ML17298B613

From kanterella
Jump to navigation Jump to search
Forwards Listing of Correspondence Affecting Licensing Documents as Presently Amended.Changes Made in Ltrs Previously Submitted Will Be Identified
ML17298B613
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/07/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-31369-EEVB, NUDOCS 8412110327
Download: ML17298B613 (13)


Text

REGULATOR INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBRj8412110327 DOC ~ DATE: 84/12/07 NOTARIZED:, YES DOCKET FAC'lL':STN 50 528 Palo Verde'uclear>> Stations STN 50 529 Palo Vei de Nuclear Stationi Unit ii Uni't 2i Arizona Publ,i Ar izona Publ,i 05000528 05000529 STN 50-530 Palo Verde Nuclear Stationi Unit 3i Arizona Publi 05000530 AUTH",NAME>>, AUTHOR AFFILIATION VAN BRUNTiE',E'. Arizona Public Service Co, NEC IP ~ NAME'ECIPIENT AFFIL'IATION.

KNIGHTONg G i W ~ Licensing Branch 3

SUBJECT:

, Forwards listing of correspondence" affecting licensing documents as present-lyamended.Changes made in ltrs preViously submitted will be identified.'ISTRIBUTION

'CODE: B001D COPIES RECEIVED:LTR, 'NCL SIZE:,

TITLE'. Licensing Submitta,l: PSAR/FSAR Amdts 8, Related Correspondence NOTES:Standardized .plant, 05000S28

'Standardized plant ~ 05000529 "Standardi'zed plant; 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME, LTTR =ENCL>> ID CODE/NAME LTTR" ENCL" NRR/OL/AOL NRR LB3>> LA 1>>

1 0

0 NRR LICITRAg LB3 BC E'1 l 1

0 1

INTERNAL: ACRS 41 6' ADM/LFMB 1 0 ELD/HDS3 1- 0 IE F 1 1 IE'/DE P ER/EP B 1 1 ILE'E/DEPER/IRB 35 1 1 36'E'/OQASIP/QAB21 1 NRR ROE'iMaL 1 NRR/DE'/AEAB NRR/DE'/EHEB NRR/DE/GB NRR/DE'/MTEB 28 17 2

1 0

1 1

NRR/DE/CEB NRR/DE/EQB NRR/DF/MEB NRR/DE/SAB 18 24 11 13" 1

2 1

1 1

2 1

1c NRR/OE/SGEB 25. 1>> 1 NRR/DHFS/HFEB40 1 1 NRR/DHFS/LQB 32'. 1 1 NRR/DHFS/PSRB 1 1 NRR/DL/SSPB 1 ~ 0 NRR/DS I/AEB 1 1 NR R/D 8 I'/AS B 1 1 10 26'RR/DSI/CPB 1 1>>

NRR/DSI'/CSB 09 1 1 NRR/OSI/ICSB 16 1 1 NRR/DSI/METB 12,", ic NRR/DS I/PSB 19 1 1.

NRR/DSI'/RAB 2?.'. 1 1 NRR/DSI/RSB ?3 1 04 1 1 RGN5 3 3 R M/DD A M I'/MIB -0 EXTERNALS BNL(AMDTS'NLY) 1 DMB/DSS (AMDTS) 1 1 FEMA REP DIV 39 1 1 LPDR 03. 1 1 NRC. PDR>> 02 1. 1 NSIC 05 1 1 NT I' 1 1 PNL'RUEL'g'R 1 1

'TOTAL NUMBER'F COPIES REQUIRED:'TTR 54 ENCL 46

N$ ti 1 F I 1 <<T' 1' v 1 I.

f I O'<< f4 1 C<<4 f 1 ff fv<<

li

.<<F I > r'1 ~ ~

TJ TI I I

.<<1 <<, '4 f <<Hv 4<< II Hf I lt ) i 1/i> I > Nl f'1 <<f I '4 1(

T<<J f 4 iif <<4 TT << it H I ii<<1 T I 4 r,. <<4 f '1 f Ntl,'

li ~

I I <<Nl

'f I Ht<< I 4 4 S<<v',<< i T 'Tf) I r' It ~ fg>t <<<<lft'TT 4 Tf I ~ Jf

~

I T<<,ftI I I'1 ti

'f I5C I

Tf NTt HHL<<

FTIH T 9

. Il" I I 4" ,f I 'I I I

1 H H " "

I l

<<t 1 1 1 I 4 <I t iy iN>

I HH tv I, 4

Q tv vl i<<1 y ih 4 p I Ht

-INA I y 1 4,,(,

<<>I tl ]

<< I -. ~ Hill <<> 4 t" t J 1

Arizona Public Service Company ANPP-31369-EEVB/MFQ/TFQ December 7, 1984 Director of Nuclear Reactor Regulation Attention: Mr. George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3 Docket Nos. STN-50-528/529/530 Licensing Documents File: 84-056-026; 6.1.01.10

Dear Mr. Knighton:

As you are well aware, we have been submitting numerous letters which provide changes to existing licensing documents. We wi 11 not be able to issue amendments to these documents prior to the issuance of the PVNGS Unit 1 operating license. As we had agreed, we are hereby sub-mitting a listing of correspondence affecting these licensing documents as presently amended. This listing is attached and is arranged by licensing document.

