APPENDIX A NOTICE OF VIOLATION Arizona Public Service Company
-,.>,P.
O. Box 21666
.';"Phoenix, Arizona, 85036 Docket Nos. 50-528 and 50-,529 NRC License No. NPF-34 and Construction PeraxLt No.
142 As a result of the inspection conducted on December 1,
1984 - January 31,
- 1985, and in accordance with NRC Enforcement Policy, 10 CFR Part 2, Appendix C, the following violation was identified:
10 CFR 50, Appendix B, Criterion V, as implemented by Section 17 of the FSAR, states in part that, "Activities affecting quality shall be prescribed by documented instructions, procedures or drawings...
and shall be accomplished in accordance with these instructions, procedures or drawings."
CTI-Nuclear Drawing No.
10407-M721B-582-4, Section 11.1, Sketch No.
31254, Revision K, calls out (in Detail No. 5) full penetration welds on stiffener connections located on the Control Room Essential Air Handling Units, and, in Section No. AA, calls for full penetration welds on the plate to plate welds of the same units.
Contrary to the above, the stiffener connections on the Air Handling Units for Units Nos.
1 and 2, did not have full penetration
- welds, as required.
Additionally, portions of the required full penetration plate-to-plate welds on Air Handling Unit No. 2-M-HJA-F04 (Unit No. 2) were not fully welded in some areas.
The plate-to-plate welds on 2-M-HJA-F04 were not fully welded for a total of 6 inches on the top north side and 4 inches on the top south side of the unit.
All welding identified above was inspected and accepted by equality Control Inspectors of the Waldinger Corporation (TWC) for Unit No.
1, on October 12,
- 1982, and for Unit No.',
on or before October 3, 1979.
This is a Severity Ievel IV Violation (Supplement II).
Pursuant to the provisions of 10 CFR 2.201, Arizona Public Service
- Company, is hereby required to submit to this office within thirty days of the date of this Notice, a written statement of explanation in reply, including: (1) the corrective steps which have been taken and the results achieved:
(2) corrective steps which will be taken to avoid further items of noncompliance; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause
.shown.
BAR 22 l985 Dated Reactor Projects Section No.
2 880 PD 4110499 850322 I
GDR ADOCK 05000528 PDR
It