ML17298B937

From kanterella
Jump to navigation Jump to search
Forwards Endorsements 1 & 2 to Nelia Policy N-88 & Maelu Policy M-88,respectively
ML17298B937
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/26/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Office of Nuclear Reactor Regulation
References
ANPP-31998-EEVB, NUDOCS 8503050439
Download: ML17298B937 (12)


Text

REGULATO INFORMATION DISTRIBUTION STEM (RIDS)

AOCESSION NBR;8503050439-'OC

~ DATE'! 85/02/26 NOTARIZED!, NO FACIL:STN>>50 528 Palo Verde Nuclear~ Station~

Unf,t ii Arizona Public AUTH',NAME),

AUTHOR "AFFI/IAT~ION VAN BRUNTiE;6 ~

"=

Arizona~ Publ-$ c S'er vice> Co.

RECIP ~ NAME'ECIPIENT< AFFIL'IATION Office>> of Nuclear 'Reactor>> Regulationi D)rector SUBJECT!-.Forwards",Endorsement>>

i~ 8, 2"to NELIA Policy N~88 8

MAELU Policy M 88irespect)vely, DISTRIBUTION CODE! M001DCOPIES RECEIVED!LTR

'NCL

'SIZE' T'ITLE'! Ihsur ance'.

Indemn<~ty/Endor sement Agreements NOTES!Standardized plant; OL'2/31/84 DOCKET' 05000528 050005?8 RECIPIENT) 1D CODE/NAMEi NRR LB3 LA

>COPIES'TTR* ENCL' 1

RECIPIENT ID CODE/NAME<

COPIES LTTR" ENCL:

INTERNA 'EG-. F I EXTERNAL; LPDR 01.

1 1

1>>

1 "SP NRC"'DR'2' 1-1

~

'TOTAL NUMBER OF COPIES" REQUIRED: L'TTR" 5'NCL 5

1 I

lii II 'l

~ ~

I r'

ii a

'l I'

1

~

Arizona Public Service Company ANPP-31998-EEVB/MFQ February 26, 1985 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No.

STN 50-528, License No. NPF-34 Secondary Financial Protection ANI Policy No. N-88; MAELU Policy No. M-88 File: 85-055-026

Dear Sir:

Pursuant to 10 CFR 140, enclosed are two certified copies of Endorsements Nos.

1 and 2 for secondary financial protection, ANI Policy No. N-88 and MAELU Policy No. M-88 for your use.

If you have any questions or concerns, please call.

Very trul your EEVB/JRP/mb Attachments E. E.

Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director cc:

Director Region V, USNRC NRC Project Manager E. Licitra NRC Resident Inspector, R. Zimmerman T. G.

Woods R. E. York J. L. Wilkins J.

R. McNamara D

J. iFogarty D.

W. Waters

'SOS0S04S9'50aka PDR ADOCK 0500052S J

PDR

, II

~

~

I 4

'ucloar Energy Lhbllltylneuranco NUCLEAR ENERGY LIABILITYINSURANCE ASSOCIATION SPECIF ICATION OF CERTIFICATE EFFECTIVE DATE AND PREMIUM ENDORSEMENT

- It is agreed that:

1.

The United States Nuclear Regulatory Commission has issued to the insureds name in Item 1 of the Declarations Operating License No. NPF-34 e ffective December 31, 1984 for the reactor described in -Item 3 o the Declarations of t e certificate.

s 2.

Item 6 of the Declarationr of the Certificate is deleted and replaced by the following:

Item 6.

Certificate Period:

Beginning December 31, 1984 and continuing to the effective date and time of cancellation or termination of the Master Pol~ic or this Certificate, whichever first occurs, eastern standard time.

3.

Item 8 of the Declarations of the Certificate is deleted and replaced by the following:

Item 8.

Portion of the annual premium payable for the companies'ontingent liability described in Condition 4 of the Master Polic from the effective date hereof to t e en of calendar year 1984' 9

13.95 This is to certify that this is a true copy of the original Endorsement having the endorsement number and being made part eC the Nuclear Energy Liability ~olicy (Facility Form) as des-igaat iihereon.

No ns Lorded hereunder.

John L Quattrocchi, Vice President LiabilityUnderwriting American Nuclear Insurera Effective Date of N-88 tnls Enaorserrtent 84

.Tn form a part of Certificate No.

tg:0't A,M. Standard Tints Arizona Public ~ervt'ce tompany, balt River Project Agricultural Improvement and Power

tstrtc, aso ec rtc
ompany, Soil'the~n ervi ce pate of Issue January 9,

1 985, Company of New Mexi co "or ttle su cribing corgpaniea and Southern California Publ Power Authority Enaorseinent No Countrirafnnud by Gonerat Manager

)

r mwa qq~

u~s

Nuclear Energy LiabilityInsui'ance NUCLEAR ENERGY LIABILITYINSURANCE ASSOCIATION ANNUAL PREMIUM ENDORSEMENT Calendar Year 1985 ANNUAL PREMIUM:

it is agreed that the Annual, Premium due the companies for the period designated above is

$4,650.00 This is to cert1fy that. th1s is a true copy of the original Endorsement having the endorsement number and being made part of the Huclear Energy LiabilityPolicy (Facility Form) as des-ignated hereon.

No Insurance 1

afforded hereunder.

Power District, El Paso Electric

ompany, out em a

i ornia is Date of Issue Januar I

8 Publ ic Service Company For the su of New Mexico and Southern California Public Power Authority criblng co panies By John I. Quattrocchi, Vice President-Liability Underwriting American Nuclear Insurers Effecti"e Date of Januar I

l985 Certificate No.

this Endorsement 12:01 A.M. Standard Time issued to Arizona Public Service

Company, Salt River Project Agricultural Improvement and Endorsement No Countersigned by General Manager

tS

)J'/

V'

~

NUCLEAR ENERGY LIABILITYINSURANCE MUTUAL ATOMIC ENERGY LIABILITYUNDERWRITERS SPEC IF ICATION OF CERTIFICATE EFFECTIVE DATE AND PREMIUM ENDORSEMENT It is agreed that:

l.

The United States Nuclear Regulatory Commission has issued to the insureds name in Item l of the Declarations Operating License No.'PF-34 effective oecemher 3>

~184

<<h ~id'

<<r certificate.

2.

Item 6 of the Declarations of the Certificate is deleted a(1d replaced by the following:<<in ancn cont>nving to the effective date and time or this Certificate, whicheVer first occurs, eastern s tandard time.

3.

Item 8 of the Declarations of the Certificate is deleted and replaced by the following:

Item 8.

Portion of the annual premium payable for the companies'ontingent liability described in Condition 4 of the Master Policy from the effective date hereof to the,end of calendar r

~s<

Effective Date of To form a part this Endorsement December 31 1984 of Certificate No.

M-88 Arizona Public Service

Company, Salt River Project Agricultural Improvement and I~ue t Power District El Paso Electric Com an Public Service Company of New Mexico and Southern California Public Power Authority January 9,

1985 Date of Isau This is to certify vnac this is a tree coyy of the original

'Endorsement having the endorsement number andP@igge 33+,qcay37+ (:o,>>I,<<>>,.es of the IIuclear Energy LiabilityPolicy (Facility Form) as des-ignated ereon.

Iio Xnsurance is af orded hereund r.

M

'UAI. h'I'OMI(; I:HI',ll(>Y I IA 3II.ITY I.I

)I'.RlVRI'I'IRS John L. Quattrocchi, Vice President-Liability Underwriting American Nuciear Insurers I':n<lor<><<.>><.>> t. No.

I3y

(;o>>>>1<.r<<ir>><<:

I l>y.

h>>r>>>>>>>f>:<s l<>>.'1<>;>>;f>farir>.

V

  • ~~~

g

U I

NUCLEAR ENERGY LIABILITYINSURANCE MUTUAL ATOMIC ENERGY LIABILITY UNDERWRITERS ANNUAL PREHIUH ENDORSEHENT Calendar Year 1985 ANNUAL PREHIUH:

It is agreed that the Annual Premium due the companies for the period designated above is:

$ 1,350.00

~.is to certify that this is a true oopy of the original Rrdorsement having the endorce!ren~ n:!ber and being made par5 erf the Nuclear Energy Liabilitj'l'icy(Facility Form) as des-i t

hereon.

No Insurance is afforded hereunder.

igna e

John L. Ouattrocchi, Vice PresMent-Liability Underwriting To form a part this Endorsement Januar I

1 8

of WN@(ZAK Arizona Public Service Company, Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison

Company, Public Issue to ervice ompany o

ew exico an out em a

i ornia u

ic ower ut ority Date of Issu Januar 1

85 For thc Subscribing Companies MU UAL ATOMIC ENERGY LIA ILITYU ERG'RITERS By Endorsement No.

Countarsignc<l by AuT IIonI'Isn 1 un'nnsnNTATI ra

~

q

~

l' r

, )