We also agreed that when we do amend these licensing documents, we will identify any changes made from the letters previously submitted. The attachments to this letter will be supplemented, if necessary, just prior to the issuance of the operating license. The specific schedule for this supplement list will be established with Mr. E.A. Licitra, Licensing Project Manager.

Please contact Mr. W.F . Quinn of my staff if you have any questions on this matter.

Very truly yours, E. E. Van Brunt, Jr.

APS Vice President Nuclear Production EEVBJr/TFQ/no ANPP Project Director Attachments (1) PVNGS FSAR Correspondence List (2) PVNGS Emergency Plan Correspondence List (3) CESSAR FSAR Correspondence List cc: E. A. Licitra w/a A. C. Gehr w/a R. P. Zimmerman w/a 84ia>COSZ'7 8qqqOZ PDR ADOCK OS000528 A PDR

'0 ANPP-31369 STATE OP ARIZONA )

) ss.

COUNTY OP MARICOPA)

I, Donald B. Karner, represent that I am Assistant Vice President, Nuclear Production of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

Donald B. Karner Sworn to before me this M day of 1984.

otary Public Hy Commission Expgrew /g$7

~.',M'~jlmlss>0n &~'~~ ">"

~ ~

I

'i~

1 Cqn l

n P

~

ATTACHMENT 1 PVNGS FSAR Letters affecting the PVNGS FSAR which have not been incorporated as of Amendment 13.

DATE SUBJECT ANPP LETTER 0 May 25, 1984 Environmental Qualification 29604 August 1, 1984 Update to Section 14.2 30090 August 21, 1984 Categorization of Pressure 30290 Isolation Valves August 21, 1984 Changes to Appendices 30291 9A and 9B August 30, 1984 Changes to Chapter 17 30405 Sept'4, 1984 Changes to Chapter 13 30525 Sept 19, 1984 Steam Generator Tube 30572 Rupture Analysis Sept 19, 1984 Environmental Qualification 30579 Sept 27, 1984 Fire"Protection 30680 October 2, 1984 Changes to Appendix 13A 30701 October 5, 1984 Safety Related Bus Voltage 30747 tleasurement October 5, 1984 Initial Test Program 30752 October 9, 1984 Shutdown Cooling System 30776 Upgrade October 12, 1984 Exceptions to R.G. 1.143 30835 October 12, 1984 Change to Chapter 17 30836 October 15, 1984 Exception to R.G. 1.33 30840 October 15, 1984 Exception to R.G. 1.68 30841 October 15, 1984 Clarification to R.G. 1.58 30842 October 15, 1984 Withdrawal of R.G. 1.80 30844

0 I

<l

Page 2 ATTACHMENT 1 DATE SUBJECT ANPP LETTER 8 October 18, 1984 Exception to R.G. 1.30 30888 October 18, 1984 Exception to R.G. 1.83 30889 October 18, 1984 Clarification to R.G. 1.38 30890 and 1.123 October 29, 1984 Exception to R.G. 1.144 30983 October 29, 1984 Equipment qualification 30985 October 29, 1984 Changes to Appendix 14B 30984 November 1, 1984 Engineered Safety Features 31035 Actuation System November 5, 1984 Changes to PVNGS FSAR 31053 November 13, 1984 Response to Tech. Spec. question 31119 November 15, 1984 Exception to R.G. 1.33 31141 November 16, 1984 Response to Tech. Spec. 31156 questions November 21, 1984 Change to Section 17.2 31194

ATTACHMENT 2 PVNGS EMERGENCY PLAN Letters affecting the PVNGS Emergency Plan which have not been incorporated as of Revision 5.

DATE SUBJECT ANPP LETTER 8 August 16, 1984 Time Evacuation Analysis 30267 August 20, 1984 Augmented Shift Staffing 30234 October 5, 1984 Emergency Action Levels 30750 October 5, 1984 Augmented Shift Staffing 30751 November 29, 1984 Change FTS to HPN Phone 31251 System December 4, 1984 Augmented Shift Staffing 31323

k

~

~

~I ATTACHMENT '3 CESSAR - FSAR Letters affecting the CESSAR FSAR which have not been incorporated as of Amendment 9.

DATE SUBJECT C-E LETTER 8 June 14, 1983 Elimination of Pipe Whip LD-83-053 Restraints December 23, 1983 Elimination of Pipe Whip LD-83-108 Restraints February 24, 1984 ADV Block Valve Interface LD-84-009 Requirement l1arch 22, 1984 Reactor Coolant Gas Vent LD-84-013 System Sept 18, 1984 CESSAR Confirmatory Issues LD-84-051 Nos. 1 and 2 October 16, 1984 CESSAR Startup Testing LD-84-060 October 22, 1984 CESSAR Consistency Review LD-84-061 Changes December 5, 1984 CESSAR Consistency Review LD-84-069 i

Changes'1 lj I

'ecember 5, 1984 CESSAR Amendment 10 LD-84-070 r

D'ecember 5, 1984, High Pressure Safety LD-84-071 Injection Flow 1