REGULAT
<FORMATION DISTRIBUTION i
M (RIDS)
ACCESSION NBR:8507 FACIL:STN"50 "5? 8 STN"50-529 STN 50 530 AUTH,NAhlE VAN BRUNTiE ~ ED REC IP ~ NAthE KNIGHTONI G e 1604<l6 DOC ~ DATE: 85/07/10 NOTARIZED:
NO palo Verde Nuclear Stationi Unit 1< Arizona Publi Palo Verde Nuclear Station<
Unit 2i Arizona Publi Palo Verde Nuclear Stationi Unit 3i Arizona Publi AUTHOR AFF ILIATION Arizona Public Service Co.
RECIPIENT AFFILIATION Licensing Branch 3
DOCKET 050005?8 05000529 05000530
SUBJECT:
Forwards schedule for revising plant"specific technical guidelines for procedures generation package L emergency operating procedures.
DISTRIBUTION CODE:
A045D COPIES RECEIVED:
TR ENCL SIZE:
TITLE:
OR Submittal Emergency Prep Correspondence NOTES:Standardized plant ~
OL:12/31/84 Standardized plant.
Standardized plant.
05000528 05000529 05000530 RECIPIENT ID CODE/NAhlE NRR LB3 BC LICITRAgE 01 COPIES LTTR ENCL 1
1 1
1 RECIPIENT ID CODE/NAME NRR LB3= LA COPIES LTTR ENCL 1
0 INTERNAL: IE/DEPER/EPB 06 NRR/DSI/AEB RGN5 2
2 1
1 1
1 E
ER/IRB 12 1
1 E
04 EXTERNAL: 24X NRC PDR 0?.
1 1
1 1
LPDR NSIC 03 1
1 TOTAL NUMBER OF COPIES REQUIRED'TTR 13 ENCL 12
~
~
Arizona Nuclear Power Project P.o. BOX 52034
~
PHOENIX, ARIZONA85072-2034 Director of Nuclear Reactor Regulation Attention:
Mr. George Knighton, Chief Licensing Branch No.
3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 July 10, 1985 ANPP-32987-EEVB/MAJ
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3
Docket Nos. STN-50-528(License No. NPF-41)/529/530 License Condition 2.C(11)(a)
Procedure Generation Package (PGP)/
Emergency Operating Procedures (EOPs)
File:
85-056-026'.1.01.10
Reference:
Letter from J.
A. Zwolinski, NRC, to R. W..Wells, CEOG, dated April 16, 1985 (LS05-85-04-017).
Subject:
Supplement 1 to Safety Evaluation Report for CEN-152, "Combustion Engineering Emergency Procedure Guidelines."
Dear Mr. Knighton:
License Condition 2.C(11)(a) states, "Three months after the staff issues its evaluation of Revision 2 to the CE Owners Group emergency procedure guidelines (CEN-152), dated May 8, 1984, APS shall provide a schedule for revising (i) the Procedure Generation Package to be in conformance with Revision 2 to CEN-152, as modified by the staff's evaluation, and (ii) the emergency operating procedures to be in conformance with the revised Procedures Generation Package."
The referenced letter transmitted the staff's evaluation of the CE Owners Group emergency procedure guidelines to the CE Owners Group on April 16, 1985.
In accordance with PVNGS Unit 1 License Condition 2.C(ll)(a),
we hereby submit the APS schedule for revising the PVNGS plant specific technical guidelines (Procedures Generation Package) and emergency operating procedures.
By the submittal of the attached
- schedule, License Condition 2.C(11)(a) is closed.
7f60+>+ 850yg 0 850 R
PDo~g 050o0 PDR, i~
N
~,
~ o
- Mr. George M. Knighton Procedure Generation Package ANPP-32987 Page 2
~~
If you have any questions, please contact Mr. William quinn of my staff.
Very truly yours, E. E.
Van Brunt, Jr.
Executive Vice President Project Director EEVB/MAJ/slh Attachment cc:
E. A. Licitra R.
Zimmerman M. Goodman A. C. Gehr
~0
\\ ~
'e f
4
,R 4
Page 1 of 2 TIMETABLE FOR IMPLEMENTATION OF CEN-152 REV~ 02 INTO PVNGS EOP's
%his timetable was developed in response to Unit One Operating LLcense NPF-41 Condition 2.C(ll)(a). It is in accordance with NUREG-899, Section 6.2.4.
The dates listed on the timetable are based on the CEN-152 Revision 02 SER, which was issued April 16, 1985.
Week Number OBJECTIVE 9
10ll 12 Receipt of CEN-152 Revision 02 Safety Evaluation Report (SER) dated April 16, 1985 CEN-152 Rev.
02 final draft is compaxed to CEN-152, Rev.
01 to evaluate impact on plant specific technical guidelines.
Date due:
May 14, 1985 time involved:
4 weeks Emergency Procedure Technical Guidelines EPTG are revised using CEN-152 Rev.
02 and detailing plant specific information Date due:
June 11, 1985 time involved:
4 weeks Plant Specific EOPs are revised in accordance with the revised EPTGs.
Date due.'uly 9, 1985 time involved:
4 weeks 13 14 15 16 17 18 19 20 21 22 23 24 Verification of the Plant Specific EOPs.
Date due:
August 20, 1985 Validation of the Plant Specific EOPs Date due.'ctober 1, 1985 time involved:
6 weeks time involved:
6 weeks 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Plant Specific EOPs submitted for review and approval by the Plant Review Board (PRB).
Date due:
October 29, 1985 time involved:
4 weeks Plant Specific EOPs given to the Licensed Training Department and Training lesson plans are revised,to incorporate the revised EOPs.
Upon completion of approval 'of revised lesson plans, training will incorporate the revised lesson plans into the Licensed Operator requalification program which will involve both classroom instruction as well as simulator exercises.',
The, revised lesson plans willalso be implemented into the'advanced simulator course for license candidates.
Date due:
January 21, 1986 time involved:
12 weeks 0190K/0010K
et II It II d ll Ir I
Page 2 of 2 It will take 40 weeks or less to revise, rewrite, receive PRB approval, and retrain the licensed operators on the EOPs, that are based on CEN-152 Rev.
02.
Based on the above time schedule, the revised EOPs should be implemented January 21, 1986 or earlier.
~