ML17299A447
| ML17299A447 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/21/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML17299A448 | List: |
| References | |
| ANPP-32877-EEVB, NUDOCS 8507190253 | |
| Download: ML17299A447 (8) | |
Text
Artzona Nuclear Poorer Project, >8 g~ 8: >5 P.O. BOX 52034 o
PHOENIX, ARIZONA85072-2034 9%
Mr. John B. Martin, Regional Administrator Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region V
1450 Maria Lane, Suite 210 walnut Creek, CA 94596-5368
~t:.gONV ~<"-
'une 21, 1985
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No. STN-50-528 (License NPF-41)
Activation of Unit 1 License File:
85-056-026 G.l.01.10 85-001-762
Reference:
(1)
Letter from E. E.
Van Brunt, Jr.
(ANPP) to J.
B. Martin (NRC),
dated May 21, 1985; Operator License Renewal Applications, (ANPP-32693).
(2)
Letter from E. E.
Van Brunt, Jr.
(ANPP) to J.
B. Martin (NRC),
dated May 30, 1985; Activation of Unit 1 License, (ANPP-32747)
Dear Mr. Martin:
In response to a phone call with Mr. R. J. Pate of your staff on June 19,
- 1985, we are providing confirmation of the actions taken prior to activation of Mr. Kenneth L. Koppelman for control room duties in 'Unit 1.
Mr. Koppelman was removed from the Operations Support Group, where he had been involved in coordinating the review and revision of procedures for approximately five
- months, and was placed in Unit 1 as an extra,man on shift for forty hours in accordance Pith reference (1).
Next, in accordance with FSAR section 13.2.2.1.4, "Inactive Status Retraining",
and PVNGS Station Manual Procedure 82TR-9ZZ03, "Requalification Procedure for Licensed Operator Retraining",
he was given an oral examination similar in scope and format to the annual oral examination.
He successfully passed this examination (see attached documentation).
- Lastly, a review was performed by the training department to determine his performance in the requalification training program.
This review determined that he is current in the requalification program.
Based on the foregoing actions, ANPP believed that Mr. Koppelman had demonstrated his knowledge and understanding of the facility operation and administration and at that time submitted Reference (2) to the NRC certifying Mr. Koppelman as acceptable for duties in Unit 1 as required by 10 CFR55.31(e).
He was then assigned to Unit 1 beginning on June. 1, 1985.
8507i90253 '85062i V
PDR ADOCK 05000528 fDR-J
4 1
I(r-II IJ
~ V
>>(eII p
I
Mr. John B. Martin, Regional Administrator Act'ivation of Unit 1 License ANPP<2877 Page 2
If you should have any further quesitons, please contact Mr. William Quinn of my staff at (602) 943-7200, extension 4087.
Very truly yours
(~AA,~
E. E.
Van Brunt, Jr.
Executive Vice President Project Director EEVB/TJB/slh Attachment cc:
A. C. Gehr R. P.
Zimmerman E. A. Licitra R. J.
Pate (w/a)
~
c r
Mr. J.
B. Martin Activation of Unit 1 License ANPP-32877 Page 3
bcc:
E. E.
Van Brunt, Jr.
D. B. Karner J.
R.
Bynum J.
M. Allen F. E. Hicks P. J. Wiley R. E. Younger W. F. Quinn S.
R. Frost
l4
~ $
.alf40CA, QM) 4190-KA)2) tBX/500)
'I j-Arizona Nuclear Power Project COMPANY CORRESPONDENCE
.PVNGS-DEC->j85-004 OATE:
Hay 31, 1985 TO:
- sta.a Ext. a FROM:
Sta. )t Ext. a Forrest Hicks 6195 6326 David E. Craig Qfgc 6192 6373 SUBJECT License Activation Oral evaluation and Re.ualification C cle Performance of K.L. Ko elman File g:
85-001-762 The oral evaluation given K.L. Koppelman is attached.
Knowledge level displayed was satisfactory.
A review of Koppelman's performance in the requalification pro-gram shows satisfactory completion of requirements through session 4.
K.L. Koppelman satisfies the requalification procedures requirements for acti-vation of his inactive license.
DEC/ac
l