By using this sensitivity, a reduction in the LHR limit to 13.9 kw/ft is sufficient to meet the acceptance criterion on PCT in 10CFR 50.46.
ANPP will implement this administrative limit, applicable to PVNGS Units 1, 2 and 3
(PVNGS Unit 1 Technical Specification 3.2.1), of 13.9 kw/ft prior to exceeding 80X power (which is consistent with the worst-case large break LOCA analysis assumptions) and willliftthis limit.upon staff review and approval of the PVNGS Unit 1, 2, and 3 large break LOCA reanalysis to be performed after the staff's review and approval of the C-E revised large break LOCA evaluation -model.
85072~016~
pQ52P pDR WDOC" pDR P
Poo0 Ill 4p
A~
G.'W. Knighton Voluntary Reduction of Linear Heat Rate Limit ANPP-33068 Page 2
If you should have any questions concerning this matter, contact Mr. W. F. quinn of my staff.
Very truly yo s,
E. E.
Van Brunt, Jr.
Executive Vice President Project Director EEVB/WFQ/KLM/slh cc:
E. A. Licitra R. P.
Zimmerman A. C. Gehr B. Sheron J.
Bynum J. Allen
l
~il4 STATE OF ARIZONA
)
) ss.
COUNTY OF MARICOPA)
I, Edwin E.
Van Brunt, Jr.,
represent that I am Executive Vice President, Arizona Nuclear Power Project, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
Edwin E.
Van Brunt, Jr.
Sworn to before me this
,day of 9'1985.
)
'"~(~
4 My-Commission: Expires:
I(
f'iy Cotrimis:"lop Exp!ms Apflt 6, 1987 Notary Public
i a
~
a
~ r r, r a
~ xg H
lf h
F f~
l.
V l
H ek
<<gE,l
<>,,
'r
~
Ig~
l I
l