ML17298B813

From kanterella
Jump to navigation Jump to search
Submits Followup Rept Re Status of Physical Security Program Deficiencies Identified During Preoperational Physical Security Insps.Alarm Rate Decreased & 1,000-watt Fixtures Satisfactorily Installed
ML17298B813
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/28/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31599-EEVB, NUDOCS 8501160206
Download: ML17298B813 (4)


Text

KtiEll/EO I'!P~C Arizona Public Service Company mglIJ/g31)99ggHIFBgl

'F/GEG Mr. John B. Martin, Regional Administrator Office of Inspection and Enforcement Region V

U.S. Nuclear Regulatory Commission 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 BEGfORt! Jp",

XE Hg FILE CORI

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3

Docket Nos.

STN 50-528/529/530 Physical Security Program Deficiency Status File:

84-056-026 G.1.01.10 84-001-493

Reference:

Letter from E. E.

Van Brunt, Jr.,

APS, to John B. Martin, NRC Region V, dated December 14, 1984 (ANPP-31468);

Subject:

Physical Security Program Deficiencies.

Dear Mr. Martin:

This letter is submitted as a follow-up report to discuss the status of physical security program deficiencies identified during pre-operational physical security inspections.

Specific paragraph numbers refer to the Referenced letter.

The following items have been completed and inspected by the NRC.Resident Inspector:

the roof hatch to the Diesel Generator Building (paragraph 1), lighting deficiencies (paragraph 5), and the Fuel Building HVAC exhaust ducts (paragraph 8).

The 1000 watt fixtures have been satisfactorily installed on the 80 foot masts and a significant increase in general protected area lighting has been realized.

A lighting survey will be conducted and the results summarized in our next periodic report.

The alarm rate has continued to decrease since the inspection.

The improvement is attributed to increased knowledge and experience of plant personnel using ACAD's.

The improved alarm rate is permitting more thorough investigation of

problems, evaluation of engineering or maintenance procedures, and general maturation of an operating security system.

Ve are continuing to meet the objective of paragraph 3.

The use of temporary ACAD's by construction personnel was terminated on December 26, 1984 in anticipation of the granting of an Operating License.

If you have any questions or concerns, please contact me at your earliest convenience.

Very truly y s,

850iih0206 84i228 PDR ADOCK 05000528 8

PDR EEVB/MFF/GEC/mb E. E.

Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director

f

t Mr. J.

B. Martin Physical Security Program Deficiency Status ANPP-31599-Page 2