ML17298C105
| ML17298C105 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/30/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Thompson H Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8505060108 | |
| Download: ML17298C105 (2) | |
Text
APR 30
)gg5-MEMORANDUM FOR:
Hugh L. Thompson, Jr., Director Division of I,icensing, NRR FROM:
Dennis F. Kirsch, Acting Director Division of Reactor Safety and Projects Region V
SUBJECT:
Palo Verde Unit 1 Full Power License Region V has completed its,review of the draft full power license.
Please include the following items as Attachment 1 to the full power license:
1.
Surveillance Pro ram Prior to entering Mode 1 for the first time, APS shall a
~
b.
Have completed a review of the surveillance procedures applicable to the change of mode, and determined that the procedures demonstrate the operability of the required systems with respect to all acceptance, criteria defined in the Technical Specifications'.'ave dispatched written notification to the NRC Regional Administrator, Region V, that the action defined in (a) above has been completed for Mode 1.
This completes our review of the full power license.
D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Region V bcc:
RSB/Document Control Desk (RIDS)
Mr. Martin Resident Inspector RV: az C. Sorensen 4/So /85 L. Miller 4/'/85 au4-A, Chaffee 4/gy /85 D. Kirsch 4/ 89 /85 85050b0108 pDR ADaCK P
8@0+30 05000S28 pDR