ML17298B912
| ML17298B912 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/13/1984 |
| From: | Messenger G NRC OFFICE OF INSPECTOR & AUDITOR (OIA) |
| To: | Rehm T NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| Shared Package | |
| ML17298B913 | List: |
| References | |
| CON-#185-705 OL, NUDOCS 8502220231 | |
| Download: ML17298B912 (2) | |
Text
t UNITEDSTATES NUCLEAR REGULATORY COMMISSION
'ASHINGTON, D. C. 20555 August 13 1984 MEMORANDUM FOR:
FROM:
SUBJECT:
5d-gpss 5BQ Thomas Rehm Assistant for Operations Geor'g H.
essenger Acting 'ctor Office of Inspector and Auditor GUNDERSON/ROYCE - CLIENTS OF GAP ALLEGED INSPECTION/INVESTIGATION IRREGULARITIES 84'p~~~:10 Attached is the Office of Inspector and Auditor's (OIA) report of investiga-tion into the alleged mishandling by the NRC of allegations by Robert Gunderson and Wallace Royce, former Bechtel employees at the Palo Verde Nuclear Generating Station, of construction deficiencies at Palo Verde.
We reviewed this report and deleted any information which we considered could result in an unwarranted invasion of privacy of any person named in the report.
As expunged, OIA has no objection to the public release of this report.
Attachment:
As stated cc:
Comission (5)
W. Dircks, EDO H. Plaine, OGC C. Kammerer, CA J.
- Fouchard, PA w/o att w/o att w/o att w/o att w/o att CONTACT:
George Mulley, OIA 49-24453 8502220231 840813 PDR ADOCK 05000529 8
e v