Responds to Violations Noted in Insp Rept 50-529/85-10. Revised Schedule Completion Date for Nonconformance Rept EA-125 Re Raceway Installations Delayed Until 850712 Due to Scheduling Conflict
ML17299A449
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 07/08/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-32977-EEVB, NUDOCS 8507190255
Download: ML17299A449 (2)


Text

Arizona Nuclear Power Project P.o. BOX 52034

~

PHOENIX. ARI2ONA85072-2034'985 Jul

< l

'-~~ '

~

U. S. Nuclear Regulatory Commission Region V

1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368 July 8, 1985 REG10NVI~E ANPP-32977-EEVB/TJB Attention:

Subject:

Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No.

STN 50-529 Notice of Violation 50-529/85-10/02, Inspection of Raceway Installations (pullboxes)

File:

85-019-026 D.4.33.2

Reference:

Letter from E. E.

Van Brunt, Jr.,

(ANPP)"to D. F. Kirsch (NRC),

dated June 12, 1985; Notice of Violation 50-528/85-10/Ol and 50-529/85-10/02 Inspection of Raceway Installations Units 1

and 2 (ANPP-32817).

Dear Sir:

The reference letter committed to disposition Nonconformance Report (NCR) EA-6125 and complete any identified rework by June 29, 1985.

Due to a scheduling conflict, the rework required to close out the NCR was not completed.

The revised schedule completion date for NCR EA-6125 is now July 12, 1985.

4

\\

Very truly yours, EEVB/TJB/slh E. E.

Van Brunt, Jr.

Executive Vice President Project Director cc: