Requests Confirmation of Interpretation of 10CFR50.59 Re Making Changes,Tests or Experiments Not Described in SAR W/O Prior NRC Approval If Change Does Not Involve Unreviewed Safety Questions or Require Tech Spec Change
ML17298B959
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/12/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-32126-EEVB, NUDOCS 8503180265
Download: ML17298B959 (4)


Text

REGULATOh.

INFORMATION DISTRIBUTION TEM (BIDS)

ACCESSION NBR:850 FAC IL;STN~50~528 STN 50 529 STN 50 530 AUTH,NAME VAN BRUNT<E',E, REC IP, NAME~

KNIGHTONg G ~ kl ~

3180265, DOC ~ DATE; 85/03/12 NOTARI'ZED; NO Palo Verde Nuclear Station~

Un)t i~ Arizona Publi Palo Verde Nuclear Stations Unit 2i Arizona Publi Palo Verde Nuclear Station~

Unnt 3i Arizona Pub'li AUTHOR AFFILIATION Arizona Public Service Co.

RECIPIENT AFFILIATION l.icensing Branch 3

DOCKETi 0 05000528 05000529 05000530

SUBJECT:

Requests confirmation of interpretation of 10CFR50

~ 59 re making, changesgtests or-experiments not:- described in SAR x/o prior NRC approval if change-does not involve'nre'vjelNed safety questions-or-require Tech Spec change<

DISTRIBUTION CODE':

A001D COPIES RECEIVED!LTR

'NCL

'IZE'e TITLE:

OR Submittal; General Distribution NOTES;Standardized plant; OL 12/31/84 Standardized planto Standardized plant/

05000528 05000529 05000530 RECIPIENT ID CODE/NAME:

NRR LB3= BC 01.

INTERNAI.

ACRS 09 EI.D/HDS3 NRR/DL DIR NRR/DL/TSRG NRR/DSI/RAB RGN5 COPIES LTTR ENCL 6

1 1

1-1 1

RECIPIENT ID CODE/NAME ADM/I FMB NRR/DE/MTEB NRR/DI./ORAB-I/METB EG FIL

- 04 COPIES L~TiTR ENCL~

1 1

1 1

1-EXTERNAl; LPDR NSIC 03.

05 NRC'DR'2' TOTAI. NUMBER OF COPIES REQUIRED:

LTTR 26 ENCL 3

0 H

y I

Arizona Nudear Power Project P.o. BOX 52034 4

PHOENIX, ARIZONA85072-2034 ANPP-32126-EEVB/WFQ March 12, 1985 Director of Nuclear Reactor Regulation Mr. George W. Knighton, Chief Licensing Branch No.

3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3

Request for Interpretation of 10 CFR 50.59 Docket Nos.

STN 50-528(License No. NPF-34)/529/530 File: 85-56-026

Dear Mr. Knighton:

Pursuant to 10 CFR 50.59, "Changes, tests and experiments",

each holder of an operating license may make changes in the facility and/or procedures as described in the safety analysis report, or conduct tests or experiments not described in the safety analysis report, without prior Commission approval, if the change does not involve an unreviewed safety question (on the basis of a written safety evalua-tion) or require a technical specification change.

In keeping with this philosophy, we believe that if a change is determined not to involve a change to the facility or procedures as described in the safety analysis report, or tests or experiments to be conducted are determined to have been described in the safety analysis report, and a change to technical specifications is not required, a written safety evalua-tion is not required.

Basis for this opinion is contained in I&E Circular No.

80-18, dated August 22, 1980, and the I&E Inspection Manual (specific section for citation not available).

We request confirmation of this philosophy in the way of a formal interpretation pursuant to 10 CFR 50.3.

Your response is requested in an expeditious manner.

Please contact Mr. William F. Quinn of my staff if you have any questions on this matter.

E. E.

Van Brunt, Jr.

Executive Vice President Project Director EEVB/RMC/mb cc:

E.

A. Licitra R. P.

Zimmerman A. C. Gehr 8503180265 850312 PDR