REGULATORY FORMATION DISTRIBUTION SY
.M (RIDS) cg ACCESSION NBR:8012260203 DOC,DATE: 84/12/21 NOTARIZED:
NO FACIL:STN-50-528 Palo Verde Nuclear Stationi Unit ii Arizona Publi AUTH B NAME AUTHOR AFFILIATION VAN BRUNTEEi.E, Arizona Public Service Co.
RECIP,NAME~
RECIPIENT AFFILIATION MARTINEJ ~ BP Region Sr Office of Director
SUBJECT:
Commits to completing corrective actions required by listed deficiency repts (DERs) for any structureisys or component prior to initial entry into any mode, Other commitments also DISTRIBUTION CODE:
B001D COPIES RECEIVED:LTR ENCL SI2,'E:
/
dP TITLE: Licensing Submittal:
PSAR/FSAR Amdts 8, Related Correspondence NOTES:Standardized plant ~
DOCKET 05000528 05000528 RECIPIENT ID CODE/NAME NRR/DL/ADL NRR LB3 LA INTERNAL; ACRS 01 ELO/HDS3 IE/DEPER/EPB 36 NRR ROErM ~ L NRR/DE/CEB 11-NRR/DE/EQB 13.
NRR/DE/MEB 18 NRR/DE/SAB 2g NRR/DHFS/HF EBPO NRR/DHF S/PSRB NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/OS I/RSB 23 RGN5 EXTERNAL: BNL(AMDTS ONLY)
FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENC 1
1 6
1 1
1 21 1
1 1
1 1
1 1
1 1
3 1
1 1
1 REC IP IENT ID CODE/NAME NRR LB3 BC LICITRAFE 01 ADM/LFMB IE. FILE IE/DQASIP/QAB21 NRR/DE/AEAB NRR/OE/EHE8 NRR/DE/GB 28 NRR/DE/t1TEB 17 NRR/DE/SGE8 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DS I/CSB 09 NRR/DS I/METB 12 N
S-B 22 REG F
00 DAMI/MI8 DMB/DSS (AMDTS)
LPDR 03 NSIC 05 PNL GRUELER COPIES LTTR ENC 1
1 TOTAL NUMBER OF COPIES REUUIREO:
LTTR 53 ENCL
$5
S 1
l, o
I l
II
)<
l' la
'i a
~
Arizona Public Service Company Mr. John B. Martin, Administrator U.S. Nuclear Regulatory Commission Region V
1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 ANPP-31555-EEVB/MFQ/JRB December 21, 1984
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1
Docket No. 50-528 Future PVNGS Unit 1 Activities File: 84-056-026 G.1.01.10
Dear Mr. Martin:
APS commits that prior to initial entry into any mode, the corrective action required by the following DER's will be complete for any structure,
- system, or component required to be operable for that mode:
84-48, 84-27, 84-21, 84-13, 84-64,84-101, 84-102, 84-54, 84-31, and 84-52 APS commits that the evaluation and any necessary rework will be complete prior to initial entry into Mode 6 to ensure the seismic qualification of the Control Room, Essential Air Handling Units and the Fuel Building Essential Air Handling Units.
APS further commits that, prior to initial entry into Mode 2 to achieve initial criticality, it will:
A.
Develop and implement maintenance procedures discussed in IE Bulletin 82-02.
B.
Establish the capability to document the radioactive effluent concentrations recorded by the radiation monitoring system (RMS).
C.
Train all licensed operators assigned to Unit 1 (i) to use the RMS
- computer, and the effective alarm response procedure for all reactor conditions, (ii) to obtain radiation readings and trends from the
- RMS, (iii) to respond to unusual conditions in accordance with the effective alarm response procedure, and (iv) to make notifications in accordance with the Emergency Implementing Procedures.
APS further commits that prior to entering any operational mode, including initial fuel loading, it will:
842 2260243 841221 I
PDR ADOCK 05OOO528 8
(
i)g
~ 4
~
P Mr. J.
B. Martin
~ Future PVNGS Unit 1 Activities ANPP-31555 Page 2
A. Certify to the Regional Administrator, Region V that the operability of systems required for operation in such mode has been demonstrated to meet the acceptance criteria in the Technical Specifications through implementation of surveillance procedures, through Successful completion of preoperational testing which specifically verifies the requirements of the applicable Technical Specifications and which were performed within the required surveillance interval or by operability as demonstrated in the preceding mode or modes.
It is understood that the commitments included herein do not take precedence over or replace any requirements of the Operating License or the PVNGS Technical Specifications.
Very truly yours, E.
E.
Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVB/WFQ/JRB/mb