Provides Status Rept on Sser 7 Re Fire protection-related Design Change Packages Under 10CFR50,App R.Mods Scheduled for Completion by 850401
ML17298B990
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/29/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-32277EEVB, NUDOCS 8504010194
Download: ML17298B990 (8)


Text

REAULATO INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSIOA NBR; 8504010194 DOC ~ DATE: 85/03/29 NOTARIZED:

NO FACIL:STN~50 528 Palo Verde Nuclear Station~

Unjt i~ Arizona Publi STN 50 529 Palo Verde Nuclear Station~

Unit 2i Arizona Publ.i STN 50. 530 Palo Verde, Nuclear Stations. Uni;t 3g Arizona Publi AUTH',NAME AUTHOR AFFILIATION VAN BRUNTiE;E, Arizona-Publ'ic Service Co.

RECIP ~ NAME>>

RECIPIENT AFFILIATION KNIGHTONg G ~ H ~

Licensing Branch "3

SUBJECT:

Provides status rept on SSER 7 ref fire protection related design change packages under 10CFR50~App Rimods scheduled for completion by 850401 '

DISTRIBUTION CODE: A006D,COPIES RECEIVED!LTR ENCL~

'SIZE TITLE; OR Submittal! Fire Protection NOTES:Standardized plant.

OL: 12/31/84 Standardized plant; Standardized plant.

DOCKE>>T" 0 OSOOOS28 05000529 05000530 05000528 OSOO0529 05000530 REC IP IENT ID CODE/NAME NRR LB3 BC 01 INTERNAL: ACRS 11 ELD/HDS3 NRR HOLONICH 07 NR 09 E

FI 04 COPIES LTTR ENCL'N 3

1 2

2-1 RECIPIENT ID CODE/NAME ADM/LFMB IE, NHITNE'fg L NRR WAMBACH 06 NRR/DL D IR RGN5-COPIES LTTR ENCL>>

1 1

1 1

1 EXTERNAL: LPDR NSIC 03<<

05 NRC POR 02 1

1 TOTAL NUMBER'" OF COP IES REQUIRED ~

LTTR 20 ENCL"

O

~ F

Arizona Nuclear Power Project P.O. BOX 52034 e

PHOENIX, ARIZONA85072-2034 ANPP-32277-EEVB/WFQ March 29, 1985 Director of Nuclear Reactor Regulat3.on Mr. George W. Knighton, Chief Licensing Branch No.

3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3

Docket Nos.

STN 50-528(License No. NPF-34)/529/530 Fire Protection Modifications and Compensatory Measures.

File: 85-056-026.

G.1.01.10

References:

(1)

(2)

(3)

(4)

(5)

Letter from E. E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated October 2, 1984 (ANPP-30709);

Subject:

Fire Protection Modifications and Compensatory Measures.

Letter from E. E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated November 13, 1984 (ANPP-31101);

Subject:

10 CFR 50, Appendix R, Spurious Actuation Analysis.

Letter from E. E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton, NRC dated November 21, 1984 (ANPP-31195).

Letter from E. E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated December 5, 1984 (ANPP-31335).

SER Supplement No. 7.

Dear Mr. Knighton:

This will confirm D. K. Neal's March 27 and 28, 1985 telephone coversations with Messrs.

E. A. Licitra and D. J. Kubicki.

SER Supplement No.

7 references a number of fire protection related Design Change Packages (DCP's) mostly related to 10 CFR 50 Appendix R.

These were scheduled to be completed by April 1, 1985.

There are seven such areas of reference in Supplement No.

7 outlined below.

Following is a status report on these modifications:

1.

SER Supplement No. 7, Page 9-3 Water Supply System, second paragraph, "to add an indicating-type valve and piping that will isolate the hose stations on elevation 120 ft and 140 ft so that a single break will not interrupt primary and secondary fire suppression systems."

This was done with DCP 10M-FP-801 and is complete (Reference 4).

2.

