ML17299A361
| ML17299A361 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/24/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-32709-EEVB, NUDOCS 8506130497 | |
| Download: ML17299A361 (2) | |
Text
Arizona Nuclear Poorer Project P.O. BOX 52034 o
PHOENIX, ARIZONA85072-2034 Mr. John Martin Office of Inspection and Enforcement Region V
U.
S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 ANPP-32709-E EVBJ r May 20, 1985
SUBJECT:
Certification of the Operability of all Required Systems for Initial Entry into Node 2'ocket No's.
STN-50-528 File:
85-056-026 G.1.01.10
Reference:
PVNGS Unit 1 Operating License, NPF-34
Dear Mr. Martin:
tS85HAY28 Nl2: Se REGtog9 g,F, As required by the Palo Verde Nuclear Generating S'tation Unit 1
Operating License, NPF-34, I am hereby certifying that Item l.a of Attachment 1 to the license has been completed for the initial entry into Mode 2.
The operability of systems required for Mode 2 has been demon-strated by successfully meeting the acceptance criteria in the PVNGS Technical Specifications.
This has been accomplished by the completion of the applicable surveillance tests or by pre-operational testing which verifies the meeting requirements of the Technical Specifications and which were performed within the required surveillance interval or by operability as demonstrated for Modes 3, 4, 5 and 6.
Very truly yours, EEVBJr/kid cc:
R.
Zimmerman A. Gehr E.
E.
Van Brunt, Jr.
Executive Vice President Project Director 850bi30497 850524 PDR ADOCK 05000M8 P
PDK
~
r