ML17298C086

From kanterella
Jump to navigation Jump to search
Discusses Revised Chapter 15 Analyses Per License Condition 2.C(21).Proposed Changes Will Be Reviewed Considering as-built Configuration & Impact on Chapter 15 Analyses. Revised Program Will Be Implemented by 850701
ML17298C086
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/23/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-32465-EEVB, NUDOCS 8504290337
Download: ML17298C086 (3)


Text

REGULATOR1 INFORMATION DISTRIBUTION 4ITEM (RIBS)

ACCESSION NBR: 850 4290337 DOC ~ DATE! 85/00/23 NOTARIZED; NO DOCKEIT' FAG IL;STN 50~528 Palo Ve'rde Nuclear Stationr Unit 1i Arizona Publ-f 05000528 STN 50 529 Palo Verde Nuclear Stations Unit 2'r Arizona Publi 05000529 STN 50 530 Palo Verde Nuclear Stations Uni:t 3r Arizona Publi" 05000530 BYNAME AUTH AUTHOR AFFILIATION VAN BRUNTtE'BE ~ Arizona Public Service Co.

REC IP ~ NAME RECIPIENT AFFILIATION KNIGHTONrG ~ lf ~ Licensing Branch 3

SUBJECT:

- Discusses revised Chapter 15 analyses per License Condition 2.C921),Proposed changes will be~ reviewed considering, as built" configuration 8 impact on Chapter 15 analyses, Revised program will be implemented by 850701 CODE-t B021D COPIES RECEIVED:LTR ENCL 'ISTRIBUTION

'IZE'o TITLE: OR/Licensing Submittal: Combined General Distr fbutfon NOTES!Standardized plant; 05000528 OL'2/31/84 Standardized plant. 05000529 Standardized plant". 05000530 R~CI~IENT COPIES RECIPIENT COPIES ID CODE/NAME" LTTR ENCL ID CODE/NAME LTTR'NCL<

NRR LB3 BC 05 NRR LB3 LA LICITRAgE 01 INTERNAL! ACRS 29 8 ADM/LFMB ELD/HDS3 1 NRR/DE/CEB 09 NRR/DE/MTEB NRR/DHFS DEPY12 NRR/DHFS/HFEB16 1 NRR/DHFS/LQB NRR/DL D IR 1 NRR/DL/ORAB NRR/DL/SSPB 1 NRR/DS I/ADRS NRR/DSI/AEB 28 1 NRR/DSI/CPB 11 NRR/DSI/CSB 10 1 NRR'/DSI/ICSB 18 NRR/DSI/METB 13I 1' NRR/D PSB 21 NRR/DSI/RSB 25; E 04 RGN5 1 R IB EXTERNAL: LPDR 03 NRC PDR 02" NSIC 06 PNL GRUEL'rR TOTAL NUMBER OF COPIES REQUIREDB LTTR 36 ENCL

N 4

V

~V

~ II Vlj 4'r, I fr<< sir

}

\ P,I Jr ) "rr<< f 4 v) rl i. ~ 'ir f~ I V j v 'I ll

,<<rl l f Irl I r rv

'gtf <<<< n

~ <<<<fi }I r'li, f if ft

'l ~ ~

rI VV I

1 4 i ~

'l r 4 <<I'41 V

I x"

r *4

Arizona Nuclear Power Project P.o. BOX 52034,o PHOENIX. ARIZONA85072-2034 Director of Nuclear Reactor Regulation ANPP-32)65-EEVB/KLM Attention: Mr. George W. Knighton, Chief April 23,'985 "

Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Revised Chapter 15 Analyses Additional Information Docket Nos. STN 50-528(License No. NPF-34)/529/530 File: 85-056-026 G.1.01.10

Reference:

Letter t;o G. W. Knighton, NRC, from E. E. Van Brunt, Jr., ANPP, dated April 15, 1985;

Subject:

Revised Chapter 15 Analyses (ANPP-32401).

Dear Mr. Knighton:

During discussions with members of your staff on License Condition 2.C(21), Revised Chapter 15 Analyses, interest was expressed regarding future proposed changes to PVNGS which may impact License Condition 2.C(21) Category 3 events and those Category 4b events that ANPP will not reanalyze for License Condition 2.C(21).

These events are listed in the above reference letter.

The program for the review of proposed changes to PVNGS is being revised.,

In the revised program, proposed changes will be reviewed considering the as-built configuration and the potential impact on the Chapter 15 analyses. The revised program will be implemented by July 1, 1985.

Please contact Mr. W. F. quinn of my staff if you have any questions on this matter.

Very truly yours, E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/KLM/mb cc: E. A. Licitra R. P. Zimmerman A. C. Gehr 8504290337 850423 PDR ADOCK 05000528 P PDR