Forwards Remaining Responses to NRC 840529 Request for Addl Info Re Operating Shift Advisors.Info Re Training Program, Medical Qualification Requirements & Oral & Written Exams Encl
ML17298C065
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/19/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Thompson H
Office of Nuclear Reactor Regulation
References
ANPP-32452-EEVB, NUDOCS 8504250274
Download: ML17298C065 (9)


Text

I REGULATOR NFORMATION DISTRIBUTION S "TEM (RIDS) la Ac'CESSION NBR; 8504250274 DOC DATE: 85/04/19 NOTARIZED; NO DOCKET 0 FACIL:STN-50 AUTH BYNAME

~

528 Palo Verde Nuclear Stations AUTHOR AFFILIATION Unit ii Arizona Publi 05000528 VAN BRUNTiE.E ~ Ar izona Publ ic Service Co.

RECIP ~ NAME RECIPIENT AFFILIATION THOMPSON~H ~ L, Division of Licensing

SUBJECT:

Forwards remaining responses to NRC 840529 requests for addi info re operating shift advisors. Info re train)ng program~

medical qualification requirements 8, oral L written exams COPIES RECEIVED:LTR encl'ISTRIBUTION CODE: M003D Oper ator Requalification Program ENCL'ITLE:

NOTES:Standardized plant. 05000528 OL e 12/31/84

, RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR LB3 Bc 1 1 LIC ITRA g E 1~

INTERNAL: ACRS 08 10 1O NRR/0 /LQB 1 1 NRR/DHFS/OLB 01 2 2 G 04 1 1 RGN5, 1 1 EXTERNAL: LPDR 03 1 1 NRC PDR 02 NSIC 05 1 1 TOTAL NUMBER OF COPIES REuUIRED: LTTR 2O ENCL 2O

r ~

t Il r s

~ h n sy I 1 ) $

' 4

)f l1 f F

~

4 . w y

}< 4 ]II e l l k

Arizona Nuclear Povver Project P.o. BOX 52034 e PHOENIX, ARIZONA85072-2034 Mr. H. L. Thompson, Director ANPP-32452-EEVB/MFQ Division of Licensing April 19, 1985 U.S. Nuclear Regulatory Commission Phillips Building 7920 Norfolk Avenue Bethesda, MD 20814

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528, License No. NPF-34 Operating Shift Staffing for PVNGS; Shift Advisors for Unit 1 File: 85-001-702 85-056-026

References:

(1) Letter from D. G. Eisenhut, NRC, to E. E. Van Brunt, Jr., APS, dated May 29, 1984;

Subject:

Operating Shift Staffing for Palo Verde Plant.

(2) Letter from E. E. Van Brunt, Jr. to H. L. Thompson, NRC, (ANPP-32198), dated March 21, 1985;

Subject:

Operating Shift Staffing for PVNGS; Shift Advisors for Unit 1.

Dear Mr. Thompson:

of the NRC letter dated May 29, 1984 (Reference 1) provided 8 NRC information requests to be provided if shift advisors were to be used on PVNGS (Refer to Attachment A). Our responses to the NRC requests Nos. 1 through 3 were previously provided in our March 21, 1985 letter (Reference 2). The purpose of this letter is to provide the remaining responses to NRC requests Nos. 4 through

8. The responses to NRC requests Nos. 4 through 8 are hereby provided in Attachment B. Supplemental information for responses 4 through 8 are provided in Attachments C and D.

If you should have any further questions or require additional information, please call Mr. Todd Bloom of my staff at (602) 943-7200, extension 4159.

Very truly ours E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/TJB/mb Attachments: A,B cc: A. C. Gehr (w/a A,B)

E. A. Licitra (w/a A,B)

R. P. Zimmerman (w/a A,B)

R. J. Pate (w/a A,B)

L. P. Crocker (w/a A through D) 8504250274 850419 PDR ADDCK 05000528 V PDR

ANPB-32452 ATTACHMENT A INFORMATION RE UIRED REGARDING SHIFT ADVISORS

l. A resume of each shift advisor which highlights his previous operating experience.
2. A copy of the procedure which describes the duties and authority of the shift advisors and the working relationships between the advisors and the operating shift personnel.
3. A copy of the training program presented to the shift advisors to assure they have adequate knowledge of plant specific matters to properly perform their duties.
4. A copy of the written examination administered to the shift advisors and the results of the examination, if available.
5. A description of, and copies of notes'regarding, the oral examination adminis-tered to the shift advisors.
6. A description of the training program presented to the operating shift crews to assure that they understand the role of the shift advisors.
7. A statement regarding the medical qualification requirements for the shift advisors.
8. A description of the procedures that will be used to evaluate the performance of the shift advisors during plant start-up.

ANPR-32452 ATTACHMENT B

4. A copy of the written examination administered to the shift advisors and the results of the examination, if available.

ANPP RESPONSE:

As identified in Attachment 3 to Reference 2 of the cover letter, three weekly written examinations are being administered. The written examination results were as follows:

Week One Week Two Week Three Mr. Jose Garza 97/100 91.9/100 89.2/100 Mr. Lloyd Briner 93/100 95.2/100 91.8/100 Attachment C provides one copy of each examination plus one copy of each examination with an answer key.

NRC RE UEST:

5. A description of, and copies of notes regarding, the oral examination administered to the shift advisors.

ANPP RESPONSE:

As identified in Reference 2 of the cover letter, the Shift Advisor 'Training Program consists of weekly written examinations (total of three) and several simulator evaluations. Based on the foregoing, no oral examination i's planned for inclusion in'the training program. However, we have provided a copy of the Shift Advisor PVNGS Simulator Evaluation Report Form as Attachment D for your information.

+

r(

k

' Attachment B ANPP- 32452 Page 2 NRC RE UEST:

6. A description of the training program presented to the operating shift crews to assure that they understand the role of the shift advisors.

ANPP RESPONSE:

The training program for the operating shift crews is currently being conducted during Session 3 of the Requalification Program and consists of the following:

(1) Each operator will read the Operating Department Guideline (ODG-37),

"Responsibilities and Duties of the Shift Advisor" which was provided to you as Attachment 2 of Reference 2 of the cover letter.

(2) Upper Level PVNGS Operations Management will present their views on the use of shift advisors to the operating crews.

(3) A question and answer session will be provided for the operators by upper Operations Management to discuss any questions/concerns regarding this topic.

This training will be completed prior to initial criticality for all currently Licensed Operators. The training for the shift crew which will utilize the shift advisor has been completed and documented on briefing forms.

l NRC RE UEST:

7. A statement regarding the medical qualification requirements for the shift advisors.

ANPP RESPONSE:

As noted in Reference 2 of the cover letter, both shift advisor candidates are currently licensed operators at San Onofre Nuclear Generating Station (SONGS) and as such, they have provided the required medical information to the NRC pursuant to 10 CFR 55.33(a)(6). In addition, any significant changes in their physical condition must be reported to the NRC by SONGS in accordance with 10 CFR 55.11(a)(1). Therefore, we believe that appro-priate medical qualification requirements will be maintained during their involvement at PVNGS.

~ iv

'l t

P

A'ttachment B ANPP- 32452 Page 3 NRC RE UEST:

8. A description of the procedures that will be used to evaluate the performance of the shift advisors during plant start-up.

ANPP RESPONSE:

Based upon the fact that the two shift advisor candidates are previously licensed operators, will have successfully completed the PVNGS Shift Advisor Training Course, and are to be used in an advisory capacity rather than in a performance based will be position, it has been determined that no performance evaluations required beyond those necessary to demonstrate initial qualification for the position. *