ML17298C120
| ML17298C120 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/20/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-32456-EEVB, NUDOCS 8505130435 | |
| Download: ML17298C120 (2) | |
Text
ere'>8~
$',Ãi Arizona Nuclear Povver Project a~e t,pg 23 Pl(
P.O. BOX 52034 4
PHOENIX, ARIZONA85072-2034 qEtlIO><~"~'"'r.
John Martin Office of Inspection and Enforcement Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 walnut Creek, California 94596
SUBJECT:
Certification of the Operability of all Required Systems for Initial Entry into Mode 4 Docket Nos.
STN-50-528 File: 85-056-026; G.1.01.10 April 20, 1985 ANPP-32456 EEVBJr
Reference:
PVNGS Unit 1 Operating License, NPF-34
Dear Nr. Martin:
As required by the Palo Verde Nuclear Generating Unit 1 Operating
- License, NPF-34, I am hereby certifying that item l.a of Attachment 1 to the license has been completed for the intial entry into Node 4.
The operability of systems required for Mode 4 has been demonstrated by successfully meeting the acceptance criteria in the PVNGS Technical Specifications.
This has been accomplished by the completion of the applicable surveillance tests or by pre-operational testing which verifies the meeting requirements of the Technical Specifications and which were performed within the required surveillance interval or by operability as demonstrated for Modes 5 and 6.
Very truly yours, 8505130435 850420 PDR ADOCK 05000528 P
PDR EEVBJr/bg cc:
R.
Zimmerman A. Gehr ZZV~~~~
E.
E.
Van Brunt, Jr.
Executive Vice President Project Director
~eg
/I I'I