Corrects 841218 Request for Proposed CESSAR Changes Be Reviewed as Proposed FSAR Changes for Facilities.Approval Also Accepts Justification for Using Primary Sys Blowdown & Separation Analyses Per Reg Guide 1.75
ML17298B802
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/02/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-31502-WFQ, NUDOCS 8501090099
Download: ML17298B802 (7)


Text

REGULATOR NFORMATION DISTRIBUTION SY~M (RIDS)

A ACCESSION NBR:850 F(t'.IL'STN 50 528 STN-50-529 STN-50-530 AUTH,NAME VAN BRUNTPE ~ ED REC IP, NAME KNIGHTONE G ~ N ~

1090099 DOC ~ DATE: 85/01/0?

NOTARIZED: YES Palo Verde Nuclear StationE Unit 1E Arizona Publi Palo Verde Nuclear Stationi Unit 2i Arizona Publi Palo Verde Nuclear StationE Unit 3P Arizona Publi AUTHOR AFFILIATION Arizona Public Service Co.

RECIPIENT AFFILIATION Licensing Branch 3

DOCKET 05000528 05000529 05000530

SUBJECT:

Corrects Srl1218 request for proposed CESSAR changes be reviewed as proposed FSAR changes for facilities, Approval also accepts justification for using primary sys blowdown 8 separation analyses per Reg Guide 1 ~ 75, DISTRIBUTION CODE:

BOO ID COPIES RECEIVED:LTR J ENCI. J SIZE:

TITLE: Licensing Submittal:

PSAR/FSAR Amdts L Related Correspondence NOTES:Standardized plant.

Standardized

plant, Standardized plant.

050005?S 05000529 05000530 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL: ACRS rl 1 ELO/HDS3 IE/DEPER/EPB 36

'NRR ROEENBL NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/NEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEBrl0 NRR/DHFS/PSRB NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23 RGN5 EXTERNAL; BNL(ANDTS ONLY)

FENA-REP OIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 0

1 0

6 6

1 0

1 1

1 1

1 1

2 2

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

3 3

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME NRR LB3 BC LICITRAEE 01 ADM/LFNB IE FILE IE/DQASIP/QAB21 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/OE/'MTEB 17 NRR/DE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/Os I/AS8 NRR/DS I/CS8 09 NRR/DSI/METB 12 NR SI/RA8 22 E

I Orl ANI/NI8 DMB/DSS (AMDTS)

LPDR 03 NSIC 05 PNL GRUELPR COPIES LTTR ENCL-1 0

1 1

1 0

1 1

1 1

1 0

1 1

2 1

1 1

1 1

1 1

0 1

1 1

1 1

1 1

1 1

1 1

0 1

1 1

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 53 ENCL 05

4g 1

'll h,'c

Arizona Public Service Company Director of Nuclear Reactor Regulation Mr. George W. Knighton, Chief Licensing Branch No.

3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 December 18, 1984 ANPP-31502 WFQ/TFQ CORRECTED COPY January 2,

1985

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3

Docket Nos. STN-50-528/529/530 Post-FDA Proposed CESSAR Changes File:

84-056-026 G.1.01.10

References:

(A) Letter from A.E. Scherer, CE, to D.G. Eisenhut, NRC, dated October 16, 1984 (LD-84-060);

Subject:

CESSAR Startup Testing.

(B) Letter from A.E. Scherer, CE, to D.G. Eisenhut, NRC, dated December 5,

1984 (LD-84-070);

Subject:

CESSAR Amendment 10.

Dear Mr. Knighton:

As discussed with the NRC staff, it is APS'nderstanding that Post-Final Design Approval (FDA) proposed CESSAR changes wi 11 not be reviewed and approved by the NRC staff, unless a change meets the criteria of the NRC's Standardization Policy.

That is, a proposed change to CESSAR will be reviewed and approved if there is an increase in the safety and health of the public.

With this staff position in mind, APS has reviewed all of the proposed CESSAR changes submitted to the staff, including CESSAR Amendment 9, issued on February 27, 1984.

With regard to those changes which will not be reviewed on the CESSAR docket due to the Standardization

Policy, APS hereby requests that the attached, previously submitted, proposed CESSAR changes be reviewed as proposed PVNGS FSAR changes.

This request is justified because approval of the attached proposed FSAR changes will allow 1) incorporation of improvements into the initial test program, 2) use of the most recent CE secondary water chemistry guidelines, and 3) removal of unwarranted restrictions on the transfer of hydrazine.

Your review and approval will also accept

1) the justif1catiori Vor using primary system blowdown and
2) separation analyses with respect to Regulatory Guide 1.75 for Plant Protection System Cabinets.

8501090099 850i02 PDR ADOCK 05000528 A

PDR

Mr. G.

M. Knighton Post-PDA Proposed CESSAR Changes

, ANPP-31502 Page 2

p'lease contact Mr. William Quinn of my staff if you have any questions on this matter.

Very truly yours

/'l~

~ah E.

E.

Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TFQ/mb Attachments cc:

E. A. Licitra (w/a)

A. C. Gehr (w/a)

R. P.

Zimmerman (w/a)

I It

~

r

December 18, 1984 ANPP-31502 STATE OF ARIZONA

)

) ss.

COUNTY OF HARICOPA)

I, Edwin E.

Van Brunt, Jr.,

represent that I am Vice President, Nuclear Production of Arizona Public Service

Company, that the foregoing document has been signed oy me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its
contents, and that to the best of my knowledge and belief, the statements made therein are true.

Edwin E.

Van Brunt, Jr.

Suorn to be ore me this day of., '

w~w, 1984.

Ny Commission Expires:

"Py Ccs vissl n BpDtioo A)ill6 1937 Notary Publi