Confirms Completion of Physical Work & Testing Re Fire Protection Design Change Packages,Per Sser 7 (NUREG-0857)
ML17298C161
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/23/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0857, RTR-NUREG-857 ANPP-32704-EEVB, NUDOCS 8505280254
Download: ML17298C161 (5)


Text

REGULATOINFORMATION DISTRISUTION +STEM (RIDE)

ACCESSION NBR:8505280254 DOC ~ DATE: 85/05/23 NOTARIZED', NO FACIL::STN 50 528 Palo Verde Nuclear Stations Unit ii Arizona Publi Sf'N 50-529 Palo Verde Nuclear Stations Un)t 2'i Arizona Publi STN.50-530 Palo Verde Nuclear Stations Unit 3E Arizona Publi AUTH BYNAME AUTHOR AFFILIATION VAN BRUNTEE;ED Arizona Public, Service, Co ~

RECIP.NAME~

REClPIENT AFFlLIATION KNIGHTONEGGH~

Licensing Branch 3

SUBJECT:

Confirms completion of physical work 8 testing re. fire.

protection design change packagesEper SSER 7

(NUREG"0857) ~

'ISTRISUTI N CODE" AOD68 COPIES 'RECEIVED:LTR / 'NCL'IZEs:

'ITLE:

OR Submittal: Fire Protect1on NOTES:Standardized plant.

OL; 12/31/80 Standardized plant ~

Standardized plant ~

DOCKET ¹ 05000528 05000529 05000530 05000528 05000529 05000530 RECIPIENT ID CODE'/NAMEt NRR LB3 BC 01 INTERNAL: ACRS 11 ELD/HDS3 NRR HOLONICH 07 NRR/D CEB 09.

FIL'Q COPIES'TTR ENCL

~

RECIPIENT ID CODE/NAME>>

ADM/LFMB IE"s 'klHITNEYE L NRR HAMBACH 06 NRR/DL DIR RGN5s COPIES LTTR ENCL' 1

1 1

1 EXTERNAL: LPDR NSIC 03>>

05 NRC PDR 02 TOiTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL.

l tff x

~ X 4

f

)

y <<)

I) g f<<W f

)f

~ <<1 f 4>>f Xk 4

.~

xx C f 4

t) t'x ffh

~ Co f

xl xf f) f ',>>>>

x,)>> f,f o

') 1

<l

~

% f

'V f$

th co Ilirl P

fr, f< 4>> f <<>>Xftf I

q>>t) '1ft

) ~

txl tr Il illffhx)ll

~

ooo ooo

-, ~

'Cx I f I't f

~l)f

~ f I f:

x fII'l II l) k II o <<r f'>>f

~ f I)f ff>>

f>> tot s>>ff ]>>1

-Y'f f T

'XI<f ))

$ ti f

'f,

~ J II C

tl i" C>> f f It ">>

C, Jri

'f t o

Arizona Nuclear Power Project P.o. BOX 52034 o

PHOENIX, ARIZONA85072-2034 Director of Nuclear Reactor Regulation Mr. George W. Knighton, Chief Licensing Branch No.

3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555 ANPP-32704-EEVB/JKO May 23, 1985

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3

Docket Nos.

STN 50-528(License No. NPF-34)/529/530 Fire Protection Modifications and Compensatory Measures.

File:

85-056-026 G.l.01.10

Reference:

(1)

Letter from E. E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated March 29, 1985 (ANPP-32277);

Subject:

Fire Protection Modifications and Compensatory Measures.

(2)

NUREG-0857, Supplement 7, "Safety Evaluation Report Related to the Operation of Palo Verde Nuclear Generating Station, Units 1, 2,

and 3, dated December of 1984.

Dear Mr; Knighton:

The purpose of this letter is to confirm the status of the Design Change Packages (DCP's) related to fire protection that were discussed in the referenced letter.

Per the referenced letter, all the physical work and testing was to be completed prior to initial criticality.

The following DCP's, which were mentioned in the referenced letter, have been closed.

1SJ-EC-037 1SJ-RC-135 1SJ-HA-037 1SN-SS-024 1SE-PK-033 1SE-ZA-122 10E-HA-039 10M-QK-014 1SM-FP-127 10M-QK-017 10M-FP-124 1SA-FP-117 1SA-FP-104 All physical work and testing has been 1SJ-EW-025 1SJ-SI-144 1SJ-HJ-040 1SM-FP-123 1SJ-CH-190

'0M-DG-045 10J-SG-129 10E-RC-138 10M-FP-801 10M-QK-018 10M-FP-096 10M-FP-'133 1SA-FP-109 completed'or DCP 1SE-QD-'009.,

This letter confirms that physical work and testing has been completed prior to initial criticality for the Fire Protection related DCP's referenced in SER Supplement 7.

8505280254 850523 PDR ADDCK 05000528' PDR to

II ~,~

G.

M. Knighton Fire Protection Modifications and compensatory Measures

~ ANPP-32704 Page 2

Please contact Mr. W. F. Quinn of my staff if you have any questions regarding this information.

Very truly your E. E.

Van Brunt, Jr.