ML17298B880
| ML17298B880 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/07/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-31608-TDS, DER-84-101, NUDOCS 8502120252 | |
| Download: ML17298B880 (6) | |
Text
~>-CL)VEO
~g.I~lQ E FlLE COPY Arizona Nuclear Pomer Project P.O. BOX 52034 o
PHOENIX, ARI2ONA85072-2034 January 7, 1985 q<~g~~)I] l ANPP-33608-TDS/TRB U. S. Nuclear Regulatory Commission Region V
l450 Maria Lane Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects
Subject:
Reference:
Containment Purge Valves File:
85-019-026; D.4.33.2 (A) Request for Schedular Exemption to 10CFR50, Appendices A
and K, ANPP-31193, dated November 21, 1984.
(B) Final Report DER 84-96, ANPP-31385, dated December 7,
1984.
(C) Final Report DER 84-101, ANPP-31490, dated December 14, 1984.
Dear Sir:
Reference (A) and (B) informed you that the PVNGS design for the subject valves is being changed to utilize fail closed pneumatic operators in place of the current motor operators and that this change (DCP-J-CP-023) would be completed prior to initial criticality (Mode 2).
Reference (C) documented the failure of one of the motor operators to function properly.
The valve has been repaired in accordance with our commitment to the NRC.
In an effort to provide the NRC with a complete report on the status of the operators, the Final Report for DER 84-10l restated our intention to change the motor operators to pneumatic operators
- however, we inadver-tently stated this would be accomplished by Mode 4 instead of Mode 2 as committed to in References (A) and (B).
8502120252 850107 PDR ADOCK 05000528 8
~'%is pqq.;
e v
A P
f r
)
I
/ r~l'~~
I F"
/
Mr. D. P. Kirsch ANPP-31608 Page Two Please make this correction to your copy of the Reference (C).
Very truly yo'urs, F %.V~~K<~
E. E. Vsn Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/plk cc:
See Page Three
C r
Mr. D. F. Kirsch ANPP-31608 Page Three Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 T. G. Woods, Jr.
D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo B. S. Kaplan J.
R.
Bynum J.
M. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R.
W. Welcher H. D. Foster D. R. Hawkinson R. P.
Zimmerman L. Clyde M. Matt T. J.
Bloom D. N. Stover J.
D. Houchen J.
E. Kirby D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500
- Atlanta, GA 30339
~
~
~
'