Page 9-6, Fire Detection System, third paragraph, "committed to install additional fire detectors above suspended ceilings in the computer room (Zone 16) and in the Auxiliary Building laboratory rooms (Zones 57A and 57K) before April 1, 1985."

This is being done under DCP's 10M-QK-017 and 10M-QK-018.

These have been installed and are being tested.

Final tests are expected to be complete and the detectors in service by April 15, l985 or prior to initial criticality.

8504010l94 850329 PDR ADOCK 05000528 F

PDR

C

"~'

i C

.l

Mr. George W. Knighton Fire Protection Modifications and Compensatory Measures ANPP-32277 Page 2

3.

Page 9-9, first paragraph, "to install automatic Halon fire suppression systems in each of these rooms (Zones 10A and lOB) by April 1, 1985."

This is being done under DCP 10M-FP-124.

Final acceptance tests are being conducted and the systems are expected to be in service by April 15, 1985 or prior to initial critic'ality.

Page 9-9, third paragraph, "modifications will be implemented to improve the integrity of certain existing fire barriers so as to satisfy staff concerns."

This is being done under DCP's 10M-FP-096, 1SA-FP-104 which are expected to be completed by April 15, 1985 or prior to initial criticality and by DCP 1SA-FP-109 which is complete.

5.

Page 9-9, fourth paragraph, "the structural steel which supports the floor of Fire Area XVII (auxiliary building) will be protected by a fireproofing material that is l-hour fire rated."

This was done under DCP 1SA-FP-117 and is complete.

6.

Page 9-10, last paragraph, "For two other doors (J208 and J408),

the applicant has committed to install local sprinkler protection to protect the doors in the event of a significant, fire.",.This was done under DCP 10M-FP-133.

Installation and testing is complete and the sprinklers are now in service.

7.

Page 9-16, fifth paragraph, "As a further result of the spurious actua-tion and associated circuit analyses, the applicant committed to implement a number of modifications to satisfy the staff's guidelines or to mitigate staff concerns.

These commitments are contained in letters dated October 2, 1984 (Reference 1),

November 13, 1984 (Reference 2),

and November 21, 1984 (Reference 3).

These are being done under the following DCP's:

(Refer to the above letters for a description of each DCP).

DCP

Status, 1SJ-EC-037 1SJ-EW-025 1SJ-RC-135 1SJ-SI-144 1SJ-HA-037 1SJ-HJ-040 Complete.

Complete.

All physical work and testing complete.

All physical work and testing complete.

All physical work and testing complete.

All physical work and testing to be completed by 4/15/85 or prior to initial criticality.

~r

~ ii

Mr. Ceorge W. Knighton, Fire Protection Modificati>>s and Compensatory Measures ANPP-32277 Page 3

1SN-SS-024 All physical work and,testing to be completed by 4/15/85 or prior to initial criticality.

1SM-FP-123 1SE-QD-009 1SE-PK-033 1S J-'CH-190

/

1SE-'ZA-122 J Complete.

All physical work and testing to be completed prior to initial criticality.

All physical work and testing to be completed by 4/15/85 or prior to initial criticality.

All physical work arid testing complete.

All physical work and testing complete.

10M-DG-045 All physical work and testing complete.

lOE-HA-039 All physical work and testing complete.

i K

10J-SG-'129 All physical work and testing to be completed by 4/15/85 or prior to initial criticality.

10M-QK-014 10E-RC-138 1SM-FP-127 All physical work and testing to be completed by 4/15/85 or prior to initial criticality.

All physical work and'testing complete.

Complete.

For the above DCP's which are still in work, the compensatory measures described in the referenced letters consisting of an hourly fire watch patrol will remain in effect in these areas until all physical work and testing of the DCP is complete.

All of the fire protection related DCP's referenced herein which are not already completed are scheduled to have all physical work and testing completed prior to initial criticality.

We are proceeding as indicated.

Please let me know if you have any questions on this information.

Very truly yours, EEVB/DKN/mb E. E.

Van Brunt, Jr.

Executive Vice President Project Director cc:

E. A. Licitra D. J. Kubicki A. C. Gehr R. P.

Zimmerman

C