Forwards Revised Draft FSAR Section 1.1.5 Changing Latest Schedule for Licensing of Facility.Unit 2 Scheduled to Receive OL by Dec 1985 & Unit 3 by Dec 1986
ML17298C007
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/28/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-32266-EEVB, NUDOCS 8504050259
Download: ML17298C007 (6)


Text

REGULATO INFORMATION DISTRIBUTION TEM (RIDS)

'AGCESSION>> NBR 8504050259.

DOC ~ DATE' '85/03/28 NOTAR'IZED NO FACIL~ STN.50>>,528-Palo Verde Nuclei>>> Stationi Uni.t 1~ 'Ar)zona

'STN",50 529 -Palo Ye(de Nuclear>> Stations Uni~t 2~ Arizona

'STN 50-530 '-Palo Verde Nuclear>>'Stations Unit 3~, Arizona AUTH" NAME',

AUTHOR AFFILIATION VAN BRUNT'i<~eEe Ar i zona~ Publ i c Ser vice)'Co ~

'RECIP ~ NAMEl RECIPIENT AFFILIATION KNIGHTONp G ~ N ~

Licensing Branch "3 DOCKEiT> 0 Publi 05000528 Publi 05000529 Publi 05000530 SUBJEGT':; For wards>> re'vised dr af t" /SAR 'Section 1,1.5= changing latest>>

schedule~.for licensing of facility~ Units 2'cheduled~ to receive)

OL" by Dec= 1985" 8 Uni;t 3'by Dec

1986, DISTRIBUT'ION.CODE ~ 'B021D-COPIES >>RECEIVED!LTR "ENC SIZE'ITLE

'R/Licensing SUbmittal: Combined'ene'ral'istr ibution NOTES:Standar'dized pl-ant+

OL 12/31/84 "Standardized planto "Standardized

>>plant ~

05000528 05000529 05000530 RECIPIENT>

ID"CODE/NAMEl NRR< LB3 BC 05<

LICITRAgEl 01>>

INTERNAL', ACRS

'29.

ELD/HDS3>>

NRR/DE/MTEBi NRR/DHFS/HFEB16'RR~/DL'IR NRR/DL'/SSPB NRR'/D8I~/AE8'8 NRR/DSI/CSB'0, NRR/DSI'/METB-13>>

.NRR/DS I'/RSB 25>>

RGN5 8

1>>

1>>

1>>

,1v 1

1~

.1 1c 1

1 8

0 1

1 0

s0 1

1 1

1 1

>>COPIES'TTR 'ENCL>>

fv 1

1 REC IP IENT'ID'"CODE/NAME>>

NRR~ LB3 LA

'ADM/LFMB NRR/DE/CEB'9'RR/DHFS,DEPY12>>

NRR/DHFS/LQB NRR/DL/ORAB" NRR/DSI'/ADRS NRR/DSI/GPB 11-.

NRR/DSI/ICSB 18 NRR/DSI/PSB "21 G

F 04'M/DDAMI/MI B

',COPIES'TTR ENCL'1 0

1-0.fi 1-1>>

1 1

0, 1

0.

1 1"

1 1

1 1~

1 0'XTERNALS L'PDR NSI'C 03<06'RC "PDR PNL'RUEL'g'R 02' 1-1 1~

'TOiTAL" NUMBER< OF>>COPIES" REQUIRED:" L'TT~R 36'NCL>>

28

II

~

~

'I I

k t,

1 yg v.

7

~f M

~

N T

A

Arizona Nuclear Power Project P.o. 8OX 52034 e

PHOENIX, ARIZONA85072-2034 ANPP-32266-EEVB/WFQ March 28, 1985 Dixector of Nuclear Reactor Regulation Mr. George W. Knighton, Chief Licensing Branch No.

3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3

Docket Nos.

STN 50-528(License No. NPF-34)/529/530 PVNGS Units 2 and 3 Schedule File: 85-056-026 G.1.01.10

Reference:

(1)

Letter from E. E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated March 26, 1984 (ANPP-29155);

Subject:

Palo Verde Schedules.

(2)

Federal Register Notice, Volume 49, No. 243, page

49006, dated December 17, 1984.

Dear Mr. Knighton:

This letter is provided to confirm our present licensing schedules=for PVNGS Units 2 and 3.

ANPP has scheduled PVNGS Unit 2 to receive an operating license in the last quarter (October 1 to December

31) of 1985 and firm power operation is scheduled for the second quarter (April 1 to June
30) of 1986.

This Unit 2

schedule, including the built-in contingency, is consistent with references 1 and 2.

ANPP has scheduled PVNGS Unit 3 to receive an operating license in the last quarter (October 1 to December

31) of l986 and firm power operation is scheduled for the second quarter (April 1 to June 30) of 1987.

This Unit 3 schedule, including the built-in contingency, supercedes reference 1.

Attached is a draft FSAR section 1.1.5 change reflecting the latest schedules for Units 1, 2, and 3.

Please contact me if you have any questions.

Very truly yours, E. E.

Van Brunt, Jr.

Executive Vice President Project Director EEVB/WFQ/mb cc:

E. A. Licitra R. P.

Zimmerman A. C. Gehr PDR

  • DOCK 0500 F'

>pe Plt C

4 1

PVNGS FSAR INTRODUCTION AND GENERAL DESCRIPTION OF PLANT 1.1.3 CONTAINMENT TYPE The containment for each unit is a single containment system consisting of a steel-lined, prestressed

concrete, cylindrical lt structure, with a hemispherical dome.

The containment. struc-tures are designed by Bechtel Power Corporation (Bechtel).

1.1.4 THERMAL POWER LEVELS AND ELECTRICAL OUTPUT The rated core -thermal power level at which each NSSS will be operated is 3800 MWt plus 17 MWt net of heat from nonreactor

sources, primarily pump heat, for a total of 3817 MWt for each unit,.

The turbine generator electrical output for 3817 MWT is 1304 MWe at. 3.5 in. Hg abs backpressure.

The nominal net output of eacn unit is 1270 MWe.

1.1.5 SCHEDULED COMPLETION AND COMMERCIAL OPERATION DATES

  • The scheduled completion or fuel loading dates and the scheduled commercial operation dates for PVNGS Units 1,2, and 3 are.as follows:

Scheduled Commercjg) 0 eration Date PVNGS Unit Not lat'er than v~~~ 1985 OLl'.e ia boa Not later than 1986 50a) t Not later than June 1987 Scheduled Completion or Dat.es Or aa.hitWa. Lated@,

I ih eeot later than

,<@~~her 1985 ban,a~hew 3

Not later than neae~ae.

)QSI a.

ANPP terminology is firm power-operation date in lieu of

,commercial operation date.

Amendment 13 1.1-4 August 1984

.l

+, ~.

qgP C

QC 1<