ML17298B613
| ML17298B613 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 12/07/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| ANPP-31369-EEVB, NUDOCS 8412110327 | |
| Download: ML17298B613 (13) | |
Text
REGULATOR INFORMATION DISTRIBUTION TEM (RIDS)
ACCESSION NBRj8412110327 DOC ~ DATE: 84/12/07 NOTARIZED:, YES FAC'lL':STN 50 528 Palo Verde'uclear>> Stations Unit ii Ar izona Publ,i STN 50 529 Palo Vei de Nuclear Stationi Uni't 2i Arizona Publ,i STN 50-530 Palo Verde Nuclear Stationi Unit 3i Arizona Publi AUTH",NAME>>, AUTHOR AFFILIATION VAN BRUNTiE',E'.
Arizona Public Service Co, NEC IP ~ NAME'ECIPIENT AFFIL'IATION.
KNIGHTONg G i W ~
Licensing Branch 3
SUBJECT:
, Forwards listing of correspondence" affecting licensing documents as present-lyamended.Changes made in ltrs preViously submitted will be identified.'ISTRIBUTION
'CODE:
B001D COPIES RECEIVED:LTR,
'NCL SIZE:,
TITLE'. Licensing Submitta,l:
PSAR/FSAR Amdts 8, Related Correspondence NOTES:Standardized.plant,
'Standardized plant ~
"Standardi'zed plant; DOCKET 05000528 05000529 05000530 05000S28 05000529 05000530 RECIPIENT ID CODE/NAME, NRR/OL/AOL NRR LB3>> LA INTERNAL: ACRS 41 ELD/HDS3 IE'/DE P ER/EP B 36'E'/OQASIP/QAB21 NRR/DE'/AEAB NRR/DE'/EHEB NRR/DE/GB 28 NRR/DE'/MTEB 17 NRR/OE/SGEB 25.
NRR/DHFS/LQB 32'.
NRR/DL/SSPB NRR/D8 I'/AS B NRR/DSI'/CSB 09 NRR/DSI/METB 12,",
NRR/DSI'/RAB 2?.'.
04 RM/DD A M I'/MIB EXTERNALS BNL(AMDTS'NLY)
02 NTI' COPIES LTTR =ENCL>>
1>>
0 1
0 6'
1-0 1
1 1
0 1
1 2
1 1>>
1 1
1 1
~
0 1
1 1
1 ic 1
1 1
1
-0 1
1 1
1.
1 1
1 RECIPIENT ID CODE/NAME NRR LB3 BC LICITRAgE'1 ADM/LFMB IE F
ILE'E/DEPER/IRB 35 NRR ROE'iMaL NRR/DE/CEB 11 NRR/DE/EQB 13" NRR/DF/MEB 18 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DS I/AEB 26'RR/DSI/CPB10 NRR/OSI/ICSB 16 NRR/DS I/PSB 19 NRR/DSI/RSB
?3 RGN5 DMB/DSS (AMDTS)
LPDR 03.
NSIC 05 PNL'RUEL'g'R COPIES LTTR" ENCL" l
0 1
1 1
0 1
1 1
1 1
1 1
2 2
1 1
1 1c 1
1 1
1 1
1 1
1>>
1 1
1 1.
1 3
3 1
1 1
1 1
1 1
1
'TOTAL NUMBER'F COPIES REQUIRED:'TTR 54 ENCL 46
N$
ti F I 1
1 C<<4 f 1 ff
<<T' f
li
.<<F I 1'
v O'<< f4 I
fv<<
> r'1 TJ TI I I
~
~
1 1 I.
.<<1
<<, '4 f <<Hv 4<<
II T<<J Hf I lt
)
i 1/i>
f 4 iif
<<4 TT T
I 4 r,.
it H
I ii<<1
<<4 f
'1 f Ntl,'
I Nlf'1 <<f I
'4 1(
S<<v',<<
i T 'Tf) li ~
I r' I
I Ht<<
It
~
I I 4
fg>t
<<<<lft'TT 4 Tf I
~
<<Nl 4
Jf I
ti'f
~ T<<,ftI I I5C Tf I'1'fI NTt 9
. Il" HHL<<
FTIH T
<<t 1
" I I 4",f I
1 I 'I I H
H I
l 1
4 p
I 1
I 4
1 t iy iN>
<I I
HH tv I, 4
Q tv vl y
i<<1 ih I
Ht y
-INA
<< I -.
t" t
J
<<>I tl ]
~Hill <<>
4 1 4,,(,
1
Arizona Public Service Company ANPP-31369-EEVB/MFQ/TFQ December 7,
1984 Director of Nuclear Reactor Regulation Attention: Mr. George W. Knighton, Chief Licensing Branch No.
3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3
Docket Nos. STN-50-528/529/530 Licensing Documents File: 84-056-026; 6.1.01.10
Dear Mr. Knighton:
As you are well aware, we have been submitting numerous letters which provide changes to existing licensing documents.
We wi 11 not be able to issue amendments to these documents prior to the issuance of the PVNGS Unit 1 operating license.
As we had agreed, we are hereby sub-mitting a listing of correspondence affecting these licensing documents as presently amended.
