REGULATORY FORMATION DISTRIBUTION SY "M (RIDS)
ACCESSIO~ NBR:8501230392 DOC.DATE: 85/01/16 NOTARIZED:
NO DOCKET' FACIL!STN 50-528 Palo Verde Nuclear Stations. Unit ii Arizona Publi 05000528 AUTH BYNAME AUTHOR AFFILIATION VAN BRUNTiE,E, Arizona Public Service Co; REC IP ~ NAME RECIPIENT AFFILIATION EISENHUT<D ~ G ~
Division of Licensing
SUBJECT:
Forwards final versions of fuel loads incentive program, inadvertently omitted from 841226 ltr.Program included w/ltr not final ver sion'ISTRIBUTION CODE; A001D COPIES RECE'IVEDiLTR
" ENCL SI E'i,
-TITLE! OR Submittal!
General Distribution NOTES:Standardized plant ~
OL e 12/31/84 05000528 RECIP IENT ID CODE/NAME NRR<< LB3 BC 01 INTERNAL+ ACRS 09 ELD/HDS3 NRR/DLi DIR NRR/DL/TSRG NRR/DSI/RAB RGN5 COPIES LTTR ENCL 7
7 6
6 1
0 1
1 1=
1 1
1 1
1 REC IPIENT ID CODE/NAME ADM/LFMB NRR/DE/MTEB NRR/DL/ORAB ETB I<
04 COPIES I.TTR~ ENCL<
1 0
1 1
1 0,
1 1-1 1
EXTERNAL LPDR NSIC 03 05 1
1 1
1 NRC PDR 02' 1
TOTAL NUMBER'F'OPIES REQUIREDe LTTR 26 ENCL:
23~
~
I l
~
Arizona Public Service Company ANPP-31708-EEVB/WFQ January 16, l985 Mr. Darrell Eisenhut Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No.
STN 50-528 License No. NPF-34 File:
85-056-026'5-002-419.5
Reference:
Letter from E. E.
Van Brunt, Jr.,
APS, to D. Eisenhut, NRC, dated December 26, 1984 (ANPP-31573);
Subject:
NRC Readiness Review.
Dear Mr. Eisenhut:
The reference letter discussed several areas regarding the operation of PVNGS Unit 1 including the fuel load incentive program which was provided as Attachment B to the letter.
Inadvertently, the version of the program submitted by the referenced letter was not the final version of the program.
The final version actually implemented is attached and marked to indicate the minor differences from the previously submitted version.
Very truly yours, EEVB/WFQ/mb Attachment
%. V~
E. E.
Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director cc:
J.
B. Martin E.
A. Licitra R.
P.
Zimmerman A. C. Gehr G. Hernandez H. Thompson T. Novak G. Knighton 8501230392 850116 PDR ADOCK 05000528 PDR
C k.
ANPP-31708 STATE OF ARIZONA
)
) ss.
COUNTY OF hfARICOPA)
I, Edwin E.
Van Brunt, Jr.,
represent that I am Vice President, Nuclear Production of Arizona Public Service
- Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its
- contents, and that to the best of my knowledge and belief, the statements made therein are true.
Edwin E.
Van Brunt, Jr.
Sworn to before me this day of Notary Public My Commission Expires:
0
)
'I
~ ',C
~
p J 1t'f
,ANPP-31708 Page 1 of 2 DBK5/15/84 ATTACHMENT B PVNGS UNIT 1 FUEL LOAD INCENTIVE PROGRAM Prompt fuel load of 'PVNGS Unit 1 is of paramount importance to the customers and stockholders of the ANPP Participants.
As such it is the intent of the PVNGS Unit 1 Fuel Load Incentive Program (hereinafter referred to as the Program) to maximize the probability of achieving the earliest possible fuel load date consistent with the Participants'edication to quality and safety and consistent with all applicable regulations.
It is recognized that the project team which APS has assembled to engineer, construct, startup and operate PVNGS Unit 1 is dedicated and loyal to the concept of devoting their full attention and ener-gies to the earliest possible fuel load date for Unit 1. It is further recognized, however, that a financial incentive to each contributing team member is an effective means to assist the team management in assuring a maximum effort from ~ever contributing team member over the duration of startup prior to fuel load.
ELIGIBILITY:
Only management employees of Arizona Public Service Company or other ANPP Participants assigned to work on PVNGS Unit 1 fuel load activities are eligible to participate in the program.
Eligible employees who are also participants in the APS corporate management incentive program shall be given the choice of participation in either the APS corporate management incentive program or the Program but not both.
The Vice President, Nuclear Production, his assistant and all employees of the APS equality Assurance Department shall be ineligible to participate in the program.
It shall be the responsibility of the APS Vice President, Nuclear Production to recommend'o the ANPP Administrative Committee the names of individuals eligible to participate in the program.
Personnel recommended for eligibility to participate in the program subsequent to the initial eligibility date of May 1, 1984, shall receive a prorated share of the incentive.
The prorating period shall begin June 1, 1984, and end August 31, 1984.
INCENTIVE:,
. The'Program incentive shall be calculated using a base incentive for each Program participant.
The base incentive or a prorated portion thereof shall be awarded to each program participant if fuel load activities for PVNGS Unit 1 occur during the 24-hour
- period, November 1,
1984.
Fuel load activities shall be defined as the insertion of the first fuel element assembly into the reactor vessel.
1 For each 24-hour period subsequent to November 1, 1984, for which fuel load activities are delayed, the base incentive or prorated portion thereof shall be reduced by the amount of 2/3 of 1X resulting in no incentive being awarded for commencement of fuel load activi-ties on PVNGS Unit 1, subsequent to March 30, 1985.
Page 2
DBK5/15/84 For each 24-hour period to November 1, 1984, for which fuel load activities commence on PVNGS Unit 1, the base incentive or prorated portion thereof shall be increased by the amount of 2/3 of 1Fo.
The base incentive shall be defined as the program partici-pants'nnual base pay (including deferments) on May 1, 1984, or the date of their eligibility whichever is less.
PAYMENT:
Payment of the incentive shall occur in the pay period following the 40th day after commencement of fuel load activities on PVNGS Unit 1.
Payment of the incentive shall be in the form of a special one time adjustment to salary.
PROGRAM ADMINISTRATION:
The ANPP Administrative Committee shall administer the program to ensure that safety and quality objectives are achieved, approve eligible personnel and determine commencement of fuel load activities of PVNGG Unit 1.
The APG Vice President, Nuclear Production shall assist by providing recommendations of eligible personnel and advising the ANPP Administrative Committee of the estimated program payout.
Program costs shall be shared by the ANPP Participants in their Participation share.