Notifies That Requirements of License Condition 2.C.6(C) for Mods to Itt Barton Transmitters & Valcor Solenoid Valves Satisfied
ML17298C160
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/23/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-32702-EEVB, NUDOCS 8505280200
Download: ML17298C160 (6)


Text

REGULAT INFORMATION DISTRIBUTION

'STEM (RIDS)

ACCESSION NBR:8505280200 DOC ~ DATE! 85/05/23 NOT'ARIZED!

NO FACIL!STN 50 528 Palo Verde Nuclear Stations Unit li Arizona Publi AUTH ~ NAME,

AUTHOR AFFILIATION VAN BRUNTrE.ED Arizona Public Service Co; RECIP ~ NAME>

RECIPIENT AFFILIATION KNIGHTON g G ~ I] ~

Licensing Branch 3

DOCKET ¹ 05000528 SUBJECT! Notifies that requirements of License Condition 2".CD 6'(c),for mods to-ITT Barton. Transmitters L Valcor solenoid valves satisfied, DISTRIBUTION "CODE!

A048D COPIES RECEIVED!LTR

(.'NCL 'IZE; TITLE': OR/Licensing Submittal:

Equipment~ Aualification NOTES!Standardized plant",

OL!12'/31/84'5000528 RECIPIENT'D CODE/NAME!

NRR LB3~ BC 12'OPIES LTTR ENCL~

RECIPIENT'D CODE/NAME<

LICITRA'g El 01 COPIES LTTR ENCL'NTERNAL; ACRS ELD/HDS3 GC NRR/DE/EQB NRR/DSI'/AEB RGN5

'15'2'3 07 8

1 1

1 ADM/LFMB ELD SHIELDS' NRR KARSCHgR NRR IR

  • 14 G FILE 04 f~

1 1

1 1 ~

EXTERNAL; LPDR NSIC 03~05'RC PDR 02' L

TOTAL NUMBER'F COPIES REQUIRED:

LTTR 24 ENCL

e

"~

e r

v

) ~ >

I e) I iI I

lg

)

II ee I

~

~

',,e

~ r I)

II lvv,i1'r)

I v))f rf v'l

~

) r) lr

')I

>f)lf <

ft f) e

)

v I,,

Aew'wee ee b\\

e eeo heal )i) r l'4 l)f rl 0

)I 4 I f I)"

A il f i

r e

v I ll

85p52 o pnppp528; p 85p523 PDR

@DOC PDR P

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No.

STN 50-528, License No. NPF-34

Subject:

License Condition 2.C.6(c)

File:

85-056-026'.1.01.10 Arizona Nuclear Power Project P.o. BOX 52034 4

PHOENIX, ARIZONA85072-2034 Director of Nuclear Reactor Regulation ANPP-"32702-EEY8/BJA Attention:

Mr. George W. Knighton, Chief May 23, 1985 Licensing Branch No.

3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

References:

(1)

NUREG-0857, Supplement No. 7, "Safety Evaluation Report Related to the Operation of Palo Verde Nuclear Generating Station, Units 1, 2, and 3," dated December of 1984.

(2)

Letter from E. E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated December 7,

1984 (ANPP-31379);

Subject:

PVNGS Environmental Qualification Program.

(3)

Letter from E. E.

Van Brunt, JR.,

ANPP, to G.

W. Knighton,

NRC, dated September 10, 1984 (ANPP-30476);

Subject:

PVNGS Environ-mental Qualification Program.

(4)

Letter from E. E.

Van Brunt, JR.,

ANPP, to G.

W. Knighton,

NRC, dated December 3,

1984 (ANPP-31297);

Subject:

PVNGS Environmental Qualification Program.

(5)

Letter from E. E.

Van Brunt, JR.,

ANPP, to G.

W. Knighton,

NRC, dated April 26, 1985 (ANPP-32503);

Subject:

License Condition 2.C.6(c).

Dear Mr. Knighton:

Reference (2) submitted a Justification for Interim Operation (JIO) for PVNGS Unit 1 in order to,complete the installation of environmentally qualified ITT Barton transmitters.

Accordingly, by the issuance of the Unit 1 Operating License, the NRC Staff has imposed license condition 2.C.6(c) for ANPP to complete modifications to the ITT Barton transmitters prior to initial criticality.

ANPP confirms that the modifications to the transmitters have been completed and these transmitters are now environmentally qualified for use at PVNGS in accordance with the provisions of 10 CFR 50.49.

Reference (3) submitted a JIO in order to complete the modifications to the Valcor Solenoid Valves.

Subsequently,'he NRC Staff has imposed license condition 2.C.6(c) for ANPP to complete the modifications to the Valcor Solenoid Valves prior to initial criticality.

ANPP has completed the modifications and these Solenoid Valves are now environmentally qualified for use at PVNGS in accordance with the provisions of 10 CFR 50.49.

Reference (4) submitted a JIO in order to finish the modifications to the two contain-ment sump resistance temperature detectors (RTDs).

The NRC Staff has imposed license condition 2.C.6(c) for ANPP to complete the modifications prior to initial criticality.

ANPP confirms that the subject modifications have been completed.

The containment sump RTDs are fully qualified for use at PVNGS in acordance with the provisions of 10 CFR 50.49.

P

,~a.

s

G.

W. Knighton Ip.cense Condition 2.C.6(c)

'NPP-32702 Page 2

I This submittal, in addition to the submittal of Reference (5), confirms that the requirements of License Condition 2.C.6(c) have been satisfied.

If you have any questions on this matter, please contact Mr. W. F. Quinn of my staff.

Very. truly ours CM~

E. E.

Van Brunt, Jr.

Executive Vice President Project Director EEVB/BJA/slh CC:

E.

A. Licitra H. Garg A. C. Gehr R.

P.

Zimmerman

L e;

L Fl