This listing is attached and is arranged by licensing document.
We also agreed that when we do amend these licensing documents, we will identify any changes made from the letters previously submitted.
The attachments to this letter will be supplemented, if necessary, just prior to the issuance of the operating license.
The specific schedule for this supplement list will be established with Mr. E.A. Licitra, Licensing Project Manager.
Please contact Mr. W.F. Quinn of my staff if you have any questions on this matter.
Very truly yours, E. E.
Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVBJr/TFQ/no Attachments (1)
PVNGS FSAR Correspondence List (2)
PVNGS Emergency Plan Correspondence List (3)
CESSAR FSAR Correspondence List cc:
E. A. Licitra w/a A. C. Gehr w/a R.
P.
Zimmerman w/a 84ia>COSZ'7 8qqqOZ PDR ADOCK OS000528 A
'0
ANPP-31369 STATE OP ARIZONA
)
) ss.
COUNTY OP MARICOPA)
I, Donald B. Karner, represent that I am Assistant Vice President, Nuclear Production of Arizona Public Service
- Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its
- contents, and that to the best of my knowledge and belief, the statements made therein are true.
Donald B. Karner Sworn to before me this M
day of 1984.
otary Public Hy Commission Expgrew /g$7
~.',M'~jlmlss>0n &~'~~ ">"
~
~
I
'i~
1 Cqn l
n P
~
ATTACHMENT 1 PVNGS FSAR Letters affecting the PVNGS FSAR which have not been incorporated as of Amendment 13.
DATE May 25, 1984 August 1, 1984 August 21, 1984 August 21, 1984 August 30, 1984 Sept'4, 1984 Sept 19, 1984 Sept 19, 1984 Sept 27, 1984 October 2, 1984 October 5, 1984 October 5, 1984 October 9, 1984 October 12, 1984 October 12, 1984 October 15, 1984 October 15, 1984 October 15, 1984 October 15, 1984 SUBJECT Environmental Qualification Update to Section 14.2 Categorization of Pressure Isolation Valves Changes to Appendices 9A and 9B Changes to Chapter 17 Changes to Chapter 13 Steam Generator Tube Rupture Analysis Environmental Qualification Fire"Protection Changes to Appendix 13A Safety Related Bus Voltage tleasurement Initial Test Program Shutdown Cooling System Upgrade Exceptions to R.G. 1.143 Change to Chapter 17 Exception to R.G. 1.33 Exception to R.G. 1.68 Clarification to R.G. 1.58 Withdrawal of R.G. 1.80 ANPP LETTER 0 29604 30090 30290 30291 30405 30525 30572 30579 30680 30701 30747 30752 30776 30835 30836 30840 30841 30842 30844
0 I
<l
ATTACHMENT 1 Page 2
DATE October 18, 1984 October 18, 1984 October 18, 1984 October 29, 1984 October 29, 1984 October 29, 1984 November 1,
1984 November 5, 1984 November 13, 1984 November 15, 1984 November 16, 1984 November 21, 1984 SUBJECT Exception to R.G. 1.30 Exception to R.G. 1.83 Clarification to R.G. 1.38 and 1.123 Exception to R.G. 1.144 Equipment qualification Changes to Appendix 14B Engineered Safety Features Actuation System Changes to PVNGS FSAR
Response
to Tech.
Spec.
question Exception to R.G. 1.33
Response
to Tech.
Spec.
questions Change to Section 17.2 ANPP LETTER 8 30888 30889 30890 30983 30985 30984 31035 31053 31119 31141 31156 31194
ATTACHMENT 2 PVNGS EMERGENCY PLAN Letters affecting the PVNGS Emergency Plan which have not been incorporated as of Revision 5.
DATE SUBJECT ANPP LETTER 8 August 16, 1984 August 20, 1984 October 5, 1984 October 5, 1984 November 29, 1984 December 4,
1984 Time Evacuation Analysis Augmented Shift Staffing Emergency Action Levels Augmented Shift Staffing Change FTS to HPN Phone System Augmented Shift Staffing 30267 30234 30750 30751 31251 31323
k
~ ~
~ I ATTACHMENT '3 CESSAR - FSAR Letters affecting the CESSAR FSAR which have not been incorporated as of Amendment 9.
DATE June 14, 1983 December 23, 1983 February 24, 1984 l1arch 22, 1984 Sept 18, 1984 October 16, 1984 October 22, 1984 December 5,
1984 i
lj I
'ecember 5, 1984 D'ecember 5, 1984, SUBJECT Elimination of Pipe Whip Restraints Elimination of Pipe Whip Restraints ADV Block Valve Interface Requirement Reactor Coolant Gas Vent System CESSAR Confirmatory Issues Nos.
1 and 2
CESSAR Startup Testing CESSAR Consistency Review Changes CESSAR Consistency Review Changes'1 CESSAR Amendment 10 r
High Pressure Safety Injection Flow 1
C-E LETTER 8 LD-83-053 LD-83-108 LD-84-009 LD-84-013 LD-84-051 LD-84-060 LD-84-061 LD-84-069 LD-84-070 LD-84-071