ML17298C116
| ML17298C116 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/29/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Martin J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-32504-EEVB, NUDOCS 8505130371 | |
| Download: ML17298C116 (2) | |
Text
Arizona Nuclear Power Project",,
P.O. BOX 52034 o
PHOENIX. ARIZONA85072-2034
~ jj/f lI,'t'f3 ANPP-32504"EEVBJr April 29, 1985 I
Mr. John Martin Office of Inspection and Enforcement Region V
U.
S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, California 94596
SUBJECT:
Certification of the Operability of all Required Systems for Initial Entry into Mode 3
Docket Nos.
STN-50-528 File:
85-056-026 '.1.01.10
Reference:
PVNGS Unit 1 Operating License, NPF-34
Dear Mr. Martin:
As required by the Palo Verde Nuclear Generating Station Unit 1
Operating
- License, NPF-34, I
am hereby certifying that Item l.a of Attachment 1
to the license has been completed for the initial entry into Mode 3.
The operability of systems required for Mode 3
has been demonstrated by successfully meeting the acceptance criteria in the PVNGS Technical Specifications.
This has been accomplished by the completion of the applicable surveillance tests or by preoperational testing which verifies the meeting requirements of the Technical Specifications and which were performed within the required surveillance interval or by operability as demonstrated for Modes 4, 5 and 6.
Very truly yours, 8505i3037i 850429 PDR ADOCK 05000528 P
PDR E. E.
Van Brunt, Jr.
Executive Vice President Project Director EEVBJr/jdf cc:
R, Zimmerman A. Gehr
i