Arizona Nuclear Power Project P.o. BOX 52034
~
PHOENIX. ARI2ONA85072-2034'985 Jul
< l
'-~~ '
~
U. S. Nuclear Regulatory Commission Region V
1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 July 8, 1985 REG10NVI~E ANPP-32977-EEVB/TJB Attention:
Subject:
Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No.
STN 50-529 Notice of Violation 50-529/85-10/02, Inspection of Raceway Installations (pullboxes)
File:
85-019-026 D.4.33.2
Reference:
Letter from E. E.
Van Brunt, Jr.,
(ANPP)"to D. F. Kirsch (NRC),
dated June 12, 1985; Notice of Violation 50-528/85-10/Ol and 50-529/85-10/02 Inspection of Raceway Installations Units 1
and 2 (ANPP-32817).
Dear Sir:
The reference letter committed to disposition Nonconformance Report (NCR) EA-6125 and complete any identified rework by June 29, 1985.
Due to a scheduling conflict, the rework required to close out the NCR was not completed.
The revised schedule completion date for NCR EA-6125 is now July 12, 1985.
4
\\
Very truly yours, EEVB/TJB/slh E. E.
Van Brunt, Jr.
Executive Vice President Project Director cc:
A. C. Gehr E. A. Licitra R. P.
Zimmerman J.
R. Ball S507ieoaSS s5070S PDR ADQCK 05000529 8