Forwards Certification of Compliance w/10CFR50.49,per 841227 Generic Ltr 84-24 Re Certification to 10CFR50.49, Environ Qualification of Electric Equipment Important to Safety for Nuclear Power Plants
ML17298B877
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/08/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-31895-EEVB, GL-84-24, IEB-82-04, NUDOCS 8502120172
Download: ML17298B877 (7)


Text

REGULATORY NFORMATION DISTRIBUTION S'r EM (RIDS)

ACCESSIONgNBR; 850 FACILiSTA"50 528 STN 50~529 STN~50 530 AUTH BYNAME VAN BRUNTgE,ED RECIP.NAME, KNIGHTONgG ~ 8 ~

2120172'OC

~ DATE o 85/02/08 NOTARIZED; YES Palo Verde Nuclear Station~

Unit ii Arizona. Publi Palo Verde Nuclear Station~

Unit 2g Arizona Publ,i Palo Verde Nuclear Station~

Unit 3i Arizona Publi AUTHOR AFFILIATION Arizona Public Service Co ~

RECIPIENT AFFILIATION Licensing Branch 3

DOCKET' 05000528 05000529 05000530 SUBJECT'orwards certification of compliance w/10CFR50

~ 49rpep 841227 Generic Ltr 84-24 re cet tification to 10CFR50

~ Q9, "Environ Qualification of Electric Equipment Important to Safety fot Nu'clear Power Plants."

DISTRIBUTION CODE:

AOQ8D COPIES RECEIVED:LTR ENCL SIZE:.

TITLE: OR/Licensing Submittal:

Equipment Qualification NOTES:Standardized plant ~

OL:12/31/84 Standardized plant.

Standardized

plant, 05000528 0500052$

05000530 RECIPIENT ID,CODE/NAME NRR LB3 BC 12 INTERNAL: ACRS 15 ELD/HDS3 12 GC 13 NRR/DE/EQB 07 NRR/DSI/AEB RGN5 COPIES LTTR ENCL 1

0 8

8 1

1 1

?

?

1 1

1 1

RECIPIENT ID CODE/NAME LICITRAt E 01 ADM/LFMB ELD SHIEl DS g H NRR KARSCHIR N

IR 14 G FI 00 COPIES LTTR ENCL 1

1 1

0 1

1 1

1 1

1 1

1 EXTERNAL: LPDR NSIC 03 05 1

1 1

1 NRC PDR 02 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 22

Arizona Public Service Company ANPP-31895-EEVB/WFQ/MAJ February 8, 1985 Director of Nuclear Reactor Regulation Mr. George W. Knighton Licensing Branch No.

3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3

Certification of Compliance to 10 CFR 50.49 Docket Nos.

STN 50-528(License NPF-34)/529/530 File: 85-056-026'.l.01.10

References:

(1)

Generic Letter 84-24 dated December 27, 1984.

Subject:

Certification to 10 CFR 50.49, Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants.

(2)

Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station Units 1, 2, and 3 dated

November, 1983 (Supplement 5).

(3)

Letter from E. E.

Van Brunt, Jr.,

APS, to G.

W. Knighton, NRC, dated December 7,

1984 (ANPP-31379).

Subject:

Completion Status of PVNGS Environmental Qualification Program and Justification for Interim Operation (JIO's) for items not completed.

(4)

Letter from E. E.

Van Brunt, Jr.,

APS, to G.

W. Knighton, NRC, dated December 3,

1984 (ANPP-31297).

Subject:

PVNGS Environmental Qualification Program and Additional JIO.

(5)

Letter from E. E.

Van Brunt, Jr.,

APS, to G.

W. Knighton, NRC, dated September 10, 1984 (ANPP-30476).

Subject:

PVNGS Environmental Qualification JIO's.

Dear Mr. Knighton:

Reference (1) requested that each licensee of an operating reactor submit, under oath of affirmation, a certification that: (a) the utility has in place and is implementing an Environmental Qualification (EQ) Program that will satisfy the requirements, of 10 CFR Section 50.49 within the currently approved schedule for the plant without further extension; (b) the plant has at least:

one path to safe shutdown using fully qualified equipment, or has submitted a justification for continued safe operation (JCO) pending full qualification of any equipment not fully qualified; and (c) all other equipment within the scope of 50.49 is either fully qualified or a JCO has been submitted pending full qualification.

Reference (1) also requested that the certifica-tions described in (a),(b),

and (c) above shoul'd specifically address all IE Bulletins and Information Notices that identify EQ problems, to the extent that such bulletins and notices are relevant to the licensee's facility.

8502120i72 850208 1

PDR

  • DOCK 05000528 P

PDR op~

sly

4 Mr. George W. Knighton Certification of Compliance to 10 CFR 50.49 ANPP-31895 Page 2

The following Bulletins and Information Notices are considered applicable to these certifications:

IE Bulletin 82-04, IE Information Notices 82-11, 82-52, 83-45, 83-72, 84-23, 84-44, 84-47, 84-57, 84-68 and 84-78.

In accordance with the above request, we are submitting the attached certifi-cation for Palo Verde Nuclear Generating Station (PVNGS) Unit 1.

For PVNGS Units 2 and 3, we will identify, as requested previously by the staff per Reference (2), all equipment that is not identical to Unit 1 equipment and/or is located in areas in which environmental conditions are more severe than the demonstrated values for Unit 1.

For any such equipment, we shall submit complete qualification information, or justifications for interim operation, prior to receipt of an operating license for those units.

If you have any questions, please call me.

Very truly yours, APS Vice President Nuclear Production ANPP Project Director EEVB/MAJ/mb Attachment cc:

H. Garg w/a R. LaGrange w/a E. Licitra w/a R.

Zimmerman w/a A. Gehr w/a

0 4>

'L l

ANPP-31895 CERTIFICATION OF COMPLIANCE TO 10 CFR 50.49 I hereby certify to the best of my knowledge and belief, that Arizona Public Service

Company, licensee of Palo Verde Nuclear Generating Station Unit 1, (a) has in place and is implementing an Environmental Qualification Program that satisfies the requirements of 10 CFR 50.49 without any further expected extensions other than those previously requested by References (3) through (5)

(b) has at least 1 path to safe shutdown using fully qualified equipment except for the equipment that we have submitted justifications for interim operation for per References (3) through (5).

(c) have fully qualified all equipment within the scope of 10 CFR 50.49 with the exceptions of the justifications for interim operation as submitted by References (3) through (5).

The above certification includes our actions taken on the recommendations contained in IE Bulletin 82-04 and IE Information Notices: 82-11, 82-52, 83-45, 83-72, 84-23, 84-44, 84-47, 84-57, 84-68, and 84-78 as applicable to PVNGS.

~ f >

wc fg I

Donald B. Karner Assistant Vice Pxesident Nuclear Production NOTA Y PUBLIC My Gee

/aston Exp/res April 6, 1987 My Commission Expires: