ML17298B636

From kanterella
Jump to navigation Jump to search
Forwards Proposed Draft FSAR Changes,Revising Description of Emergency Lighting Sys,Evacuation & Offsite Communication Sys & Clarifying Offsite Power Connection.Changes Will Be Included in Amend 14 to FSAR
ML17298B636
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/10/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-31399-EEVB, NUDOCS 8412130379
Download: ML17298B636 (8)


Text

'le j

~

0 REGULATORY I'IFORMATION DISTRIBUTION SY

'EM (RIDS)

ACCESSION NBR:841 FACIL;STN 50 528 STN-50"529 STN 50 530 AUTH,NAME VAN BRUNTeE ~ E>>

REC IP ~ NAME KNIGHTONiG>> W, 2130379 DOC>> DATE: 84/12/10 NOTARIZED: YES Palo Verde Nuclear Stationi Unit li Arizona Publi Palo Verde Nuclear Stationi Unit 2i Arizona Publi Palo Verde Nuclear Station~

Unit 3~ Arizona Publi AUTHOR AFFILIATION Arizona Public Service Co.

RECIPIENT AFFILIATION Licensing Branch 3

DOCKET 05000528 05000529 05000530

SUBJECT:

Forwards proposed drat FSAR changesirevising description of emengency,1ignting sys,evacuation a oifsite communication

~to sys 8 clarifies offsite power connection. Changes will be included in Amend 14 to FSAR ~

DISTRIBUTION CODE:

8001D COPIES RECEIVED:LTR ENCL SIZE;.

TITLE: Licensing Submittal:

PSAR/FSAR Amdts 8, Related Correspondence NOTES;Standardized plant'.

Standardized

plant, Standardized plant>>

05000528 05000529 05000530 RECIPIENT IO CODE/NAME NRR/DL/ADL NRR L03 LA INTERNAL: ACRS ELO/HDS3 IE/DEPER/EPB 36 IE/DQA SIP/QAB21 NRR/DE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/OE/SGEB 25 NRR/OHFS/LQB 32 NRR/DL/SSPB NRR/DSI/ASB NRR/OSI/CSB 09 NRR/OSI/METB 12 AB 22 04 RM/DDAMI /MI8 EXTERNAI; BNL(AMDTS ONI Y)

FEMA REP DIV 39 NRC PDR 02 NTIS COPIES LTTR ENCL 1

0 1

0 6

6 1

0 1

1 1

1 1

0 1

1 2

2 1

1 1

1 1

1 0

1 1

1 1

1 1

1 1

1 1

1 0

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME NRR LB3 BC LICITRAgE 01 ADM/LFMG IE FILE IE/DEPER/IRB 35 NRR ROE<M.L NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/DE/MEB 18 NRR/OE/SAB 24 NRR/OHFS/HFEB40 NRR/OHFS/PSRB NRR/DSI/AEB 26 NRR/DS I/CPB 10 NRR/OSI/ICSB 16 NRR/DS I/PSB 19 NRR/DSI/RSB 23 RGN5 DMB/DSS (AMDTS)

LPDR 03 NSIC 05 PNL GRUEL'iR COPIES LTTR ENCL 1

0 1

1 1

0 1

1 1

1 1

1 1

1 2

2 1

1 1

1 1

~

1 1

1 1

1 1

1 1

1 1

1 1

1-1 1

1

'1.

1 1

TOTAI. NUMBER OF COPIES REQUIRED e LTTR 54 ENCL 06

pi W

~

N II W

0 f

, I s

~

I e

ll e

'i

Arizona Public Service Company ANPP-31399-EEVB/MFQ December 10, 1984 Director of Nuclear Reactor Regulation Mr. George M. Knighton, Chief Licensing Branch No.

3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3

Docket Nos.

STN 50-528/529/530 PVNGS FSAR Update Electrical Systems File:

84-056-026 G.1.01.10

Dear Mr. Knighton:

Enclosed are draft proposed FSAR changes for your information.

These changes

1) revised the description of the emergency lighting system,
2) revise the description of the evacuation and offsite communication systems, and 3) clarify offsite power connections.

These changes are considered acceptable since

1) seismic analysis criteria remains consistent with Regulatory Guide 1.29, and the installed locations for emergency lighting are consistent with the requirements for operator access for safe
shutdown,
2) the revised evacuation and communications descriptions meet NUREG 0654 and Standard Review Plan 9.5.2 criteria and are made consistent with the PVNGS Emergency Plan Section 7.2, and 3) the development of the offsite power system has not changed.

These changes are expected to be incorporated in FSAR Amendment 14 to the FSAR which is scheduled for submittal in February 1985.

Please contact William Quinn of my staff if you have any questions.

Very truly y urs E.

E.

Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/MFQ/mb Enclosure S412130379 841210 PDR ADOCX aS000S2SI F

PDR aea

(

'%e

l II

ANPP-31399 STATE OF ARIZONA

)

) ss.

COUNTY OF MARICOPA)

I, Edwin E.

Van Brunt,'r.,

represent that I am Vice President, Nuclear Production of Arizona

- Public Service

Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its
contents, and that to the best of my knowledge and belief, the statements made therein are true.

Edwin E.

Van Brunt, Jr.

Sworn to before me thief/

dey of 1984.

otary Publ Ny Commiss'ion Expires:

M Coinmlssion Expires April 6, 1S57

w

~.

s I

4

~w o 0

A t

4 I

,Mr, G.

M. Knighton

~~.

'P0NGS FSAR Update Electrical Systems ANPP-31399 Page 2

cc:

A. C. Gehr (w/a)

R. P.

Zimmerman (w/a)

E.

A. Licitra (w/a)

L, l

k I

J