REGULATOR INFORMATION DISTRIBUTION S TEM (RIDS)
AOCESSION,NBR: 8503180066 DOC e DATE: 85/03/11 NOTARTZEDi, NO,.
DOCKET' FACIE:STN 50-528 Palo Verde Nucl e'ar Stationi Unit 1~
Ar )zona Publ) 05000528 STN-50 529 Palo Verde, Nuclear Station~
Unit 2i Ar)zona Publi 05000529 STN 50 530 Palo Verde, Nuclear Station~
Unit 3r Arizona Publi 05000530 AUTH'AME AUTHOR AFFILIATION VAN BRUNTiE,E.
Arizona Public Service Co.
RECIP,NAMEi
'ECIPIENT AFFILIATION KNIGHTONg G e W ~
Licensing Branch 3
SUBJECT:
Informs that RM Butler named as director. of technical svcs.
RM Butler resume encl'ISTRIBUTION CODE:
AQ01D COPIES RECEIVED:LTR ENCL.
SIZE TITLE:
OR Submittal:
General Distr ibution NOTES:Standardized plant ~
OL'2/31/80 Standardized plant ~
Standardized plant.
\\
RECIPIENT ID CODE/NAME.
'9 ELD/HDS3 NRR/DL DIR NRR/DL/TSRG NRR/DS I/RAB RGN5 COPIES LTTR EhfCLl 7
7 6
6 1
0 1
1 1
1 1,
1 1
1 RECIPIENT'"
ID CODE/NAME ADM/LFMB NRR/DE/MTEB NRR/DL/ORAB NRR/DSI/METB QQ COPIES" LTTR ENCL" 1
0 1
1 0
1 1
1 1
05000528 05000529 05000530 EXTERNALS LPDR NSIC-03<
05 1
1 1
NRC PDR 02 TOTAL NUMBER OF COPIES REQUIRED'TTR 26 ENCL 23
0
'I a
~
e p
'E
Arizona Nuclear Povver Project P.O. BOX 52034 o
PHOENIX, ARIZONA85072-2034 ANPP-32104-EEVB/WFQ March 11, 1985 Director of Nuclear Reactor Regulation Mr. George W. Knighton, Chief Licensing Branch No.
3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3
ANPP Organization Update Docket Nos.
STN 50-528(License No. NPF-34)/529/530 File: 85-056-026 G.1.01.10
Reference:
ANPP Early Readiness Review Meeting with NRC Managment, July 5, l984.
Dear Mr. Knighton:
This letter is provided to inform you that ANPP has named Mr. Robert M. Butler as Director of Technical Services.
Mr. Butler most recently held the position of
- Manager, Nuclear Engineering Department at Boston Edison
- Company, as listed on the attached resume.
Very truly yours, EEVB/MFQ/mb Attachment E.
E.
Van Brunt, Jr.
Executive Vice President Project Director cc:
A. C. Gehr R. P.
Zimmerman E. A. Licitra
(
8503180066 8503ii PDR ADOCK 05000528 PDRL '
W
\\
,l ll P
f I
HEADQUARTERS PERSONNEL RESUME I
H Director of Technical Services Educational Background Professional Level Experience Northeastern University Boston, Massachusetts B.S. Civil Engineering 1952 1957 Re istrations Professional Engineer:
Massachusetts Boston Edison Company 1957 1985 10/81 3/85
- Manager, Nuclear Engineering Department responsible for engineering, procurement and construction for all design changes and modifications in support of Pilgrim I
- One, a
670 megawatt operating nuclear plant.
4/72 10/81
- Manager, Nuclear Projects Department responsible for the management of utility, contractor and regulatory interfaces I
including the cost, scheduling and quality I
aspects of the
- design, procurement and I
licensing of PLlgrim Two, a
1200 megawatt (CE NSSS) nuclear plant.
9/70 4/72
- Manager, Pilgrim Two Study Team I
responsible for planning, direction, cost I
and schedule of the study team developing I
recommendations for future nuclear generating units.
1/66 9/70 Prospect Engineer responsible for the I
planning and direction of the engineering I
review of the project design for Pilgrim I
One.
1962 1965 Supervising Engineer responsible for various nuclear power plant studies I
including an assignment as a
Resident Engineer from 1964 to 1965 in General Electric's San Jose facility.
5839A/2078A
I W
~
h II
~
I 4
~
F FC F
Page 2
HEADQUARTERS PERSONNEL RESUME (Cont'd)
Director of Technical Services Educational Background Professional Level Experience 1960 1961 Engineer assigned to technical support activities at the Yankee-Rowe Nuclear Power Plant in the areas of reactor start~p, physics testing and data analysis.